On a villa or apartment project that already runs to dozens of line items — cabinetry, flooring, wall finishes, lighting, loose furniture — the media wall is rarely treated as its own package. It gets lumped into "joinery", quoted late, and then re-engineered when the wall turns out to be plasterboard rather than masonry. A floating TV unit is deceptively simple to describe and easy to under-specify: it has no legs touching the floor, so everything about it — support, service routing, finish breaks, door clearances — depends on decisions made before anyone prices it. This guide sets out how to scope and budget floating TV units as a separate package inside a multi-product order, so the number you approve is the number you pay.
Why floating TV units break the usual joinery allowance
A floor-standing cabinet carries its own weight. A wall-hung unit transfers every load — carcass, doors, hardware, a television, books, the occasional decanter of whisky — into the substrate behind the finish lining, and it does so through a bracket system that has to be fixed before the wall is closed up. That single fact moves three costs out of the "furniture" column and into the "wall build-up" column, where they are often not budgeted at all.
The second complication is coordination. In a single-product purchase you choose a cabinet and move on. In a multi-product project the same wall carries the media unit, the decorative wall panel or cladding around it, the skirting that has to be cut around the shadow gap, the flooring that runs below it, the lighting circuit for any integrated LED strip, and sometimes an aluminium ceiling detail above. Each supplier prices only their own scope by default. The gaps between scopes are where budget overruns appear.
Build the package in four cost layers
Split the media wall into layers before you ask for a price. Quoting one line item invites change orders; quoting four keeps the total honest and makes substitutions visible.
| Layer | What it covers | Where budgets usually miss it |
|---|---|---|
| 1. Carcass and layout | Cabinet depth, number of drawers and open bays, door type, made-to-measure dimensions | Depth chosen for looks rather than for the equipment that has to fit behind the TV |
| 2. Support and substrate | Concealed bracket, solid timber or steel backing frame, wall build-up needed to carry the load | Priced as furniture when it is actually a wall trade; plasterboard alone will not take a wall-hung unit |
| 3. Services and openings | TV recess or panel aperture, cable routes, sockets, ventilation to equipment, low-voltage pulls | Electrical set-out fixed before the unit layout is final, then relocated on site at daywork rates |
| 4. Surround and finishes | Feature wall panels, veneer or lacquer match to cabinetry elsewhere, shadow gaps, edge trims | Ordered as a separate wall product with no finish-matching instruction between the two orders |
Set the scope document before you request pricing
For any custom or made-to-measure item, price follows definition. Because our media and TV products are manufactured to project dimensions rather than in fixed sizes — finish, layout and dimensions are specified per space — a scope that says "one floating unit, 2400 mm wide" is not enough for an accurate quotation.
Send the following with your enquiry and you will get comparable numbers back:
- A dimensioned elevation of the wall, including ceiling height, floor finish level, and the position of doors and openings on either side.
- The substrate behind the lining (masonry, stud wall, timber frame), because this determines whether a backing frame is needed and who supplies it.
- The equipment list: screen size, soundbar, console, receiver — and whether that equipment sits inside the unit or in a separate cabinet.
- Storage intent by room usage: drawer-heavy for toys and media, open bays for display, closed full-height storage where the wall is tall enough. Our full height media walls solve rooms where floor-to-ceiling storage matters more than a low unit, and they carry their own structural and anti-tip considerations.
- The finish reference you want matched — veneer species, lacquer sheen, melamine or acrylic panel — cross-referenced to the cabinetry already on the order.
A practical rule: if two suppliers are quoting the same wall and their numbers differ by more than a small margin, the difference is almost never in the cabinet. It is in layer 2 or layer 3 — support and services — which one of them included and the other did not.
Where multi-product consolidation actually saves money
On a project that also orders wardrobes, kitchen cabinets and wall panelling from the same manufacturer, three savings are available and none of them come from unit-price discounts.
One finish schedule instead of several. Veneer, lacquer and melamine batches vary. Ordering the media unit alongside custom built-in kitchen cabinets and the bedroom wardrobes lets one batch cover all three, so the grain and sheen match across open-plan spaces. Sourcing the media wall separately is the usual cause of "the cabinet looks different from the wardrobe" complaints.
One shipping event. Long carcass sections, brackets and doors travel awkwardly. Consolidating them into a shared container with the rest of the fit-out reduces handling damage and the risk that one package arrives weeks after the others and stalls installation.
One coordination owner. A single supplier producing the media unit, the wall panels around it and the joinery beside it will reconcile the openings once. Split across three suppliers, the same junction is interpreted three times.
Cost drivers to price explicitly
- Span without legs. Long unsupported runs need deeper carcasses or intermediate support. A wider unit is not simply a wider price — it can change the structure.
- Door and drawer selection. Handleless fronts, glass-front bays and integrated lighting each carry their own hardware and electrical cost; see integrated LED media units, where the lighting detail has to be specified with the carcass, not added afterwards.
- Ventilation. Equipment inside a closed box heats up. Aperture positions and ventilation paths must be drawn, not improvised on site.
- Shadow gaps and trims. A floating look depends on a clean reveal at the wall. That reveal has to be agreed with whoever is building and finishing the wall.
- Site sequence. The backing frame goes in before the wall closes; the unit hangs after decoration. Any change to the layout after the first date is expensive twice over.
A simple budget check before you approve
- Confirm the substrate and who supplies the backing frame — in writing, with a name against it.
- Confirm the electrical and low-voltage set-out against the final elevation, not an early concept drawing.
- Confirm that the finish reference on the media unit matches the batch covering cabinetry and panelling.
- Confirm what is excluded: brackets, trims, installation labour, and any feature wall outside the unit footprint.
- Hold a small contingency for the surround rather than the cabinet — the cabinet is now well defined; the wall around it usually is not.
Floating TV units are one of the smallest packages on a project and one of the most visible in daily use. Scope them as their own line, with support and services named, and they stop being the item that arrives last and costs most in changes.
Send us the wall elevation, the equipment list and the finish you want matched, and we will quote the media package against the same production batch as your cabinetry and wall panels — made to measure for the project.