A shower set is a small line item on a bathroom schedule, but it touches plumbing rough-ins, wall finishes, hot water supply and site installation — which is exactly why vague enquiries turn into slow quotes and, later, disputes. If you are sourcing the Gun Grey Digital Display Rain Shower System for a villa, apartment or hotel room package, the quality of the supplier's answer depends almost entirely on how much usable information your request for quote (RFQ) carries. Below is the information set we ask buyers to send, and why each item changes the price, the packing list and the installation outcome.
Start with quantity, room mix and delivery location
Quantity is more than a number. Ten sets going to one villa and ten sets split across three sites are different jobs — consolidation, carton count and freight mode all change. Tell us:
- Total quantity of shower sets, plus any spares you want held for maintenance.
- The room mix — how many master bathrooms, guest bathrooms, staff or poolside bathrooms — because the same wall-mounted set is often specified at different heights and with different accessories per type.
- Destination port or door-to-door address, and who handles customs clearance. Our logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, paperwork and shipment tracking, but the terms you want — port-to-port or delivered to site — have to be stated in the enquiry so we quote the right scope.
- Required on-site date, and whether sets need to arrive together or can ship in phases by floor or building stage.
If your project runs across more than one country or has a staged handover, say so at the start. Phased delivery changes packing, labelling and how spares are allocated, and it is far cheaper to plan that before production than to split a container afterwards.
Confirm the wall construction before anyone quotes the valve body or slide bar brackets
This is the most common source of rework on wall-mounted shower sets. The Gun Grey set is a wall-mounted system with an overhead rain shower, a handheld sprayer on a slide bar and a mixer body fixed to the wall — so what sits behind the tile decides how it is fixed and whether anything extra is needed:
| Wall condition on site | What to state in the RFQ |
|---|---|
| Masonry or concrete, rendered and tiled | Finished wall line and tile set-out drawing, so valve outlets and slide bar brackets land where designed. |
| Stud or timber framing with lining boards | Board type and thickness, blocking or backing provision, and rough-in depth from finished face to the centre of the water outlets. |
| Existing bathroom being renovated | Photos of current outlet positions, spacing and pipe centres, plus the distance between hot and cold inlets. |
| Wet area with a waterproof membrane | Membrane type and penetration rules for that project, so fixing methods are agreed before anyone drills on site. |
Send the finished-floor-level reference and the intended height of the overhead shower. A rain head taken from a false ceiling line behaves differently from one fixed above a tiled wall, and that affects whether an extension or alternate arm is needed.
Buyers who send only a product photo and a room count usually end up with the wrong fixing set on site. The drawing does not have to be detailed — a marked-up plan showing outlet centres, heights and wall type is enough for us to confirm what goes in the carton.
Buyers who send only a product photo and a room count usually end up with the wrong fixing set on site. The drawing does not have to be detailed — a marked-up plan showing outlet centres, heights and wall type is enough for us to confirm what goes in the carton.
State water supply and pressure conditions
A digital readout does not change how a shower set performs under site water conditions, so treat this section like any other shower enquiry. Include:
- Mains pressure or tank-and-pump supply, and the static pressure at the bathroom if known.
- Hot water source — storage cylinder, instantaneous system, solar or heat pump — and whether hot and cold feed from a balanced supply.
- Water quality notes for the region: hard water, bore water, desalinated or recycled supply. Finish care and spare-part needs follow from this.
- Whether rooms need temperature limiting, and whether thermostatic control is required by your project standard rather than only a digital readout.
Two points follow. First, the product page states that the built-in screen shows real-time water temperature, which helps in family bathrooms, hotel rooms and shared facilities where scalding risk matters; it does not state a thermostatic control or how the display is powered, so treat those as items to confirm rather than assume. Second, tell us the hot water source — an instantaneous system and a storage cylinder behave differently at the handset, and the difference surfaces as complaints after handover.
Fix the finish, function and configuration in writing
Product names carry finish and format details that get lost between a mood board and a purchase order. For this set, confirm:
- Finish: matte gun grey across body, arm, handset and slide bar. Ask for a physical sample or a current production photo before bulk order, because dark finishes show limescale differently from chrome.
- Overhead head size and shape: the large square rain head gives full-coverage rainfall flow; confirm it suits your shower recess dimensions and glass enclosure.
- Handheld sprayer: multi-function handset with spray modes, on a height-adjustable slide bar, with coiled hose. Check hose length against the recess and whether a second outlet is needed.
- Controls: the diverter arrangement between rain head and handset, and how many control outlets each room type has.
- Included accessories: the set ships with installation accessories; ask for the packing list so your plumber can check it against site requirements before the carton opens.
The product page states a matte gun grey surface that resists water stains and fingerprints and is easy to maintain. In hard-water regions, ask which cleaning agents are approved for the finish and write them into the maintenance manual you hand to the building operator — the wrong product is the quickest way to lose a dark finish in a shared bathroom.
Say what you need customised, and to what level
Project buyers rarely stop at a catalogue item. Our custom and OEM service covers bespoke finishes and textures, prototyping, private labelling and flexible minimum order quantities — but each of those has to be named in the RFQ or it will not appear in the price. Specify:
- Finish deviation from gun grey, for example a matched tone across tapware, shower sets and bathroom accessories in one package.
- Branding: engraved or embossed logos on handsets or packaging, plus carton labelling by room number or floor so site teams can distribute cartons without opening them.
- Packaging format: individual room packs, floor-based palletisation, or bulk cartons for local repacking.
- The document set you need with the shipment — commercial invoice, packing list, certificate of origin, and any test reports or material declarations your consent process requires.
Custom work carries lead time. If a matched finish needs a sample run before bulk production, say so in the first enquiry rather than after the order is placed, because that sample has to be approved before tiling details are frozen.
Ask for a quotation broken down so it can be compared
A single lump-sum figure cannot be compared with another supplier's. Ask for the quote split into:
- Unit price by configuration, with the exact model description repeated on each line.
- Packaging and palletisation cost, carton count, total volume and gross weight — these drive freight cost as much as the product does.
- Freight option and terms for your destination, with transit alternatives separated.
- Spare parts and consumables priced separately: hoses, handsets, cartridges, display units.
- Any tooling or setup cost tied to customisation, so it is visible rather than buried in the unit rate.
Packaging data matters more than buyers expect. Carton count and volume decide whether your order shares a container with cabinetry and flooring or needs its own space, and that decision is easier to make before production starts than after.
Installation, warranty and after-sales questions to include
The purchase does not end at delivery. Our installation and after-sales support page describes on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance; the exact terms for your project belong in the order documents, not in an email thread. Ask in the RFQ:
- Which local code or standard applies to shower rough-in and outlet heights in your country or state — you set this with your plumber, then tell us, because we cannot assume it for you.
- Warranty scope: what is covered on the valve body, the display unit, hoses and finishes, and for how long per component.
- Spare part availability window, so a hotel or strata maintenance team can order a handset or hose later without replacing the whole set.
- The reporting route for defects found once cartons are opened: photograph, carton number, room reference.
Ask for spare handsets and hoses with the main order — commonly one of each per ten sets. It costs little while production is running, and it saves an emergency local purchase when a contractor damages a part during fit-out.
Copy-paste RFQ checklist
- Project name and type (villa / apartment / hotel), destination address or port, required site date.
- Quantity by room type, plus spares quantity.
- Bathroom drawings: finished floor levels, wall build-up, tile set-out, rough-in centres and heights.
- Water supply type, pressure if known, hot water source, water quality notes.
- Required control type — digital display only, or thermostatic / pressure-balancing — plus any temperature-limiting requirement.
- Finish confirmation, head size, handset functions, slide bar and hose details, diverter arrangement.
- Customisation scope: finish match, branding, carton labelling by room.
- Documents needed for customs and consent submission.
- Quotation format: unit price, packaging data, freight options, spares, tooling.
- Warranty terms per component and spare-part availability period.
Send this with your drawings in one message and you should receive a usable quotation without another round of questions.
Order it with the rest of the bathroom package, not as an isolated item
Shower sets rarely cause problems on their own — the issues appear where they meet basins, vanities, WC suites, wall panels and lighting. Sourcing them inside one interior fixtures package keeps finishes consistent and reduces the number of separate deliveries your site team has to receive. If you are also specifying ceramics, see our bathroom sanitary fixtures range, or compare this model against the Modern Rainfall Shower System with Handheld Sprayer where a digital readout is not needed in every bathroom.
As a one-stop furniture and building materials supplier, we handle specification, production, packing and shipping for villa and hospitality projects, including work in Australia. Send the checklist above with your drawings and we will return a quotation you can compare line by line.
Frequently asked questions
Can I send only a photo of the product and a quantity?
You will get a price, but not one that reflects your site. Without wall build-up, rough-in heights and water conditions, we cannot confirm which arm, brackets or accessories your installers need, and the difference usually surfaces as a variation after delivery.
Does the digital display need power?
Ask us to confirm this in writing for the exact configuration you are ordering. The product page states a built-in screen showing real-time water temperature but does not state how the display is powered, so do not let your electrician or plumber close up the wall on an assumption. If a wiring point or access panel is needed, it has to be built in before tiling — that is exactly the kind of detail the RFQ answer should settle.
Can one order mix this gun grey set with other finishes for other rooms?
Yes. Buyers commonly specify the digital display set in master bathrooms and a simpler rainfall set in guest or staff bathrooms, then consolidate into one shipment with cartons labelled by room type.
How early should the shower enquiry go out?
Before wall set-out drawings are frozen. Outlet centres, overhead height and any wiring provision all have to be fixed before tiling, so an enquiry sent after that point can only confirm what is already built into the wall.
Send your RFQ to SANTERSON. Include quantity, drawings, water conditions and the quotation format you need, and we will quote the Gun Grey Digital Display Rain Shower System as part of your bathroom package.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com | Contact page