The Wall Hung Basin 1038WB is one of the more flexible items in our bathroom range: a vitreous ceramic wash basin that fixes to the wall through a back panel, so it takes up no floor area and leaves the wall beneath it easy to clean. Because it appears in guest washrooms, villa bathrooms and commercial restrooms at the same time, buyers rarely order one version of it. This article sets out the decisions you should settle with us before an order is placed, so the basin arrives ready for the wall, the tapware and the traffic it will actually face.

Why a wall hung basin gets specified differently from project to project

A wall mounted basin sits above the floor, so three things drive its specification that a pedestal or vanity basin does not: what is behind the wall, where the waste and water lines land, and how heavily the room will be used. A guest powder room in a villa and a mall restroom have almost nothing in common on those three counts, yet both can use the same shell shape.

The published description of 1038WB covers a minimalist profile with proper basin depth to limit splashing, in a shape that suits several decoration schemes. Everything beyond that — mounting detail, tap arrangement, matching pieces — is decided per project. That is where the conversation below matters.

Mounting and wall preparation

  • Wall build-up. Tell us what the finished wall is: masonry, light-gauge framing with boarding, or an existing tiled surface. The back-panel fixing behaves differently on each, and it decides whether additional support framing is needed behind the basin zone.
  • Finished floor level. Send the completed floor line, not the structural slab. Rim height is set from the finished level, and getting this wrong is the most common reason a wall basin has to be re-manufactured.
  • Waste route. State whether the waste drops in the wall or turns into the floor, and where the trap sits. We produce to your drawing rather than assuming a standard rough-in.
  • Tiling sequence. Decide whether tiles are set before or after the basin is fixed. It changes the projection of the back panel and the edge detail where porcelain meets tile.

Tapware and washhole configuration

Before we cast, confirm which of these applies to each bathroom type:

  • No washhole, for wall-fed mixers or spouts that deliver water over the rim.
  • Single washhole, for one-lever pillar mixers — the usual choice in guest washrooms and hotel rooms.
  • Three-hole arrangement, where a tall pillar mixer is flanked by two handles.

Also send the tapware reach you have selected. A short spout on a deep basin splashes; an over-long spout on a shallow one throws water past the rim. Basin depth and spout projection are chosen together, not in isolation.

Size, proportion and the rest of the room

Our bathroom range includes wall hung basins at published sizes such as 510 × 420 × 380 mm and 495 × 440 × 390 mm, so a compact shell is available when the room is tight. Where you want 1038WB scaled to a specific niche — a narrow villa powder room, a row of basins in an office floor restroom — send the clear width between finishes and the mirror or cabinet line above it, and we will confirm proportion before tooling.

For exact dimensions of 1038WB itself, request the current technical sheet with your enquiry; figures are confirmed against the drawing at order stage rather than assumed from marketing pages.

Surface colour and glaze

  • Colour body. Beyond standard white, tell us the RAL or sample reference you are matching — basins in a boutique hotel often follow the wall or joinery palette rather than being left white.
  • Glaze finish. Gloss is the default and wipes clean quickly; a softer sheen reads warmer against timber and stone but needs different cleaning guidance for housekeeping.
  • Edge detail. Square rim for a crisp modern line, or softened edge where children or high traffic are factors.

Matching pieces and series consistency

Bathrooms read as designed when the porcelain repeats. Our Bathroom Sanitary Fixtures range covers wall hung and floor standing WCs, pedestal basins and bidets alongside the wall basins, so a guest-floor package can be specified from one source. Where an existing series is already fixed in a design — for example the 1050 range with its gold line detail, or the 1004 range with its trapezoid profile — send us the model numbers and we will match shape and glaze across the order.

Accessories and service items

  • Waste and trap. Confirm whether click-mixer waste or open waste is required, and whether traps ship with the basins or are sourced locally to reduce freight volume.
  • Spare shells. For hotel and commercial orders we can hold a batch of spare basins against future breakage; size that quantity from room count and expected wear, not from guesswork.
  • Packaging. State the packing standard your site accepts — individual cartons for lift-and-carry installs, or crated consolidations for container loads.

Ordering quantities and lead time

These basins are made for wholesale and project volumes. Give us the room schedule — quantity per bathroom type, and which floors or buildings each group serves — and we will quote tooling, unit price and production split accordingly. Mixed configurations within one order are normal: a three-hole arrangement for the master bathrooms, single-hole for guest washrooms, no hole where wall-fed spouts are used.

How this fits a wider fit-out

Basins are rarely bought alone. As a one-stop furniture and building materials supplier, we produce bathroom ceramics alongside kitchen cabinetry, flooring, wall and ceiling finishes, lighting and joinery, so the porcelain glaze, the vanity timber and the wall panel can be approved in one set of samples. If your project needs that coordination, our turnkey interior project solutions cover design coordination through production, delivery and installation.

Send with your enquiry

  • Room schedule: quantity by bathroom type, per floor or building
  • Set-out drawing: finished floor level, waste route, water supply positions
  • Tapware selection with spout reach and mounting type
  • Colour and glaze reference (RAL, sample, or existing model number)
  • Waste/trap preference and whether spares are required
  • Destination port or site address for freight quotation

Figures such as basin dimensions, trap type and rough-in positions are confirmed against the technical sheet issued with your order. We do not publish them as fixed values on this page, because mounting details vary with wall construction and local plumbing practice.

Frequently asked questions

Can 1038WB be ordered without a tap hole?

Yes. Tell us the mixer type; wall-fed spouts and concealed mixers need no washhole, while pillar mixers need one or three.

Is the basin strong enough for public restrooms?

It is made from dense vitreous ceramic with a glaze that resists water staining and limescale, which suits high-use rooms. What matters commercially is the fixing detail into your wall build-up, so send the wall construction and we will confirm the mounting arrangement for that setting.

Can you match basins already installed in a refurbishment?

Send photographs plus any model markings, along with measured dimensions. We compare against our existing moulds first; where nothing matches, we can tool a custom shell to your drawing.

What is the minimum order?

These basins are supplied for wholesale and bulk project orders, so the practical minimum depends on whether you are taking stock production or a custom configuration. Send the room schedule and we will state it with the quotation.

Talk to us about your bathroom package

Send your room schedule and set-out drawing, and we will return a configuration sheet for 1038WB — washhole arrangement, colour body, mounting detail and matching pieces — before any production is committed. Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com.