A design brief for a kitchen usually arrives as a mood board, a plan drawing and one sentence: "we want a two-tone European look." That is not yet something a factory can price or build. The gap between the picture and the built cabinetry is filled by a single document — the enquiry. Below is how we at SANTERSON read a brief, and exactly what we need in an enquiry so a Two Tone European Cabinets quotation comes back usable the first time.
What a design brief gives you, and what it leaves out
A brief communicates intent: warm timber against pale panels, handleless fronts, a kitchen that reads calm rather than busy. It rarely states panel thickness, which carcass the tall units sit in, how the oven housing is ventilated, or where the scribe line falls against an uneven floor. Those are the details that decide whether two-tone cabinetry installs cleanly or ends up adjusted on site.
An enquiry is the reverse document. It takes the intent and converts it into decisions a manufacturer can act on: dimensions, material pairing, door style, hardware, appliance schedule and delivery point. If your brief is already written by an interior designer or architect, converting it is mostly a matter of answering the six questions below. If you are writing the brief yourself, answer them as you go and the brief and enquiry become the same file.
Six things to settle before you send the enquiry
1. Which surface carries the darker tone
Two-tone schemes fail more often on placement than on colour. The common split is a timber-look or dark base run with lighter tall and wall units, which keeps a galley or L-shaped kitchen feeling open. The opposite split — dark tall units framing a light perimeter — works when the tall bank faces a window wall. Tell the factory which run is which, and whether the island repeats the base tone or the tall-unit tone. A single annotated plan answers this in one line.
2. Door profile, not just colour
"European" covers several distinct door families, and they price differently because machining differs. In our catalogue the Modern European Kitchen Cabinet collection is split by profile: Flat Panel European Cabinets, Handleless European Cabinets, and Matte European Cabinets. A two-tone scheme in a flat panel and the same scheme in a handleless profile are different build-ups, with different edge details and different hardware. Name the profile in the enquiry; do not leave it to be inferred from a photograph.
3. Finish family for each tone
The two tones rarely share a finish. A typical combination pairs a wood-grain or veneer surface with a solid panel, and the solid side is where gloss level shows up most. Specify the finish family for each tone separately — matte, high gloss, acrylic, lacquer, melamine or veneer — and state whether both tones must come from one collection so they age consistently. Where a scheme mixes families across rooms, say so explicitly rather than assuming a match.
4. Dimensions with a tolerance note
Send overall run lengths, heights and depths, plus setting-out dimensions for the tall units and any appliance housing. Note which walls are true and which will be scribed, and give finished floor levels — that one figure changes leg heights, plinth heights and whether the worktop line clears a window sill. Our kitchen cabinetry is made to measure, so an enquiry with site-verified dimensions goes straight into layout; an enquiry with drawing-only dimensions needs a round of clarification before it can be quoted.
5. The appliance and internal-fitting schedule
Two-tone kitchens usually hide their bulk: ovens, refrigerator columns and drawer banks sit behind the panels. Send the appliance model list or at minimum the recess dimensions for each built-in unit, and state which cabinets are drawers, which are shelf carcasses, and where you want glass display units with lighting. Internal fittings are priced per unit, so a schedule here prevents both a thin first quote and a change order later.
6. Scope, delivery point and project type
State whether the enquiry covers kitchen cabinetry only or extends to wardrobes, vanities, wall panelling and other joinery in the same building — matching veneers and panel colours across rooms are far easier to coordinate when ordered together. Then give the delivery address, the project type (villa, apartment block, boutique hotel) and your required site date. That determines whether the order ships as one consignment or is split, and how production slots are booked.
How to structure the enquiry itself
Send one email with a short cover note and four attachments: the plan or elevation drawings, a dimension sheet, the appliance schedule, and two or three reference images of the two-tone effect you want. Keep the cover note factual — collection name, profile, finish for each tone, quantity of kitchens or room list, delivery point, target date. Reference images help us match the tonal contrast; they never replace the drawings.
| Section | What to include | Why it matters |
|---|---|---|
| Project header | Contact, project location, project type, required site date | Sets production slot and freight plan |
| Product reference | Collection and profile name, plus the two finishes | Fixes build-up and machining before pricing |
| Drawings | Plans, elevations, reflected ceiling where lighting is built in | Shows run lengths, tall-unit positions, scribe lines |
| Dimension sheet | Overall and setting-out dimensions, finished floor levels | Avoids on-site adjustment of carcasses |
| Appliance schedule | Models or recess sizes for each built-in | Determines housings, vents and panel fields |
| Internal fittings | Drawers, shelves, glass display units, lighting | Priced per unit; prevents later change orders |
| Scope beyond the kitchen | Wardrobes, vanities, panelling in the same building | Keeps veneers and panel colours coordinated |
A worked example: wood grain against white
Take a scheme we have on site as a reference point: natural wood-grain base run and island, matte white tall units and wall cabinets, glass display units with warm LED strips on either side of the open shelving, and an integrated refrigerator and oven behind the panels. That is the Two Tone Wood & White Modern Kitchen Cabinets layout, and it converts into an enquiry with six lines: profile (flat panel European), tone A (wood grain, finish family), tone B (matte white), glass units with lighting, appliance recess sizes, run lengths with finished floor level.
The same image could also be built as a two-tone acrylic, lacquer, melamine or veneer scheme. The visual difference is small on a mood board and significant on an invoice and in a hand sample. Naming the finish family in the enquiry is what stops you comparing quotations that are not actually comparable.
What happens after the enquiry reaches us
SANTERSON has been manufacturing furniture and building materials in China since 2008, supplying project customers in hospitality, villas and offices. Our cooperation steps are straightforward: brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. For cabinetry enquiries that means we check the drawings against your dimension sheet, confirm profile and finish for each tone, and return a layout with the panel schedule attached.
If the kitchen is part of a wider fit-out, Custom & OEM Service covers bespoke finishes and textures, prototyping and private labelling, so joinery across kitchens, bedrooms and bathrooms can be built to one specification. Where drawings are still at concept stage, Interior Design Services covers space planning, furniture layouts and 3D renderings before anything goes into production. Freight by sea, air or rail with door-to-door delivery is arranged through our logistics service, with customs paperwork handled on our side.
Before you press send: check that the two tones are named separately, that the door profile is written down rather than implied by a photo, and that finished floor levels are on the dimension sheet. Those three items settle most of the cost difference in a two-tone quotation.
Send us the brief
If you have drawings, even rough ones, send them with the six answers above and we will come back with a layout and a panel schedule for your project. Recent project work in Australia — villas in Sydney, Melbourne, Willoughby, North Turramurra and Perth — is listed under Project Cases, and the wider cabinetry range sits under Kitchen Cabinets and Hotel Appliances. Contact us through the contact page to start an enquiry.