A slim-frame French door looks simple on a drawing: two glazed leaves, a narrow sightline, a clean opening between living room and garden. In an OEM order it is not simple at all. The dimensions are not standard, the finish has to match joinery elsewhere in the building, and the set has to survive shipping from the factory to the site. This article walks through how original-equipment sourcing for Santerson Modern Slim Frame French Doors actually runs, stage by stage, so a buyer or contractor knows what to prepare before the first enquiry.
What "OEM Sourcing" Means for This Door Line
In this context OEM means the factory builds the door to your documentation rather than to its own catalogue size. You supply the opening dimensions, the layout of the leaves, the glazing and the finish; the manufacturer produces to that specification under your project reference or your brand. The product page for this model describes it as part of the French Doors collection intended for residential door projects, with made-to-measure sizing plus material and finish options, and it asks buyers to confirm dimensions and selected specifications for each order.
That single sentence is the contract of the whole process. Nothing in a slim-frame order can be assumed from a photograph or from a model number on a listing. The quotation follows the specification, not the other way round.
Before You Send an Enquiry: Four Things to Have Ready
- Verified openings. Record structural opening width and height, floor finish levels, and whether the head of the opening carries a load. Take measurements from more than one point and note out-of-plumb or out-of-square walls; slim frames leave little room to disguise an uneven reveal.
- Layout intent. Number of leaves, which leaf is active, hinge side, inward or outward swing, and whether you want a mullion, transom or arched head. Related models in the same collection, such as Santerson Arched French Doors and Classic French Double Doors, are useful references when the design brief calls for a different head profile or a more traditional moulding.
- Finish schedule. Colour, grain or lacquer treatment, hardware style, and any requirement to match existing frames, skirting or cabinetry. If your project also uses Santerson Decorative Interior Doors elsewhere, send both schedules together so the factory can align tones across ranges.
- Delivery and access information. Site address, floor level, lift or stair constraints, and who receives goods. A full-height glazed leaf needs an elevator that fits it or a ground-floor drop.
The OEM Route, Stage by Stage
- Specification review. Your drawings and schedule go to the factory for feasibility checks: whether the requested leaf size is workable at the sightline you want, how the glass build-up affects weight, and where ironmongery can be fixed. Expect questions back at this point; a supplier who asks nothing has not read your drawings.
- Sample or prototype decision. For a single villa package an approved finish sample and a clear shop drawing are usually enough. For a multi-unit order, or where the profile itself is new, prototyping before full production is worth the extra cycle. The Custom & OEM service page covers bespoke design and prototyping, material and finish selection, and flexible order quantities.
- Shop drawing sign-off. This is the decisive document. It should show finished opening sizes, leaf divisions, sightlines, glass make-up, hardware positions, and the agreed finish. Sign nothing that leaves a dimension ambiguous — after this stage changes cost both time and money.
- Production and inspection. Frames are fabricated, glazed, finished and assembled to the signed drawing. Agree in advance what you inspect and when: profile dimensions, square and diagonal of each leaf, glazing condition, finish colour against the approved sample, and hardware operation.
- Packaging, freight and handover. Glazed leaves travel on crated, edge-protected racking. The supplier's logistics service covers sea, air and rail freight with customs paperwork and door-to-door delivery; you still need to confirm Incoterms, insurance and the receiving arrangement for your own site, because these are commercial terms that vary per order.
What to Specify in the Door Schedule
| Item | What to state |
|---|---|
| Finished opening size | Width and height in millimetres, with tolerance and floor finish level noted. |
| Leaf configuration | Number of leaves, active leaf, hinge hand, swing direction, and whether leaves are equal width. |
| Frame and sightline | Frame depth, frame face width, and the glazing bar or mullion profile expected in elevation. |
| Glazing | Glass type, thickness and any pattern or tint. Confirm the build-up against leaf size before ordering. |
| Finish | Colour code, sheen level, grain direction for wood-effect surfaces, and the approved physical sample reference. |
| Ironmongery | Handles, hinges, locks, closers, keeping; state whether supplied by the factory or provided on site. |
| Quantities and sequence | Total sets per type, plus the delivery sequence if openings are being handed over in phases. |
| Site constraints | Access route for crates, storage conditions before installation, and the installing trade. |
Where Buyers Most Often Get This Wrong
The recurring problems are procedural rather than technical. Measuring the structural opening instead of the finished opening is the most common, and it is expensive because frames are cut to size. Second, treating the finish as a colour name rather than an approved sample; screens render lacquer and grain very differently from the physical article. Third, leaving hardware out of the order and discovering at handover that the specified lock body does not suit the leaf stiles. Fourth, booking the installation trade before the delivery date is fixed, which turns a completed production run into weeks of on-site storage.
A practical safeguard is to order the doors together with the other joinery in the same package. Frames, panelling, wardrobes and cabinetry all carry finish schedules that must agree; buying them through one one-stop furniture and building materials supplier reduces the number of parties who can disagree about a tone. The same coordination applies when doors are only part of a wider fit-out that also covers flooring, wall finishes and lighting.
A Short Checklist for Your Next Enquiry
- Drawings and opening schedule attached, in millimetres, with floor levels marked.
- Finish samples or sample references identified for every surface.
- Hardware list stated, with the supplier named for each item.
- Prototype or sample requirement decided and priced.
- Shop drawing approval treated as a formal milestone with one responsible signatory.
- Freight terms, insurance and receiving arrangements agreed before production starts.
Send us your door schedule. Share the openings, layout and finish requirements for your project and we will review them against this slim-frame French door range and come back with a specification-led quotation.
Email santerson@qq.com or contact us on WhatsApp +86-13928214007 (PHILLIP). Enquiry form: https://www.santerson.com/contact/