A glass sliding door wardrobe looks finished the day the installer leaves. The real test comes one or two years later, when a door starts to drag, a track collects grit, or a panel arrives chipped after sea freight. This article lists the after-sales questions buyers should put in writing before ordering glass sliding door wardrobes for a villa, apartment or hospitality project.
Why the after-sales conversation comes before the order
Sliding wardrobes are made-to-measure built-in furniture. Panels are cut to the opening, the track is set to the slab level, and the door leaves are adjusted to each other. Nothing on the assembly line can be trimmed at the site, so a mistake or a worn part does not end with one replacement item — it ends with an access problem in a bedroom or guest room.
SANTERSON manufactures these wardrobes as part of its Sliding Door Wardrobes collection, alongside mirror sliding door wardrobes and wooden sliding door wardrobes. Each unit is specified by project: dimensions, glass type, frame finish and internal layout are confirmed per order. That custom scope is exactly why the support terms need to be agreed while the drawings are still open, not after the container has been loaded.
The questions worth putting in writing
| Area to clarify | What to ask | Why it matters for sliding glass fronts |
|---|---|---|
| Warranty scope | Which parts are covered — frame, glass, rollers, tracks, handles, surface finish — and for how long. What voids the cover. | Glass panels rarely fail; hardware and adjustment do. A warranty that covers only the board ignores the actual failure points. |
| Spare parts | Are replacement rollers, bottom guides, bumpers, handles and track sections held for a defined period after delivery, and how are they shipped? | A discontinued roller profile can make an old wardrobe unrepairable. Ask whether the hardware is a standard profile or project-specific. |
| Damage on arrival | What photo evidence is required, in what time window, and does the supplier re-ship or credit? | Glass and mirrored fronts are the most freight-sensitive item in a fit-out. Claim rules must be known before the crate is opened. |
| Installation support | Who sets the track and levels the doors — factory-supervised, local trades, or buyer-managed? What tolerance is expected of the floor and ceiling? | A door that drags after a year usually means the slab or the track moved, not that the panel warped. |
| Snag list at handover | Is there a documented inspection step covering door alignment, smooth running action, lock function and edge banding? | A signed snag list is the cleanest starting point for any later claim. |
| Response route | Named contact, channel, and what happens after business hours on a live site. | Project delays come from unanswered emails far more often than from defective parts. |
| Maintenance guidance | Recommended cleaning agents for the glass and frame, and how often the track should be cleared. | Aggressive cleaners attack seals and finishes; grit in the bottom track is a common cause of hard-running doors. |
Read the specification sheet as part of the warranty
The after-sales terms are only as good as the document they refer to. Before production starts, ask for a signed specification that records the opening width and height, floor-to-ceiling clearance, glass type and thickness, frame colour and finish, door overlap, and the internal configuration — hanging rail, shelves, drawers and integrated lighting provisions. Where a wardrobe sits in a run of wall panelling, that interface detail belongs on the same sheet.
If a panel needs remaking two years later, that sheet is what makes the remake match. Verbal agreements about "the same grey" or "the same handle" do not survive a change of staff on either side.
How a one-stop supplier changes the picture
Wardrobes rarely arrive alone. A villa or hotel fit-out typically bundles joinery, doors, wall panels, lighting and bathroom fixtures from several vendors, and each vendor points at another when something does not line up on site. Working with a single one-stop furniture and building materials supplier reduces that risk to one accountable scope: the same drawings, the same shipment plan, and one after-sales contact for the whole joinery package.
SANTERSON's stated service chain covers design consultation and space planning, custom and OEM production, freight with customs documentation and door-to-door delivery, then installation support, inspection, warranty cover, spare parts and maintenance. The company has operated since 2008 and works on villa, hospitality and office projects including references in Sydney, Melbourne, Perth, Willoughby and North Turramurra.
A short pre-order checklist
- Get the warranty scope in writing, itemised by component, with exclusions stated.
- Ask how long spare hardware stays available and whether the profile is standard.
- Agree the damage-claim window and photo requirements before shipping.
- Confirm who installs and adjusts the doors, and what site preparation you must hand over.
- Request a signed specification sheet with dimensions, glass, finish and internal layout.
- Ask for maintenance instructions for glass, frame and track in writing.
- Name one after-sales contact per project and keep all snag correspondence in one thread.
Before you order
Send the supplier your room elevation, the opening dimensions with floor level noted, and the intended internal layout. Ask them to return a shop drawing with hardware callouts and to quote the spare-parts kit alongside the wardrobe itself. A buyer who requests those two documents usually gets a clearer answer about after-sales support than any warranty paragraph can give.
SANTERSON supplies made-to-measure wardrobes, cabinetry, doors and interior fixtures for residential and hospitality projects worldwide. Share your drawings with the project team to confirm dimensions, finishes and the support terms that apply to your order.
Talk through your wardrobe package before production starts.
Send elevations and opening sizes for a shop drawing, quotation and written after-sales terms — contact SANTERSON.