An above-counter vessel basin sits on top of the vanity, so almost every dimension around it has to be agreed before production starts. That is exactly why a Santerson Vessel Basin (Above Counter) is quoted rather than priced off a fixed list: finish, layout and dimensions are specified for each project. The quality of your first enquiry usually decides whether you get a usable quotation in one round or three.

What makes this basin different from a stock item

The vessel basin in our Countertops & Basins range is a configurable sanitary fixture for residential bathroom projects. It is supplied as part of a fit-out, not as a boxed item picked off a shelf. Because the bowl rests above the counter, the countertop cut-out, the tap position, the waste route and the splash zone behind the basin are all interdependent. Change one late and the others have to be redrawn.

We also supply close relatives of this fixture in the same collection — an undermount basin, a double basin countertop, and stone & marble surfaces — so a single enquiry can cover the basin, the top it sits on and the vanity it stands on. If you are specifying several bathrooms, bundling those lines into one request normally shortens the specification loop.

Before you send the enquiry: decide these six points

  • Which room and which layout. Guest powder room, family bathroom or principal ensuite. Tell us whether the basin sits on a single vanity, a long shared top or a double vanity, since the number of basins changes the cut-out pattern and the plumbing ganged behind it.
  • Rough opening dimensions. Length and depth of the top you are working with, plus the finished counter height you want. Made-to-measure sizing is part of the specification, so approximate numbers in writing beat a guess on site later.
  • Finish direction. Send a reference — a sample code, a photograph, or the finish used elsewhere in the project. Matching basin and countertop tones across rooms is far easier when the reference arrives with the first message.
  • Tapware and waste preference. Deck-mounted or wall-mounted tap, pop-up or open waste, and whether you want the trap visible or boxed in. This drives the cut-out count and the joinery below.
  • Quantity and phasing. One bathroom for a renovation is handled differently from repeated identical ensuites across several floors. If units repeat, say so — repeat production is where custom specification starts paying for itself.
  • Delivery destination and access. City, port or site address, plus any lift, stair or narrow-access constraint. It affects packaging and the freight option we quote.

What to include so we can price it in one pass

Minimum information for a firm quotation

Project typeVilla, apartment or hospitality; new build or renovation
Fixtures requiredVessel basin plus countertop, vanity, mirror cabinet or shower items if they are in the same package
DimensionsTop length/depth, finished counter height, position of soil and water outlets where known
Finish referencesSample codes, photos or physical samples already in your pack
QuantitiesPer room type, and the number of rooms of each type
DestinationDelivery address, preferred port or door-to-door, and site access notes
DrawingsFloor plan, elevation or even a marked-up sketch — any of these speeds up the first response

If you do not have drawings yet, send photographs of the room and the measurements you can take. Our team works from that to propose a layout, and we produce concept layouts, furniture plans and 3D renderings under our interior design services before anything goes into production.

How the quotation moves into production

Enquiries follow the same sequence we use on villa and hospitality projects: a brief and design proposal, then a quotation with detail confirmation, then production, shipment and follow-up. Under our custom & OEM service, material and finish choices — wood, metals, engineered stone, laminates — are confirmed at the detail stage, with prototyping where a new configuration is being developed. Once the specification is signed off, the basin and its matching top enter manufacturing together, so tones and edges are produced in the same batch.

Freight is arranged after production scheduling. We handle sea, air and rail forwarding, export paperwork, packaging and container loading, and door-to-door delivery to the site or port you nominate. Your quotation states what is included for your destination; import duties, local taxes and on-site connection works are handled locally and are not part of our supply.

Dimensions, material build-up, countertop fit, waste and tap clearances, and any electrical items paired with the vanity are confirmed for each configuration before production. We do not publish fixed technical figures for this basin; the numbers on your approved drawing are the ones we manufacture to.

Questions buyers ask us most often

Can the basin be supplied with the countertop already cut? Yes — the basin and the top in the Countertops & Basins range are specified together, which is how we keep the cut-out, the overflow route and the tap holes aligned.

Can it match joinery supplied on the same project? That is a normal case for us. As a furniture and building materials manufacturer, we regularly supply cabinetry, vanities, basins, lighting and wall finishes for one project under a single package, which keeps finishes consistent across rooms.

What if the site dimensions change after the quotation? Send the revised measurement before production opens. Made-to-measure work can absorb changes at the confirmation stage; it cannot absorb them after cutting starts, and that is why we hold a detail-confirmation step before manufacturing.

Is installation included? Installation support, inspection and snag resolution are listed among our project services, with after-sales support for spare parts and replacement. The scope agreed for your destination governs what is carried out on site.

Sending the enquiry

Send your room photos, measurements, finish references and quantities to PHILLIP on WhatsApp +86-13928214007 or by email to santerson@qq.com. We reply with a proposed configuration and a quotation covering the basin, its countertop and any paired joinery in one document, so you can compare it against your project budget rather than piecing together several supplier prices.

Start your specification

Open the Santerson Vessel Basin (Above Counter) product page, note the configuration you want, and send it with your drawings to our contact page. The contact page states that enquiries receive a response within 24 hours during business hours (Monday–Saturday, 8:00 AM–6:00 PM GMT+8).