A quote for a freestanding ceramic pedestal basin can look complete on the surface and still leave out the details that decide whether the basin arrives ready to install. Model 1004S is a useful example, because almost every line item in its quotation — glaze, footprint, fixing method, tap hole, series matching — is something a buyer can verify before releasing payment.
If you are sourcing sanitary ware for a villa, a hotel floor or a batch of residential bathrooms, the practical question is never only "how much per piece". It is whether the quoted specification matches what your plumbing contractor, tiler and site manager need. The checklist below follows the order most procurement teams actually work in: product definition first, then installation compatibility, then packaging and supply terms.
1. Product Definition: Model Number, Shape and Finish
The first line of any quote should name the exact model. For this item that means 1004S, not "square stand basin" or "1004 series". Series names cover several different products: within the 1004 range there is a wall-hung basin, a one-piece toilet and a wall-mounted bidet, each with its own model code. A quote written at series level invites the wrong item.
- The model code as it appears on the product page, plus a photograph of the actual article rather than a generic catalogue render.
- Colour and glaze type. The standard 1004S is a glossy ceramic finish; state explicitly whether the quote covers that finish only or a variant.
- Overall dimensions — for 1004S the quoted footprint is 400 mm wide, 400 mm deep and 850 mm high. Confirm these numbers appear in writing, because they drive tile setting-out and clearances in small bathrooms.
- Whether the price covers the pedestal, the basin alone, or both as one set. Freestanding stand basins are frequently quoted as a two-part assembly.
2. Material and Glaze: What "Premium Ceramic" Should Actually Say
Marketing wording such as "high quality ceramic" carries no obligation. A usable quote describes the body and the glaze in terms you can inspect on a sample.
- Vitreous ceramic body. The 1004S is made from vitreous ceramic, a dense fired body suited to constant wet use. Ask whether the quoted article is the same body as the pre-production sample you approved.
- Glaze coverage. A dense glossy glaze is what resists staining, limescale marking and yellowing over years of cleaning. The quote should state that all visible surfaces, including the underside of the rim and the back panel, are glazed — unglazed backs absorb moisture against wall finishes.
- Cleaning compatibility. If your project specifies particular detergents for housekeeping or facilities staff, ask the supplier to confirm the glaze tolerates them. Get that confirmation in the same email thread as the price.
Request one physical sample before confirming a bulk order. Handling a single basin tells you more about weight, glaze evenness and the quality of the underside finishing than any specification sheet.
3. Installation Method: How the Basin Is Fixed to the Wall
A freestanding pedestal basin looks self-supporting, but it is not. The 1004S is secured to the wall through a back panel, which improves installation stability and stops the unit shifting or tipping forward during use. Your quote should therefore confirm three things:
- The fixing detail — that a back panel to the wall is included in the supply, not something the site fabricates on the day.
- The type of fixings supplied, and whether they are suitable for your wall construction. A tiled masonry wall, a stud partition with reinforcement and a timber frame each need different anchors and blocking.
- Whether fixing hardware is priced in the unit rate or shown as a separate line. Hardware quoted separately at a later stage is a common source of variation orders.
Send the fixing detail to your plumbing contractor before you accept the price. If they need timber blocking behind a partition, that work has to be built into the wall before tiling — and it is far cheaper than cutting tiles back later.
4. Plumbing Rough-In: Trap Position, Waste and Tap Hole
This is where quotes most often pass review and sites still stop. The quotation should answer the rough-in questions your plumber will ask:
| Item to confirm in writing | Why it matters on site |
|---|---|
| Waste outlet type and whether the trap connection is floor-out or wall-out | Determines where the waste pipe is run before the screed goes down; changing it afterwards means lifting floor finishes |
| Tap provision — 1004S reserves a tap hole for a single-faucet installation | If your design calls for a different faucet arrangement, the quoted article may not match and cannot be altered after firing |
| Whether the waste fitting, pop-up or trap is included | Frequently excluded from ceramic unit rates and then bought locally at a premium |
| Overflow provision on the basin body | Affects the waste set you specify and the pipe routing behind the pedestal |
| Cut-back allowances for pipes concealed by the pedestal | The pedestal skirts the pipework; the quote should reflect the full assembly height, not just the basin |
Where a detail is not stated, do not assume it matches local practice. Ask for the technical data sheet and have your contractor mark their proposed pipe positions on it, then return that marked sheet to the supplier as part of your order confirmation.
5. Series Matching: Ordering a Coordinated Bathroom Set
For hotel guest rooms and villa bathrooms, matching ceramics across a floor or an entire building is a procurement decision, not a design extra. The 1004S belongs to the 1004 sanitary ware series and can be paired with the 1004A one-piece toilet or the 1004B wall-hung basin where a project mixes freestanding and wall-mounted layouts. If your design intent is a coordinated set, the quote should list every component by model code in one document.
- Order all items in a series from one production batch wherever possible, so glaze tone is consistent across rooms.
- Ask for the spare-parts and replacement position for each model. Hotels re-order individual basins years after handover, and a discontinued code creates a visible mismatch.
- Where a design mixes series — for example a stand basin in guest bathrooms and a wall-hung basin in a lobby cloakroom — have both quoted together so you can compare finishes side by side.
6. Packaging, Crating and Freight Terms
Ceramics are the shipment that gets inspected first and complained about most. The quotation should describe how each basin is protected, not simply state "export packing".
- Individual cushioned packing for basin and pedestal, with corner protection, plus a rigid outer carton or wooden crate for containerised freight.
- Marking on each carton: model code, quantity per carton, gross and net weight, and handling orientation symbols.
- Palletisation plan and the number of pieces per carton and per pallet — these figures determine how many cartons your site team handles and where damage is likely.
- The Incoterms basis, whether that is FOB, CIF or door-to-door delivery, and who insures the goods in transit. Confirm which party files a claim if breakage is found on arrival.
- A stated breakage allowance and how replacements are handled — before the container is opened, not after.
7. Quantities, Batch Consistency and Lead Time
Check that the quantity in the quote matches your bill of quantities room by room, not just as a total. Then confirm how the order will be produced and shipped:
- Whether the full quantity ships in one consignment or split deliveries, and whether glaze tone is guaranteed consistent across separate production runs.
- The production lead time from confirmed payment to goods ready, stated in working days, and the shipping window that follows.
- Whether you may place a repeat order against the same model code later, and for how long that code stays available.
- Ordering buffer. Site breakages and measurement errors happen; most project teams hold a small contingency of spare basins rather than chasing a single replacement unit.
8. Price Structure: What Should Be Broken Out Separately
A single all-inclusive figure is convenient and usually unhelpful. Ask for the price split into:
- Unit rate per basin set, with any quantity band that changes the rate.
- Packaging and crating charges, if not already in the unit rate.
- Inland transport to port, freight, insurance and destination charges, each named.
- Fixing hardware, waste fittings and any optional accessories.
- Payment terms, including deposit percentage and the milestone that triggers balance payment.
A broken-out quote also makes future comparison easier. When you re-tender the same specification to another supplier, itemised lines compare cleanly; a lump sum does not.
9. After-Sales and Documentation
Close the quotation by checking what arrives with the goods and what happens if something is wrong:
- Installation instructions for the back-panel fixing, in English, supplied with the shipment or as a downloadable sheet.
- A named contact who handles quality queries, with the response time stated.
- The procedure and evidence required for a claim — typically dated photographs of packing and damaged items taken at the moment of unloading.
- Care and maintenance guidance for the glaze, which housekeeping teams and facilities managers will ask for at handover.
Working with a One-Stop Supplier
Bathroom fit-outs rarely stop at ceramics. The same project usually needs vanities, shower systems, lighting, wall and ceiling finishes, flooring and cabinetry, and each of those has its own quotation to reconcile. Coordinating them through a one-stop furniture and building materials supplier reduces the number of separate documents, freight bookings and defect contacts your team manages, and it makes glaze tones, hardware finishes and colour palettes easier to keep consistent across a whole floor.
SANTERSON is a China-based furniture and building materials manufacturer supplying project customers in hospitality, villas and offices, with services covering design support, custom and OEM production, door-to-door logistics, installation and after-sales support. When your enquiry bundles sanitary ware with the other bathroom and interior elements, ask for one consolidated quotation organised by room or floor — it is much easier to check against a bill of quantities than twelve separate offers.
Before you confirm an order
Send us the model code, quantity per room, your wall construction and your plumbing rough-in drawing, and we will return a quotation that states dimensions, fixing method, tap provision, packing plan and freight terms line by line — so nothing has to be guessed on site.