A glass-front wardrobe looks simple on a mood board and complicated on site. Before you place an order, here are the questions that decide whether the unit arrives as designed — and what a made-to-measure supplier such as SANTERSON needs from you to answer them.

Why glass modular wardrobes need more specification than a standard wardrobe

Modular wardrobes are built from repeatable carcass units, and glass turns those units into a visible finish. Frames, handles, hinges and the joinery between modules all sit in plain sight, and glass reflects the room around them. A measurement that is a few millimetres out, or a wall that is slightly out of square, shows up immediately once the doors are on.

That is why our Glass Modular Wardrobes are supplied as made-to-measure work rather than fixed sizes: sizing, material, finish and internal layout are all specified per project. The questions below are the ones that make that specification accurate the first time.

1. What is the verified opening size, and what is inside the wall?

Send us a measured drawing rather than an architectural plan dimension. We need finished floor to finished ceiling height, the width at three points along the run, the depth available after skirting and architraves, and the position of any bulkhead, beam or recessed lighting.

  • Is the wall solid, stud or plasterboard? Fixings for a full-height glazed unit depend on it.
  • Are floor levels level across the whole run? A sloping slab changes how the base is scribed.
  • Do doors, drawers or an adjacent wardrobe need clearance to swing or slide without hitting each other?
  • Where do power points, switches and air-conditioning grilles sit relative to the carcass?

2. Which glass, and for whose benefit?

Glass is a specification decision, not just an appearance decision. Tell us who uses the room and what they need to see or not see.

Glass choiceWhat it does in useTypical setting
Clear glassOpens up the room, contents stay visibleMaster bedroom, boutique-style dressing area
Frosted or ribbed glassSoftens what is on display while keeping light throughBedrooms sharing a wall with a living space
Bronze or smoked glassTinted, reflective surface that reads as a wall panelHotels, villas with strong daylight
MirrorAdds a dressing surface and enlarges a small roomCompact bedrooms, corridors

We also need the frame. An aluminium-framed glass door behaves differently from a glass door set into a panelled carcass: different sightlines, different hardware, different tolerances on installation. If your design already shows aluminium frame glass wardrobes elsewhere in the project, tell us early so the frames and finishes are matched across rooms.

3. What goes inside, room by room?

The internal layout is what you live with day to day, and it drives the module split. Describe your storage in use rather than asking for a generic plan:

  • Long hanging for coats and dresses, or short hanging doubled up — this sets the height of each section.
  • How many drawers, and at what height you want them relative to the bed or island.
  • Shelves for folded linen, plus whether you want adjustable or fixed shelf heights.
  • Lighting inside the carcass: motion-triggered, door-switch, or a constant run with a transformer hidden in an accessible position.
  • Special items — suitcases on top, an ironing station, a safe, a jewellery tray.

Where one layout does not fit the whole project, we mix modules. A Combination Modular Wardrobe pairs hanging sections with drawer and shelf units in one run, while a Hanging Modular Wardrobe keeps the whole bay for hanging. In apartments where the bed sits close to the wardrobe, sliding doors keep the aisle usable; see Glass Sliding Door Wardrobes for that configuration.

Ask us to send the module plan with sizes marked on it, and check it against your furniture layout before production starts. Changing a drawer bank after the carcass is cut costs time; changing it on paper costs nothing.

4. Which finish carries through the rest of the project?

Glass wardrobes rarely stand alone. The carcass colour, veneer and handle profile should tie in with the cabinetry, doors and wall panelling in the same building. When you send us a wardrobe enquiry for a villa or hotel fit-out, include the finishes already fixed elsewhere — the joinery palette from our turnkey project work is coordinated this way, room by room.

5. Who measures, who delivers and who installs?

For made-to-measure glazed joinery, the handover between factory and site matters as much as the drawing. Ask your supplier directly:

  • Is a site survey or a second check of dimensions included before production?
  • How are glass panels packed, and how is damage on arrival recorded and replaced?
  • Does the price include installation, or do your local trades fit the units from our assembly drawings?
  • What happens if a panel arrives wrong — what lead time applies to a replacement?

We handle production, packing and freight, and can work with your site team on fitting. For projects outside China we arrange door-to-door delivery through our logistics service, and installation and after-sales support are set out separately so you know which stage sits with us and which sits with your builder.

6. What is included in the quotation?

Compare quotations line by line, not as a single number. A complete wardrobe quotation should separate the carcass, doors and glass, hardware, internal fittings, lighting, packing and freight, and installation. Anything left out appears later as a variation.

Checklist to send with your enquiry

Everything we need to quote accurately

  • Measured drawing of the wall or alcove, with floor levels noted
  • Number of rooms or units, and whether they repeat across floors
  • Glass type, frame colour and carcass finish for each unit
  • Internal layout per unit, with hanging heights and drawer counts
  • Lighting preference and where the transformer may be located
  • Delivery address, access route and lift or stair dimensions
  • Target on-site date, working backwards to your production schedule

Order with the questions already answered

A glass modular wardrobe is a joinery item with a transparent front, so it rewards specification and punishes assumptions. Work through the six questions above, and your enquiry moves from an idea to a buildable drawing quickly.

Send us your drawings

SANTERSON manufactures made-to-measure wardrobes, cabinetry and interior fixtures for villa, hotel and apartment projects. Email santerson@qq.com or contact us on WhatsApp +86 13928214007 (PHILLIP) with your measurements and finish palette, and we will return a module plan and quotation.