A slim frame French door looks simple from a distance: narrow sightlines, full-height glass, a pair of leaves that open onto a terrace or garden. That simplicity is exactly why specification errors go unnoticed until the joinery arrives on site. Before an order is placed, we normally need the opening dimensions and squareness, the floor finish level, the wall build-up, the hardware duty expected, the glazing brief and the delivery route. Santerson Modern Slim Frame French Doors are made to measure for each project, so those details decide what we manufacture and how the leaves hang, lock and seal. This article sets out the information a specifier or buyer should have ready before an enquiry goes out.
1. The opening itself: size, squareness and floor level
Tolerance work starts with the opening, not the door. For a made-to-measure pair we need width and height at several points across the aperture, plus the diagonal difference, because an out-of-square opening forces either a scribed frame or an uneven reveal on one leaf. Record the finished floor level as well: a threshold detail drawn before the screed and tile build-up is known usually ends with leaves that either drag or leave a visible gap.
Send us the opening as a marked-up drawing rather than a single number, and state whether the figures are structural or finished dimensions. Where an existing opening is being replaced, note the lintel condition and whether the reveal is plaster, blockwork or steel, since that determines how the frame is fixed and packed.
2. Wall thickness, lining depth and the reveal
Slim frames read well only when the reveal is resolved. The wall build-up tells us the lining depth, whether a casing or architrave is required, and whether the frame should be set flush with one face or centred. In renovation work the existing plaster thickness often varies along the opening, so we ask for the range rather than an average.
3. Leaf layout, opening direction and how the doors will be used
State which leaf is active, which hand the hinges sit on, and whether the doors open inward or outward. For a pair that opens onto a balcony, an outward swing keeps interior floor space clear but exposes the hardware to weather; an inward swing protects the hardware yet takes room when both leaves are opened. Where a door divides two internal spaces, tell us how often both leaves will actually be opened, because that decides whether a mullion or astragal detail is needed and where the lock keep goes.
4. Glazing brief: vision, sound and solar control
Glazing is specified by performance requirement, not by habit. For doors beside a busy street or a mechanical plant, acoustic laminated glass is the item to raise early. For doors facing strong sun, the question is shading and heat gain, which affects coating choice and sometimes leaf size. Where privacy matters, such as a study opening onto a shared courtyard, reeded, obscured or patterned glass can keep the slim sightline while screening the view. Confirm what the glazing has to achieve and we build the make-up around it.
5. Hardware, threshold and cycle load
Slim frames place more demand on hinges and locks because there is less material to carry them. Tell us the expected use: a door used several times a day in a family villa behaves differently from one opened occasionally for cleaning or entertaining. Handle style, lock type, keying arrangement and whether a flush bolt or a surface-mounted astragal is preferred all belong in the enquiry. For terrace doors, the threshold detail should be agreed with the drainage design so water runs away from the seal rather than against it.
6. Finish and how the doors sit with adjoining joinery
Where French doors are specified alongside cabinetry, panelling or wardrobes in the same room, colour and sheen need to be matched across trades. Send the finish reference together with the adjacent joinery specification so we confirm the surface treatment against a sample rather than a screen value. Where custom furniture design and prototyping is already in place on the project, door finishes can be coordinated with the same material schedule.
What to send with your enquiry
| Detail | Why it matters |
|---|---|
| Opening width and height at multiple points, plus diagonals | Determines frame size and how out-of-square is resolved |
| Finished floor level and threshold build-up | Sets leaf bottom clearance and drainage detail |
| Wall thickness and reveal material | Sets lining depth, fixing method and casing choice |
| Handing, swing direction, active leaf | Determines hinge and lock preparation |
| Glazing performance target | Drives glass make-up, coating and leaf proportions |
| Hardware preference and expected use | Sets hinge grade, lock type and astragal detail |
| Finish reference and adjoining joinery schedule | Keeps colour and sheen consistent across the room |
| Delivery address, access and floor level | Affects packaging, offloading and installation sequence |
Where these doors fit in a wider package
On villa and hospitality projects we rarely supply doors alone. A typical enquiry covers the openings together with cabinetry, wall panelling and other joinery, which is easier to coordinate under one production schedule than across several suppliers. If the doors form part of that scope, group them with the rest of the windows and doors package and the interior fixtures when we prepare the quotation, so fixing details and finishes are resolved once.
Made-to-measure sizing, material and finish options are specified per project. Dimensions and selected specifications should be confirmed for each order before production starts.
A short pre-order checklist
- Opening dimensions taken at several points, with diagonals and a marked-up drawing
- Finished floor levels confirmed against the threshold and drainage detail
- Wall build-up and reveal material recorded, including variation along the opening
- Handing, swing direction and active leaf agreed on the drawing
- Glazing performance target written down, not assumed
- Hardware schedule with handle style, lock type and keying
- Finish reference matched to adjoining joinery by sample
- Delivery access, floor level and offloading arrangements confirmed
- Installation sequence agreed with the site programme and trades involved
Send your drawings, opening dimensions and finish references through our contact page, and we will confirm the make-up, fixing detail and quotation for each opening.