A concealed door looks simple on a drawing: a flush panel, no visible frame, no hardware in sight. On site it is one of the least forgiving items to install, because everything that could go wrong — out-of-square openings, floor levels, wall build-ups, finish seams — shows up the moment the panel is hung. This guide walks through how we plan freight and on-site installation for Santerson Decorative Concealed Doors on villa and residential fit-out projects, from the opening dimension to the final handover, so the doors arrive ready for the trade that hangs them.
What Makes Concealed Door Installation Different
Santerson Decorative Concealed Doors are made-to-measure: sizing, layout, material and finish are specified per space rather than picked from a stock range. That flexibility is the point of the product, but it also means the door cannot be corrected on site. A standard cased opening can absorb a few millimetres; an invisible hinge line and a wall-to-panel joint cannot.
Three things decide whether installation runs cleanly:
- The opening, not the door. Height, width, wall thickness and floor finish level all have to match the recorded order dimensions at the moment the panel arrives, after plaster, render, tile and flooring are complete.
- Sequencing with wet trades. Concealed doors should be hung after wall finishes and floor levels are final. If they arrive earlier, they sit in the corridor waiting, and waiting is where panels get damaged.
- Finish matching. The decorative face has to meet the surrounding wall treatment cleanly. Where the same project also uses Integrated Door & Paneling, the panel and the cladding should be produced together so grain, sheen and joint lines read as one surface.
Before Production: Locking Down What Ships
Delivery problems usually start as specification gaps. Santerson Decorative Concealed Doors are configured per project — made-to-measure sizing with material and finish options — so the following has to be agreed before the order is released for production:
- Opening dimensions taken from the finished condition, or clearly marked as structural dimensions with the expected build-up stated.
- Swing direction, hinge side and clearance in front of the opening, including anything that will sit on the floor nearby.
- Selected face material and finish, and how the panel edge is intended to meet the wall — shadow gap, flush joint or covered by panelling.
- Total door schedule: quantity per unit or floor, so panels can be labelled against room references instead of generic numbers.
This list also protects you commercially. Once dimensions and finishes are confirmed at the quotation stage, there is nothing left to renegotiate when the container arrives.
Packing and Freight Planning
Concealed door panels travel as flat, oversized items with a finished face that must survive the journey. Our logistics covers sea, air and rail freight forwarding, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery, so the doors move with the rest of the joinery package rather than as a separate, easily lost consignment.
For concealed doors specifically we plan:
| Item | What to confirm before shipping |
|---|---|
| Packaging | Edge protection and face protection on every panel; rigid corner guards for the hanging edge. |
| Labelling | Each panel marked with room reference, opening number, swing direction and size, matching the door schedule used on site. |
| Container loading | Panels loaded last and on top of cabinetry runs, so nothing heavy bears on a finished face. |
| Documents | Commercial invoice, packing list and origin paperwork aligned with the rest of the fit-out shipment to avoid split customs clearance. |
| Arrival window | Delivery date set against the site programme, after wall finishes and floor levels are complete. |
If the same project also orders wardrobes, cabinetry or other interior doors, grouping them in one coordinated shipment gives you a single clearance event and one delivery slot to manage on site.
Site Readiness: The Checklist That Prevents Rework
Before the panels come out of the crates, walk the openings with this checklist. It is the difference between a half-day hang and a snag list.
- Wall build-up thickness measured at each opening, not assumed from one sample point.
- Floor finish level complete, with the intended threshold or no-threshold detail agreed.
- Openings square and plumb; any deviation recorded and reported before panels are unpacked.
- Wall finishes cured and dry, so hanging fixings are not driven into wet substrate.
- Clear, protected storage for panels on site — flat, dry, off the ground, faces apart.
- Other trades finished along the same wall run: skirting, architraves, switch plates, panelling.
Installation Sequence on Site
1. Dry fit before fixing
Offer each panel to its opening, check the gap all round and confirm the swing before any permanent fixing. Mark the hanging line and the finish face orientation at the same time.
2. Hang and adjust
Hang the panel, then set the reveal to a consistent width top, bottom and hanging edge. Concealed hardware only looks right when the tolerance is even; an uneven gap is immediately visible even when the door works perfectly.
3. Close the joint line
Complete the junction between panel and wall — shadow gap, flush trim or panel continuation — before any final decorating touch-up on the surrounding surface.
4. Snag and sign off
Our installation and after-sales support includes on-site installation, inspection with a snag list, warranty coverage, spare parts or replacement, and ongoing maintenance. For concealed doors we inspect each opening against the schedule: operation, gap consistency, face condition and finish match, then record any item that needs follow-up rather than leaving it to be discovered at handover.
Handover Records Worth Keeping
At completion, keep three documents against the door schedule: the confirmed dimension and finish sheet from production, the snag list with items closed out, and the selected finish reference for each panel. Concealed doors age differently from ordinary ones — if a panel ever needs replacing, matching a discontinued face or an undocumented opening size becomes a full re-order rather than a like-for-like swap.
Ordering Concealed Doors as Part of a Larger Package
Concealed doors rarely stand alone on a villa or hospitality job. They sit inside cabinetry runs, panelled walls and interior door schedules, and those items share the same wall lines and finish references. Sourcing them through one one-stop furniture and building materials supplier means one set of drawings to reconcile, one production window, one shipment and one installation team — which is where the coordination savings actually come from. Our interior design services cover space planning, product specification and project design coordination, so the door schedule is checked against the joinery drawings before anything is manufactured rather than after.
Planning concealed doors for a current project?
Send us your door schedule and wall finish details. We will confirm sizing, finish options, packing and an installation sequence that fits your site programme — contact SANTERSON to start the specification review.