Wardrobe Specification · Project Approval Checklist
A wardrobe that mixes glass fronts with acrylic panels looks resolved on a mood board and unresolved on site until someone has written down which glass, which acrylic, which frame and which opening. This guide sets out the decisions project teams should close out before an approval signature goes on Glass & Acrylic Combination Wardrobes.
Why mixed-material wardrobes need a different sign-off list
A single-material wardrobe is approved as one line item: board, edge, colour. A combination wardrobe is really three trades agreeing with each other — the glass supplier, the panel supplier and the frame that carries both. Glass sets by reflection, acrylic sets by saturation, and aluminium sets by line. Each behaves differently under the same light, and each has a different tolerance for being cut, drilled and adjusted on site.
That is where approvals go wrong. A team approves a render, production reads the render as intent rather than specification, and the first physical unit arrives with a glass tone nobody chose and an acrylic sheen nobody measured. Every item below exists to move one decision from "understood by both sides" to "written down by one side and confirmed by the other".
1. Confirm what each material is actually doing in the design
Before any technical question, settle the design intent for each surface. The same elevation can be built two ways and look nothing alike.
- Glass as display, acrylic as concealment. Glass fronts reveal what is inside, so the interior carcass finish, shelving layout and any internal lighting become part of the approved appearance. Acrylic fronts hide it. Decide per bay, not per wardrobe.
- Glass as a line, acrylic as a field. Narrow glass strips between wide acrylic panels read as shadow gaps; wide glass with narrow acrylic accents reads as a display cabinet. Swap the widths and the piece changes character.
- Where reflection is wanted and where it is a problem. A glass panel opposite a window or a corridor light throws glare into the room. That decision belongs to the interior scheme, not to the wardrobe shop drawings.
Write this intent into the approval pack as a bay-by-bay schedule: which bay is glass, which is acrylic, and what each one is meant to show or hide. If your wider storage scheme also includes Glass Walk in Wardrobes, use the same schedule format across both so the reviewer is comparing like with like.
2. Confirm the glass: type, tone and treatment
"Glass front" is not a specification. Four separate choices sit behind it, and each one is visible from two metres away.
| Decision | What to write down | Why it fails later |
|---|---|---|
| Tint / tone | Clear, bronze, smoked or frosted — named, with a physical sample reference | "Grey glass" means different products to different suppliers; the delivered tone clashes with joinery |
| Surface treatment | Polished, ribbed or reeded, satin-etched; which face is treated | Patterned glass installed with the pattern facing inward disappears behind the carcass |
| Safety build | Toughened or laminated, minimum thickness, edge work (polished, chamfered, seamed) | Untoughened cut-offs cannot be re-cut after tempering; a wrong size becomes scrap |
| Fitting method | Beaded rebate, structural fixing, gasket setting; whether glass is load-bearing in the door | Glass set into a frame designed for board panels flexes and rattles |
If the palette has not been fixed yet, shortlist from named products rather than adjectives. Tonal choices such as Bronze Glass Wardrobes and Smoked Glass Wardrobes give the reviewer a reference point that survives translation between design office and factory. Where the brief calls for texture rather than colour, ribbed options behave very differently under side light — worth a physical sample before approval.
3. Confirm the acrylic: finish, direction and edge
Acrylic panels are specified by three attributes that renders flatten into one.
- Sheen level. High gloss and matte read as opposite products under the same luminaire. A scheme mixing both across a run needs the sheen stated per panel, not per wardrobe.
- Colour identity. Approve against a physical swatch with a reference number, and record whether the sample shown was lit warm or cool. Gloss acrylic in particular shifts noticeably between daylight and downlight.
- Edge and face treatment. Whether the panel is wrapped, machined to a mitre, or butt-joined into a frame changes both appearance and how the door takes knocks during installation.
Also confirm which way the panel faces. Metallic and directional acrylics have a grain; a run installed with panels reversed reads as two different colours in one elevation. This is cheap to state on a drawing and expensive to fix after fitting.
Where a project needs the softer end of the range, Matte Acrylic Wardrobes and White Acrylic Wardrobes are separate products with different edge detailing, not one product in two colours — approve them as separate items.
4. Confirm the frame that carries both
Glass and acrylic have different weights, thicknesses and fixing details. The profile between them decides whether the combination looks intentional or improvised.
- Profile material and finish. Anodised, powder-coated or wrapped aluminium; state the colour reference and whether both faces of a visible profile match.
- Profile width and sightline. Agree the visible face dimension on the drawing. A profile widened to carry heavier glass changes the proportion of the whole elevation.
- Glass-to-frame interface. Setting blocks, gaskets and clearance at the pane edges — this is what stops rattling and edge chipping.
- Handle or pull detail. Whether the profile itself carries the pull, or a separate handle is fixed into it. Drilling a finished profile on site rarely matches the shop drawing.
For schemes where the frame is part of the design language rather than a hidden structure, review Aluminum Frame Glass Wardrobes alongside the combination type so the profile family is consistent across the project.
5. Confirm the opening mechanism before the elevation
The mechanism governs clearances, and clearance governs whether the design fits the room at all. Approve it as a decision, not an assumption.
- Sliding or hinged. Sliding needs track depth and overlap; hinged needs a swing arc that must be clear of beds, vanities and doors. Check the arc against the furniture layout, not just the wall line.
- Track and hardware duty. Glass-fronted doors are heavier than board-fronted ones. Confirm the track, runners and hinges are rated for the finished door weight, including glass.
- Maximum single-leaf size. Every profile family has a practical limit on leaf height and width. Ask for it in writing before approving tall full-height leaves.
- Access to hardware after fitting. Adjusters, rollers and soft-close units need to remain serviceable once the wardrobe is installed against finished walls and floors.
If part of the scheme is specified as sliding, keep the mechanism consistent across types — Glass Sliding Door Wardrobes and combination sliding units should share the same track family where they sit in one run.
6. Confirm dimensions against site conditions, not architectural drawings alone
Combination wardrobes are made to measure, which means the measurement is the project team's responsibility and not a tolerance the factory absorbs.
- Take final dimensions after finished floor and finished ceiling levels are set. A made-to-measure unit ordered off structural drawings will be wrong by the build-up of screed, tile and ceiling.
- Record out-of-plumb and out-of-square walls. Scribed reveals and sash faces need to be drawn in, or the gap is left for the installer to solve on site.
- Confirm skirting, architrave and service runs. Anything that must be cut around or notched into should appear on the shop drawing with dimensions.
- State the reveal strategy explicitly. Flush-to-ceiling, shadow gap, or scribed to wall — pick one per elevation and show it in section.
7. Confirm what has to be seen before production starts
For a two-material wardrobe, a colour chip is not enough evidence. Agree in advance which of the following will be produced and signed off, and who signs it.
- A physical sample panel showing glass, acrylic and profile together, viewed under both daylight and the project's artificial light.
- A mock-up or one-off door leaf where the profile interface and handle detail are new to the team.
- Approved shop drawings with dimensions, materials named by product reference, and the bay schedule attached.
- A written record of substitutions. If any component is changed for availability, it goes back to the approver rather than being absorbed in production.
This is where custom and OEM capability earns its place in a project programme. Where finishes, textures or dimensions fall outside catalogue options, prototyping and material selection happen before tooling and batch production, so a change of mind costs a sample rather than a container.
8. Confirm logistics, handling and installation sequence
Glass is the constraint in the delivery plan. Everything else about a combination wardrobe follows from it.
- Packaging standard for glass panels — vertical or flat racking, edge protection, and how panes are identified against the bay schedule.
- Route survey. Lift dimensions, stair turns, corridor widths and lift capacity decide maximum pane size as surely as the design does.
- Delivery sequence. Carcasses first, hardware second, glass last where site conditions are still dusty or wet. Glass installed before painting and flooring gets damaged or contaminated.
- Snag regime. Pane-by-pane inspection on handover: edge chips, setting-block alignment, door adjustment, sheen consistency across a run.
A short pre-approval checklist
- Bay schedule naming every glass bay and acrylic bay, with what each shows or hides
- Glass specified by tone, treatment, safety build, thickness and edge work — with a sample reference
- Acrylic specified by sheen, colour reference and edge treatment, with orientation noted for directional panels
- Profile family, finish and visible face dimension drawn on elevation
- Opening mechanism confirmed, hardware rated for finished door weight including glass
- Final site dimensions taken after finished floor and ceiling levels; out-of-plumb recorded
- Sample panel or mock-up produced and signed before production release
- Packaging, route survey, delivery sequence and snag list agreed with the supplier
Bring the specification to the manufacturer early
SANTERSON is a China-based furniture and building materials manufacturer supplying custom, made-to-measure wardrobes for villa, hospitality and office projects, with design coordination, production, door-to-door logistics and installation support. Send the bay schedule, glass and acrylic references, and site dimensions together and the gaps show up at quotation stage rather than on site.
Start with the Glass & Acrylic Combination Wardrobes product page, or contact the project team directly to review drawings and finish samples before approval.