A swim spa of this size rarely fails because of the shell. It fails on the paperwork around it: one missing option, one late dimension change, one power feed that never matched the finished configuration. The checklist below shows how buyers, contractors and project managers quantity and coordinate Outdoor Swim Spa WS-PC08ST-L alongside the surrounding patio package.

SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects. A swim spa sits inside that scope rather than beside it: it has to be ordered, shipped, installed and finished together with the poolside furniture, paving, screens and lighting around it. That is why quantity planning should start with the whole outdoor zone, not with a single product line on a purchase order.

Start With the Catalog Specifications, Then Confirm Your Own

The published catalogue entry for WS-PC08ST-L gives you a workable starting point. Treat it as a baseline to be confirmed against your site conditions and final configuration — never as a substitute for a written specification.

Item shown in the catalogueCatalogue entryWhat you confirm before ordering
Footprint8490 × 2400 × 1470 mmClear opening, access route, crane or forklift path, and clearance for servicing the plant area
Control system1 setLocation of the control point relative to the finished deck
Swim training system1 setWhich swim-current arrangement is included in your quotation
Filter pump1 pcWhether a separate water pump is quoted — the catalogue does not list one for this model
Jet total6 pcsJet layout and count in your confirmed configuration
LED lights4Fixture positions before the coping and surround are fixed
Total power6.55 kWSupply capacity, circuit sizing and protection by your local electrician to local wiring rules
Features shownWater jets, LED lighting, Ozone, swim training systemWhich of these are standard and which are optional in your package

That last row matters more than it looks. Two identical-looking models can carry different option sets, and the total power figure moves as soon as a heat pump or extra pump enters the deal. Ask for the specification to be restated in the quotation, with each option priced on its own line.

Two figures to reconcile before you sign: the catalogue lists "Water pump: Not listed" for this model while showing a filter pump as included, and it states total power as 6.55 kW for the configuration shown. Both change once options are added, so get the final configuration in writing rather than relying on the catalogue page.

Quantity Planning: What Goes On the Order

Split the order into four groups. This is how purchasing teams at villa and resort projects keep the package reviewable, and it prevents the common situation where the spa arrives but its accessories are still on another purchase order.

1. The unit itself

  • Quantity is set by the layout, not by the catalogue. One long 8490 mm shell needs a run of deck that can take it; a resort or multi-villa development is quantified per zone or per unit type.
  • Where more than one unit appears in a project, group them by identical configuration. Mixed option sets across otherwise identical spas multiply the installation and handover work.

2. Catalogue-listed options for this range

Options listed for the configurable outdoor swim and hydrotherapy range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each line is confirmed against WS-PC08ST-L specifically.

  • Insulation — decide early. It affects the plant enclosure and how the unit behaves in cooler months, and it is far cheaper to specify than to retrofit.
  • Steps — quantity per access point, and confirm their position before coping and paving are set out.
  • Heat pump and water pump — these drive the electrical load. Quantify them with the electrician's circuit design in front of you.
  • UV sterilisation and sand filtration — confirm whether they replace or supplement the standard treatment shown for the model.

3. Site works you must quantify separately

  • Structural slab or plinth sized to the delivered footprint and the local ground conditions.
  • Electrical supply, protection devices and a dedicated circuit — carried out by your own contractor under local wiring rules.
  • Drainage, overflow and water fill provision at the installation point.
  • Deck, coping and paving finishes cut to the finished shell dimensions, including service access.

4. The surrounding poolside package

This is where a one-stop supplier earns its keep. Loungers, dining sets, daybeds, swing benches, pergolas and privacy screens are ordered against the same drawing as the spa, so one set of dimensions governs everything.

Coordination Sequence That Prevents Rework

SANTERSON's turnkey workflow runs through consultation, design and planning, production, logistics, installation and after-sales. Applied to a swim spa purchase, that sequence looks like this:

  • Brief and layout. Fix the spa position, orientation and access route on the drawing before anything is quoted. The 8490 × 2400 mm footprint should sit on the same plan as the paving set-out.
  • Specification and quotation. Confirm every option line — pumps, heat pump, insulation, steps, treatment — and have the electrical load restated for the confirmed configuration.
  • Production. Once options are signed off, changes become expensive. Freeze the specification before production starts.
  • Logistics. Freight is arranged by sea, air or rail with customs paperwork and door-to-door delivery. Tell the supplier the exact delivery address, access constraints and unloading method; a long shell needs an achievable route from the truck to the plinth.
  • Installation and handover. Site works, electrical connection and commissioning are carried out in sequence, with inspection and snagging recorded. Confirm warranty terms, spare-parts supply and maintenance arrangements for your specific installation.
Scope boundary worth stating plainly: the supplier handles manufacturing, freight and delivery coordination plus installation and after-sales support. Electrical connection, drainage and civil works are done by your local trades to local requirements. Confirm who does what in writing before the unit ships.

A Pre-Order Checklist

  • Footprint, access route and service clearance checked against site measurements.
  • Option list confirmed line by line, with prices separated.
  • Final total power stated for the confirmed configuration and passed to the electrician.
  • Steps, LED positions and control point fixed on the drawing before coping is set out.
  • Poolside furniture ordered from the same drawing and the same purchase round.
  • Delivery address, unloading method and site access agreed with the logistics coordinator.
  • Warranty scope, spare parts and maintenance terms confirmed for this installation.

Ordering It as Part of a Whole Outdoor Zone

Projects that specify the spa together with turnkey villa furnishing avoid the sequencing problem entirely: one team holds the drawing, the product specification and the shipment schedule. If your project also covers indoor fit-out — cabinetry, wall panelling, flooring, lighting — the same procurement round can cover it, with furniture and building materials from one manufacturer.

Send us your layout and option list

Share the deck drawing, the model reference WS-PC08ST-L and the options you are considering. We will confirm the configuration, the electrical load for that build-up and a coordinated quotation for the spa and the poolside package around it.