A matte acrylic wardrobe looks effortless on a rendering and disappointing on site when the two teams never agreed on what "matte" means, how tall the carcass runs, or who signs off the door edge. Below is the alignment checklist we use on residential and villa projects, written for both sides of the table — the designer who sets the look, and the buyer or project manager who has to get it delivered.

Start With the Finish Name, Not the Finish Photo

"Matte" covers a wide range of surface behaviour. A soft-touch acrylic, a low-sheen lacquer and a matte melamine all read similarly in a mood board but differ in fingerprint resistance, edge treatment and how they respond to cleaning agents. Before any drawing is issued, both sides should agree on the exact product line being specified — for example our matte acrylic wardrobes — and record the reference on the drawing sheet rather than relying on an image alone.

Where a project needs contrast rather than a single flat field, decide early whether the doors mix finishes. A two tone acrylic wardrobe introduces a second panel material, a different joint detail and a second colour approval, so it should be priced and sampled as its own item instead of being treated as a variant at order stage.

Agree the Door System Before the Layout Is Frozen

The door system drives the room, not the other way round. Sliding doors need clear travel space and a headrail or floor track detail; hinged doors need swing clearance in front of beds, vanities and corners. A matte sliding door wardrobe is often the right answer in a narrow bedroom, but only if the designer has confirmed the track detail and the buyer has confirmed the floor build-up that the track sits into.

For walk-in layouts, the same decision repeats at a larger scale: island units, corner returns and full-height bays each need their own dimension sign-off. We build to the drawing, so any change after sign-off is a change order, not a tweak.

Dimension Sign-Off: Who Measures, and When

This is the single most common source of friction. Our wardrobe ranges are made to measure — sizing, layout and finish are specified per project — which means the production file is only as good as the dimensions supplied to it. Because we work as a custom furniture manufacturer, drawings can be adjusted before release; they cannot be adjusted afterwards without a change order. Both parties should confirm in writing:

  • who takes the site dimensions, and at which construction stage (after floor levels, plaster and skirting are set);
  • the finished floor level, ceiling level and any services that run behind or above the carcass;
  • whether the unit runs to the true ceiling or stops below a shadow gap, cornice or lighting cove;
  • out-of-plumb and out-of-square tolerances, and who carries the scribing work on site.

Practical rule: dimensions are confirmed against completed shell conditions, not against architectural drawings alone. We measure with a project team on villa and apartment work and reconcile our survey against their drawings before the carcass is released to production.

Interior Configuration Is a Design Decision Too

Exterior appearance usually gets all the attention, while the internal plan is left to whoever fills in the shop drawing. Shelving heights, drawer banks, hanging rails at two levels, pull-out accessories and integrated lighting all change cost and lead time, and some of them affect carcass depth. Designers should issue an internal elevation for each bay; buyers should make sure it is priced on that basis rather than on a generic "wardrobe, one line" item in the bill of quantities.

Integrated lighting deserves its own agreement: cable routes, transformer position and a switch or sensor type all need to be shown before the electrical first fix, not discovered during installation.

Sampling and Approval: Set the Gate

Colour on a screen is not colour on a door. For any matte acrylic specification we recommend both sides commit to a physical sample before full production — a door sample showing the face, the edge and, ideally, a corner joint. The approval record should carry the sample reference, the approving name and the date, because that record is what protects the buyer at handover.

Where several rooms carry the same finish, agree one approval that covers all of them and note any quantity difference; batches made at different times should be checked against the retained sample on delivery.

Scope, Delivery and Installation: Write Down the Handover Point

A wardrobe crosses several trades. The alignment document should state plainly who supplies and who installs, how the unit is protected in transit and on site, and what happens if a wall is re-rendered after measurement. As a manufacturer working from design through production and door-to-door delivery, we can take responsibility for packing, container loading and shipment documentation, and coordinate installation support — but the boundary has to be named in the order, not assumed.

ItemDesigner confirmsBuyer / project team confirms
FinishProduct line and sample referenceApproved sample, retained for handover
Door systemSliding or hinged, clearance diagramsFloor build-up, track recess, traffic path
DimensionsLayout drawing per baySite survey after shell completion
Interior planInternal elevations, lighting intentPriced configuration, electrical first fix
DeliveryAccess route and unit sizesReceiving, storage, installation window

What to Send Us When You Are Ready to Specify

To move from enquiry to a firm quotation in one round, send the room layout with dimensions, your chosen finish reference, the door system you want, and the internal configuration you expect. If the drawings are still at concept stage, send those too — we work from design intent as well as finished documentation, and an early review usually catches the clearance and dimension problems that later become change orders.

Note: dimensions, materials and selected specifications are confirmed for each project individually. The details above describe how we coordinate wardrobe projects, not a fixed specification for every unit.

SANTERSON — China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Enquiries: https://www.santerson.com/contact/