A swim spa quotation only works when the specification behind it is unambiguous. This guide shows buyers, project managers and procurement teams how to write a complete product specification for Outdoor Swim Spa WS-S38, so the shell, equipment, electrical supply and site preparation all match before production starts.

Why the Specification Matters More Than the Model Number

Outdoor swim spas are sold as configured systems, not fixed catalogue items. Two units carrying the same model code can differ in pump count, jet layout, filtration method, heating choice and insulation package. If a purchase enquiry only states "WS-S38, one set", the supplier has to guess, and the quotation that comes back may not be the unit your site was designed to receive.

A written specification solves this. It becomes the reference for the proforma invoice, the packing list, the installation brief and the acceptance check on delivery. For villa gardens, resort terraces and private-club installations, it also prevents the most common source of dispute: equipment that was assumed to be included but was actually quoted as an option.

Start With the Fixed Shell Envelope

Record the external dimensions exactly as published for the model, and state whether those figures include steps, coping or any perimeter cladding. For this model the catalogue lists:

Specification itemCatalogue entry for WS-S38
ModelWS-S38
Catalogue dimensions3760 × 2080 × 1110 mm
Control system1 set
Water pump3 pcs
Filter pump1 pc
Jet total51 pcs; 6 water columns
LED lights4 pcs; 12 small LED lights
Total power14.05 kW
Features shown on the product pageWater jets, LED lighting, Ozone, Waterfall
Swim training systemNot listed for this model

Treat these as catalogue reference values for the standard configuration. In your own document, add a second column headed "Confirmed for this order" and have the supplier initial each line. Where an item is not listed on the page — the swim training system in the table above, for example — write "not included unless separately confirmed" rather than leaving it blank. A blank cell invites an assumption; a written exclusion does not.

Dimension discipline: 3760 × 2080 × 1110 mm is the footprint you design around, but access routes matter as much as the final position. Note door widths, lift capacity, turning radii and the distance from the delivery vehicle to the prepared base in the same specification sheet.

Split Equipment Into Standard and Optional

The catalogue for this range lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as optional accessories. Availability and compatibility vary by model, so each option needs a yes/no line in your specification rather than a general request for "a full package".

  • Water treatment: state whether ozone is required, whether UV sterilisation is added on top of it, and which filtration route applies — the standard filter pump or an added sand filtration unit.
  • Heating: name the heat source you want and confirm the control system covers it. Heating choice drives running cost more than any other single line in the document.
  • Insulation: specify the insulation package if the unit will run year-round in a cool or exposed location, because this affects both cabinet build and energy demand.
  • Water features: the waterfall is shown on this model's page; confirm flow arrangement and whether it shares a pump with the jet circuit.
  • Access and seating: steps are listed as an option. Record their side of the shell, since that decision is fixed once the base is poured.

Jet count deserves special attention. Fifty-one jets plus six water columns is a dense hydrotherapy layout, and the way those circuits are grouped determines how the unit feels in use and how it can be serviced later. Ask for the jet map with circuit grouping, not just a total number.

State the Electrical Requirement as a Hard Number

Total power for the standard configuration is listed at 14.05 kW. That figure is the starting point for the electrical design, and it changes with every option you add or remove. Your specification should therefore record three separate items:

  • The total connected load of the confirmed configuration, in kW.
  • Supply requirements — phase, voltage and frequency available at your site, and whether a dedicated circuit and isolator are required.
  • Who is responsible for the final connection: the supplier's installation team, your electrician, or neither until it is agreed in writing.

Getting this wrong is expensive. An under-rated supply means the unit cannot run its full feature set; a last-minute electrician visit adds cost to a project that had already been priced. Write the electrical line before you request the quotation, not after.

Cover Site Preparation and Base Works

The product specification should say what the unit sits on and who prepares it. A full sheet normally names:

  • The base type — reinforced slab, compacted sub-base on a deck structure, or an existing terrace with confirmed load capacity.
  • Drainage and overflow route, including where discharged water goes during draining and maintenance.
  • Access for the filter pump and control system after installation, since service panels need clearance that is easy to forget at design stage.
  • Wind, sun exposure and any screening or pergola above the unit, which affects both cabinet finish and lighting effect at night.

Use a Consistent Line-Item Format

The clearest buyer-side specification uses one table with five columns: item, catalogue value, required for this project, confirmed by supplier, and remarks. Every row ends with a written value. Rows to include at minimum:

  • Model code and shell dimensions, including how steps are counted.
  • Pump schedule — water pumps, filter pump, and any added pump for the waterfall or jet circuits.
  • Jet inventory with circuit grouping and the six water columns identified separately.
  • Lighting count and control method.
  • Water treatment: ozone, UV, filtration route.
  • Heating and insulation package.
  • Total connected load and supply requirements.
  • Delivery terms, packaging, and the installation and after-sales scope that applies to this order.

Where This Model Sits in the Wider Range

If the site needs a longer swimming lane or a separate relaxation area, compare WS-S38 against other configurations before locking the specification. A long outdoor swim spa with hydrotherapy and relaxation pool pairs an extended swimming channel with a dedicated seating zone, while a customizable shape outdoor spa covers square, round, oval and curved layouts where the garden geometry drives the decision. Specifying against the full range avoids buying a compact unit for a brief that actually needed length.

SANTERSON supplies these units as part of a wider programme of villa and hospitality products, so swim spas can be specified together with poolside loungers, pergolas, outdoor dining sets and the interior finishes of an adjoining pavilion. Coordinating them under one custom and OEM service keeps finishes consistent across indoor and outdoor zones, and freight consolidation reduces handling on site.

Pre-Quotation Checklist

  • Dimensions confirmed with steps included or excluded stated in writing.
  • Jet map received, not just a jet count.
  • Every option marked included or excluded; no blank cells.
  • Total connected load recalculated after the final option list.
  • Base, drainage and service clearance drawn before order placement.
  • Delivery terms and installation responsibility named in the same document.

A specification that reads this way takes an hour to prepare and removes most of the back-and-forth from a swim spa purchase. Send it with your enquiry and you will receive a quotation you can compare line by line — across configurations from the same supplier, or between suppliers.

Send your specification for review. SANTERSON manufactures outdoor swim spas along with outdoor furniture, bathroom ceramics, lighting and building materials for villa, resort and hospitality projects. Share your dimension sheet, option list and site drawings to receive a configuration-specific quotation.