A freestanding cabinet looks simple on a drawing: a box on the floor, doors in front, shelves inside. It is only once production starts that the gaps appear — the unit sits proud of the tile line, the finish does not match the joinery beside it, or the interior layout cannot take the items it was meant to hold. Because our freestanding cabinets are made to measure rather than picked from a standard catalogue, every one of those variables has to be settled on paper before the panels are cut. The list below is what we ask project teams to confirm, and it applies whether you are specifying a bathroom storage unit or a freestanding display cabinet for a living area.
1. Which collection the unit belongs to
The same basic form appears in more than one part of our range, and the specification conversation differs for each. A storage unit in a bathroom is judged against basin and countertop lines, moisture and daily handling. A display cabinet in a living room is judged against sightlines, lighting and what it shows. Confirm which collection you are ordering into first, because it changes what has to be verified later.
- Bathroom storage: freestanding cabinets, drawer units, corner storage and open storage all sit in the Storage Units collection and share made-to-measure sizing.
- Living-area display: freestanding cabinets, curio cabinets and illuminated display cabinets sit in the Display Cabinets collection.
- Media and shelving: freestanding TV cabinets and freestanding open shelves follow the same bespoke approach but carry different loading and services questions.
Naming the collection early stops a bathroom-grade specification being quoted for a living-room piece, or the reverse.
2. Dimensions taken from the finished room, not the shell
Made-to-measure only works if the measurement reflects the room as it will be handed over. The figures we need are the ones taken after tiling, plastering, skirting and any wall lining are complete.
- Total height, width and depth, plus where the unit sits relative to doors, switches, radiators and extract grilles.
- Floor finish build-up. A cabinet ordered against a screed drawing will sit too low once stone or timber is laid.
- Whether the back panel runs full height or stops short of a skirting or pipework chase.
- Clearance for door swing and drawer pull, including anything that opens across a corner or a vanity.
For bathroom units we also check the relationship to the basin and countertop runs before production, since the two are usually specified separately and then have to meet on site.
3. Materials and finish, matched against what is already approved
Freestanding cabinets in our range take a choice of substrate, board material and surface finish, and the sensible way to specify them is alongside the cabinetry and panelling already approved for the project. A unit that reads well alone can look wrong next to an existing door front or wardrobe.
- Surface type — lacquer, laminate, veneer or painted panel — and whether the sheen level matches adjacent work.
- Colour and grain direction, confirmed against a physical sample rather than a screen render.
- Edge treatment and handles or handleless detailing, which change how the carcass reads up close.
- For bathrooms, the material selection is made with the room's humidity and cleaning regime in mind; we confirm the suitability of each option for the specific location rather than assuming a finish carries across from a bedroom.
Where a project needs a bespoke texture, colour or branded detailing, that goes through our custom and OEM service, which covers material and finish selection, prototyping and detail confirmation before serial production.
4. Interior layout agreed against what will actually be stored
The interior is where custom work either earns its cost or wastes it. Before we produce a carcass, we want the contents defined: linen, towels, glassware, cleaning products, small appliances, books or display objects each need different shelf heights, drawer depths and load ratings.
- Shelf spans and adjustable versus fixed shelves — long spans under load will deflect if not specified.
- Drawer configuration and runner type, including soft-close where required.
- Open versus closed ratio. Mixed open and closed storage is usually the practical answer, but it should be a deliberate split, not a default.
- Intended loading for open shelving and glass shelves, confirmed per project rather than assumed.
5. Lighting and services if the unit carries them
An illuminated display cabinet or a cabinet with internal lighting needs its electrical specification settled before production, not after delivery. That includes fitting type, driver location, switching, and where the cable is routed out of the carcass.
- Confirm the first-fix position and isolator on site against our drawing.
- Confirm low-voltage versus mains specification and the dimming arrangement if one is required.
- For integrated cabinet lighting ordered as part of a wider fit-out, make sure the same detail appears on both the joinery and electrical drawings so nothing is quoted twice or missed.
6. Hardware, anchorage and floor conditions
A freestanding unit still has to be secured, and the fixing method depends on what it is standing on and how tall it is.
- Floor construction — screed, timber deck, floating floor or tiled slab — determines anchor type and whether a site survey is needed.
- Levelling allowance for floors that are not level across the cabinet footprint.
- Plinth or recessed base detail, and how it meets the surrounding floor finish.
- Anti-tip anchorage requirements for taller units, agreed with the local contractor before installation.
These are site conditions we cannot see from a drawing, so for projects abroad we ask for the setting-out plan and floor build-up details rather than relying on a single dimension.
7. Quantities, phasing and delivery packaging
Custom units are produced in batches, so the schedule has to match how the rooms are actually being handed over.
- Unit-by-unit quantities by room or apartment type, with any repeats identified as a single approved specification.
- Whether one production run is required or whether later phases can follow once a first batch is signed off.
- Packaging and container loading planned around the site's storage space and lift access — a cabinet delivered assembled needs different handling from a flat-packed carcass.
- Freight mode, documents and delivery address settled with our logistics team, who handle sea, air and rail forwarding, customs paperwork and door-to-door delivery.
Sign-off list before production starts
- Collection and product type confirmed for each location.
- Dimensions taken from the finished room, with floor build-up noted.
- Material, colour and sheen approved against a physical sample.
- Interior layout mapped to the intended contents and loading.
- Lighting and electrical details on both joinery and services drawings.
- Anchorage method agreed with the site contractor.
- Quantities, phasing and delivery packaging confirmed.
One practical note: product pages in our catalogue list made-to-measure sizing and finish options rather than fixed dimensions. Treat any dimension or specification on a page as something to confirm for your own project, not as a standard size we hold in stock.
If you are specifying storage or display joinery for a villa, apartment or hospitality project, send us the room drawings and the finishes already approved, and we will come back with a specification to review before anything goes into production. As a single source for furniture and building materials, we can carry that same specification through cabinetry, panelling, ceramics and lighting on one set of drawings.