An L shaped corner wardrobe is one of the most specification-heavy items in a bedroom fit-out. It wraps two walls, meets at an angle that no flat-run unit can copy, and is almost always made to measure. That is exactly why quotations come back so far apart: one supplier prices the box you described, another prices a different box with cheaper doors, and both numbers look reasonable on a spreadsheet.

A request for quote is not a price enquiry. It is the drawing brief that every later stage — production, packing, freight and installation — will be measured against. Below is what to put in front of the factory before you ask for a number, and what to expect back.

Start with the room, not the wardrobe

Corner wardrobes are built around the two wall returns they sit in. Before any door style or finish is discussed, send the shell dimensions of that corner.

  • Both wall runs measured to the finished face of the wall, including skirting and any plaster build-up.
  • The actual corner angle. A corner that reads as 90° on an old plan is often out of square on site, and that single degree decides whether the scribe piece at the far end stays narrow or widens enough to need a cut-to-size panel.
  • Floor-to-ceiling height at several points along both runs, plus whether the ceiling is level.
  • Everything that intrudes into the run: architraves, radiators, downlights in the ceiling, air grilles, light switches, power points, skirting depth and door openings that must stay clear.
  • Which end of each run terminates into a doorway, corridor or window, because that determines where the return panel can finish.

A simple sketch with measurements marked is worth more than a polished 3D render at this stage. If your team can produce elevations, send them; if not, state that clearly and ask the supplier to survey or work from your measured sketch under a documented agreement.

State the layout you actually want inside

The corner itself is where storage is either wasted or won. Say which internal arrangement you expect, because the price follows it.

Internal decisionWhat to specify in the RFQ
Corner treatmentDiagonal return panel, open angled shelf stack, or a continuous run with a blank corner carcass. Note whether you want the corner reachable from both sides.
Hanging zonesNumber of short-hang and long-hang sections, and which leg of the L each sits on. Long hang normally goes on the longer run.
Drawers and shelvesCount of drawer stacks, shelf heights, and whether any shelf is adjustable. Pull-out trays and hampers change the price materially.
Full-height finishWhether the unit runs to the ceiling with a top box, or stops short with a pelmet or scribe.
External returnsEnd panel depth and whether the return is visible from the bedroom, which decides the edge finish.

If you are open to the supplier proposing the internal layout, say so and give them the household or guest inventory you need to store — suits, dresses, bedding, luggage, seasonal items. A L shaped walk in wardrobe and a built-in corner unit of the same footprint carry very different internal economics, so make clear which one you are pricing.

Name the door type and opening clearance

Doors are usually the second largest cost line after the carcass, and in a corner they interact with circulation. Specify them rather than leaving it to the quotation.

  • Hinged, sliding or open. A sliding door corner wardrobe saves the swing arc but needs track depth and a clear run along the front; a hinged door corner wardrobe needs enough clearance in front of the corner for the doors to open without fouling the bed or an opposite wall.
  • Door material and glass type where relevant — clear, frosted, ribbed or smoked glass, mirror, aluminium frame, lacquer, veneer, melamine or acrylic. Glass and mirror fronts carry their own handling and packing cost.
  • Handleless or handled, and if handleless, which profile or push mechanism.
  • Soft-close hardware expectation on doors and drawers, and the brand or grade if you have a preference.

Also state how many doors you expect and where the meeting stile of a sliding pair should fall relative to the corner. Two suppliers who split the same run into three doors versus four will quote differently for reasons that are invisible on a request that just says "sliding doors".

Fix the materials and finishes in writing

"Custom wardrobe, white, made to measure" is not a specification. For each surface give the substrate and the finish.

  • Carcass board type and thickness, edge banding colour, and whether the interior faces are finished or raw.
  • Door substrate and surface — lacquer, veneer, melamine, acrylic, PVC or aluminium frame with glass — plus the colour reference. Send a physical swatch number or a sample reference, not a photograph taken under bedroom lighting.
  • Back panel thickness and fixing method.
  • Any integrated lighting inside the unit, its switching, and where the transformer is allowed to sit.

Ask each bidder to list substitutions they have made. A quotation that quietly swaps a veneer for a printed laminate will come back materially cheaper, and it answers a question you did not ask.

Set the commercial terms you need quoted

A wardrobe number that excludes freight and installation is not comparable with one that includes them. Ask for the price broken into the same lines across every bidder.

Line itemWhat to ask for
Unit price basisPrice per linear metre and total project price, so bidders with different door splits can still be compared.
Tooling and samplingPrototype or sample-door cost, and whether it is credited against the order.
PackagingPacking method for glass and mirror components, carton marking per room, and the packing list format.
FreightSea, air or rail option, port of loading, delivery term (FOB, CIF or door-to-door) and whether customs paperwork such as commercial invoice, packing list and certificate of origin is included.
Lead timeProduction lead time from confirmed drawings and deposit, stated in working days.
PaymentDeposit percentage, balance trigger, and what happens if dimensions are re-measured after production starts.
After the saleWarranty scope, spare parts availability for hinges, tracks and handles, and who installs on site.

Working with a one-stop furniture and building materials supplier changes what the RFQ can reasonably cover. If the same factory is also quoting your vanity, kitchen cabinetry, doors and wall panelling for the same building, ask them to price the wardrobes inside that package and confirm one coordinated drawing set, one production schedule and one shipment rather than several independent ones.

Attach the documents that stop rework later

  • Measured drawings or a marked-up sketch of both wall runs, with the corner angle noted.
  • Photographs of the corner, floor and ceiling, taken straight-on so out-of-plumb walls are visible.
  • The internal layout you want, drawn at least roughly, plus your storage inventory.
  • Finish references: swatch codes, sample numbers or approved physical samples by post.
  • Site constraints — lift or stair access, floor protection rules, delivery window, local trade and installation arrangements.
  • The delivery term and destination address, so freight is quoted on the same basis twice.
One line that saves weeks: state which document governs if the drawings and the site measurements disagree. Suppliers will otherwise quote whichever version suits them.

Questions worth asking every bidder

How is the corner carcass built?

Ask whether the two runs join with a post, a diagonal panel or a continuous top and bottom rail. A posted corner costs less but eats usable width; a diagonal return gives a cleaner reach into the corner and adds fabrication time.

Who verifies dimensions before production?

Get this in writing. For made-to-measure joinery the re-measure step, and who owns it, decides whether an error is corrected free of charge or becomes a variation order.

Can you supply matching units for other rooms?

If bedrooms, hallway storage and the vanity are ordered together, panels and finishes match from one batch instead of being matched across separate orders at different times.

What is excluded from this price?

Ask each bidder to list exclusions explicitly: scribe pieces, plinths, lighting, transformers, on-site installation, protection of finished floors and any local certification the project requires.

Before you send it

  • Every dimension has a unit and a stated reference face.
  • The corner angle and floor/ceiling levelness are recorded, not assumed.
  • Door type, door count and opening clearance are all named.
  • Finish references are attached rather than described in words.
  • Freight term, lead time basis and re-measure responsibility appear in the request itself.

Send that package to three bidders and the numbers become comparable. Send a one-line enquiry and you will get three different wardrobes at three different prices, all of which technically answer the question you asked.