In a villa, hotel or apartment fit-out, the doors are one of the last things a client notices and one of the first things that can go wrong on site. A classic panel hinged door looks right in the sample room and then clashes with the skirting, the wardrobe front or the wall panel once it is installed. The coordination work is not difficult, but it has to happen at specification stage rather than at handover.

This guide covers how we match our classic panel hinged doors with the other products in a fit-out — joinery, wall and ceiling finishes, flooring, ironmongery and lighting — and what a buyer or contractor should fix before an order is released.

Why panel doors need coordinating, not just selecting

A panelled door carries mouldings, stiles and rails with real depth. That depth has to agree with everything it touches: the architrave on the wall, the reveal at the ceiling line, the thickness of the flooring build-up at the threshold, and the profile of any adjacent panelling. A flat slab door can sit slightly proud of a wall and still read as intentional; a classic panel door cannot.

Because our doors are made to measure — dimensions, layout, material and finish are specified per project — there is no fixed catalogue size or fixed moulding profile to design around. That flexibility is the advantage, but it means every opening has to be confirmed against the surrounding product set before production starts.

Start with the door leaf, then work outward

1. Panel style and moulding profile

Decide first how deep and how sharp the panel mouldings should be. A two-panel door with a soft, low-relief moulding sits comfortably beside modern European cabinetry. A four-panel door with a pronounced raised profile needs matching cornice, architrave and skirting, or it will look like a salvaged element dropped into a new build. If the interior also uses paneled wardrobes, order the door and the wardrobe from the same production package so the moulding cutter and the finish batch are identical.

2. Frame, architrave and skirting

The frame and architrave are where most coordination failures appear. Confirm the wall build-up — plasterboard thickness, any acoustic infill, tiled or panelled finishes — before the frame is made, then set the architrave profile against the skirting in the same room. Where a wall carries integrated door and panelling, the panel line has to run into the door frame without a visible step, which means the panelling and the door are specified together.

3. Floor levels and undercuts

Hinged doors need a clear swing and a sensible undercut. Fix the finished floor level for each room before the leaves are made, including the thickness of engineered wood flooring, any underlay, and the threshold detail between rooms. A door specified against a structural slab rather than a finished floor level will either need trimming on site or leave an unsightly gap.

4. Ironmongery and lock preparation

Levers, hinges, closers and lock bodies determine the mortising in the leaf and the strike in the frame. Send us the ironmongery schedule — or let us specify it — before production, so the leaf is machined for the correct backset, hinge count and closing hardware. Late changes to ironmongery mean re-machining leaves.

5. Finish and colour consistency

Doors, wardrobes and kitchen cabinets in the same sightline should come from one finish batch. We work with lacquered, veneered, melamine and painted surfaces across our built-in furniture ranges, so a door can be matched to a classic paneled solid wood wardrobe or a painted cabinet front. Specify the finish by sample, not by a colour name, and keep the samples signed off with the purchase order.

Where classic panel doors sit best in a project

Project typeWhat to coordinate firstProducts typically ordered together
Villa and apartment fit-outFinished floor levels, architrave profile, skirting continuityPanel hinged doors, paneled wardrobes, sideboards, niche panelling
Boutique hotel and serviced apartmentsRoom-by-room schedules, ironmongery sets, maintenance accessHinged doors, vanities and ceramic ware, wall sconces, carpets and rugs
Office and hospitality public areasAcoustic detailing, concealed and flush openings, ceiling linesFlush hinged doors, glass partitions, decorative screens, aluminium ceilings

The same coordination logic applies whether the opening takes a panelled leaf or a plain one. For corridors where a clean wall plane matters more than mouldings, flush hinged doors keep the surface uninterrupted; for terraces and suites that open onto a loggia, classic French double doors carry the same panel language through to the glazed elevation.

One supplier, one schedule, fewer clashes

When doors, joinery and finishes come from separate suppliers, coordination becomes a negotiation between drawings that were never drawn for each other. As a one-stop furniture and building materials supplier, we produce the doors together with the cabinetry, panelling, wall and ceiling finishes, ceramics and flooring they have to meet, so the profiles, levels and finishes are settled in one factory rather than argued about on site.

For buyers this means a single opening schedule, one set of production drawings to approve, and one point of contact through logistics and door-to-door delivery and installation and after-sales support. Our project workflow runs through consultation, design and planning, production, logistics, installation and after-sales, with custom and OEM work available where a project needs bespoke dimensions, materials or branding.

A practical check before you order: issue an opening schedule that lists, for every door, the clear opening size, finished floor level, wall build-up and frame detail; the architrave and skirting profiles it must match; the ironmongery set with backset and hinge count; and the finish sample reference. Anything missing from that list becomes a site variation.

Common coordination problems and how to avoid them

  • Architrave mismatch. The door architrave is deeper or shallower than the skirting. Fix both profiles from one sample board before ordering.
  • Floor level drift. Door undercut set against a bare slab. Record finished floor levels per room on the opening schedule.
  • Finish variation. Door and wardrobe ordered in similar but not identical finishes. Match by signed physical sample and same production batch.
  • Late ironmongery changes. Hardware selected after production. Lock the ironmongery schedule with the purchase order.
  • Panelling that stops at the frame. Wall panels and door frames detailed separately. Detail them as one assembly when the design uses integrated door and panelling.

Getting an opening schedule priced

Send us the room-by-room door schedule, the interior finishes schedule and any relevant elevations, and we will price the doors with the joinery and finishes they coordinate with, flagging clashes before production rather than after. For a project enquiry, include target installation dates and the delivery location so freight can be planned alongside production.

All doors are made to measure for each project; dimensions, materials, finishes and hardware are confirmed with our team before manufacture. Specifications shown on product pages are indicative and should be verified for your specific order.