A quotation for clear glass aluminum frame wardrobes usually arrives as a PDF with elevations, a unit price and a few lines of notes. Two proposals that look identical on the cover page can produce very different wardrobes on site. The difference is almost always in what the document specifies — and what it quietly leaves out.
The checklist below follows the order in which a buyer, contractor or interior consultant actually reads a proposal: scope first, then the specification behind the glass and frame, then the commercial terms, then the site conditions that decide whether the job installs cleanly.
1. Confirm what the proposal is actually pricing
Before reading a single line about materials, establish the boundary of the offer. Made-to-measure joinery such as frosted glass aluminum frame wardrobes and the clear-glass version is manufactured to the dimensions of a specific opening, so an incomplete scope shows up later as a variation order.
▪ Which rooms, elevations and run lengths are included — and are the drawings dimensioned in millimetres against a measured site survey?
▪ Does the price cover scribes, fillers, top panels to ceiling, skirting cut-outs and any corner or return units, or are these optional extras?
▪ Are internal fittings — shelves, drawers, hanging rails, lighting in display niches — inside the unit rate, or quoted as accessories line by line?
▪ Is the proposal based on your drawings, or on the manufacturer’s standard module sizes adapted to your wall? Ask this directly; the answer changes how much site adjustment you should budget for.
2. Read the glass specification, not the product name
“Clear glass” on a line item does not tell a specifier enough to compare two bids. Ask for these details in writing and put them in the purchase order:
| Item | What to require in the proposal | Why it matters |
|---|---|---|
| Glass type | Toughened or laminated safety glass, and where each is used | Wardrobe doors are impact-prone moving panels; safety glazing governs how a break behaves. |
| Thickness | Millimetre thickness for door infill and any fixed side panels | Thickness drives door weight, which drives hinge and runner selection. |
| Finish and tint | Clear, bronze, smoked or frosted — matched to a named sample reference | “Clear” reads differently against low-iron and standard float glass; a sample reference removes the argument. |
| Edge treatment | Polished edges, arrised corners, any drilled fixings | Visible edges on clear glass are a quality giveaway; polished edges cost extra if added late. |
| Printed or etched patterns | Whether decorative patterns are printed, sandblasted or film-applied | Affects cleanability and whether the pattern side faces in or out. |
Where a project mixes glazing — clear doors on one wall, smoked glass aluminum frame wardrobes in a dressing room — the proposal should list each glazing option separately with its own reference, rather than one blended “glass infill” line.
3. Check the frame and hardware schedule
The aluminium profile is what keeps a glass-fronted wardrobe flat, square and quiet in use. A serious proposal names the system rather than describing it in adjectives.
- Profile: alloy grade and finish (anodised, powder-coated or wood-effect transfer), profile depth, and the frame colour reference you approved.
- Door orientation: sliding, hinged or pocket — stated per opening, with the number of doors and their widths. Wide glass doors need hardware rated for the panel weight; ask for the load rating.
- Runners and hinges: brand or model of top track, bottom guide, soft-close and hinge type. This is where cheaper proposals save money invisibly.
- Handles and profiles: integrated finger pull or surface handle, and whether a handle cut-out breaks the profile line at mid-height.
- Carcass board: substrate, thickness, edge banding and the decorative finish code, including matching for interior surfaces that stay visible through clear glass.
Clear glazing makes the inside of the wardrobe part of the design. If the proposal does not state the interior board finish and how shelves are fixed, request that detail before signing — exposed cam locks and unmatched interiors are the most common complaint on glass-fronted joinery.
4. Test how the manufacturer handled your drawings
The proposal itself is evidence of how a factory works. Compare it against what you sent:
- Were your dimensions reproduced exactly, or rounded to production modules without a note?
- Do the elevations show door joints, returns and reveals in positions that will read well on site?
- Are openings, switches, skirting, ceiling lines and services shown as constraints, or ignored?
- Did they raise the problems you expected — out-of-plumb walls, restricted ceiling height, floor finish build-up — or accept every dimension uncritically?
A manufacturer who queries a level difference and proposes a scribe solution is worth more than one who quotes a lower price and leaves the adjustment to the site crew. For villa and hospitality work this kind of coordination is the reason buyers use a custom and OEM service instead of buying standard units and adjusting on site.
5. Compare the commercial terms line by line
| Term | Question to settle before award |
|---|---|
| Pricing basis | Price per linear metre, per square metre of elevation, or per unit? All bids must use one basis. |
| Inclusions | Hardware, glazing, packaging, inland haulage, freight and duties — state which party carries each. |
| Delivery point | Port, or door-to-door delivery to the apartment block or hotel? Who handles last-mile and lifts? |
| Packaging | Glazed doors crated individually, with edge protection and a crate-to-opening map for the install crew. |
| Payment and re-issue | Deposit, milestone payments, and how a drawing change after approval is priced. |
| Warranty and spares | Coverage period and exclusions in writing; availability of replacement glass, runners and panels years later. |
For an overseas order, ask which documents accompany the shipment — commercial invoice, packing list and any certificates your customs broker will ask for. A proposal that names these up front usually delivers without a scramble at the border.
6. Verify the sample before production release
Release to production only after you have held a physical reference: a profile corner with the chosen finish, a glazed door sample in the specified glass and tint, and a board coupon of the carcass finish. Sign and date it, attach the sample reference number to the purchase order, and state that production follows the approved sample. This single step removes most disputes about whether delivered glass matches what was quoted.
Where the project also needs matching kitchen or bathroom joinery, ask for the wardrobe and cabinetry to be specified from the same finish schedule. SANTERSON’s interior fixtures and built-in furniture ranges are developed for project-specific dimensions and finishes, which keeps frame colours and board tones consistent across rooms.
7. Confirm the installation and handover plan
Glass-fronted wardrobes are unforgiving of an uneven floor or wall. The proposal should say who sets out on site, what tolerance is expected, and what happens when the substrate falls outside it. Look for a defined sequence: site survey verification, production, delivery against a crate schedule, installation, snag list, then sign-off — plus named responsibility for each stage.
- Who checks level and plumb before the units arrive, and who supplies packing or scribing shims?
- Are wall fixings suitable for the actual wall build-up (masonry, stud, tile backer)?
- Is glazing protected during other trades’ work, and who cleans the glass before handover?
- What is the response route if a panel arrives damaged — replacement panel only, or full door rebuild?
Scoring sheet for your next three bids
Score each proposal 0–3 on: scope completeness; glass specification detail; named hardware; responsiveness to your drawings; transparent commercial terms; approved physical sample; and a written installation sequence. A bid that scores below the pass mark on any two of these is not cheaper — it is deferred cost.
SANTERSON has manufactured furniture and building materials since 2008 and supplies project work end to end, from design coordination and made-to-measure production through logistics and installation support.
Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com, and send your elevations with the glazing and finish references you want quoted. Contact us for a proposal built to your drawings.