A swim spa quotation is only as good as the brief behind it. For a configurable product such as our Outdoor Swim Spa WS-PC08T, the difference between a rough budget figure and a firm, comparable price comes down to about eight items of information. Here is exactly what we need from architects, contractors, developers and private buyers so the quotation matches the site it will actually be installed on.
1. The model reference and how fixed it is
Start with the model code as published — WS-PC08T — and tell us whether that code is a firm requirement or simply the configuration you liked in the catalogue. Our swim spa range includes shorter, narrower and shallower variants, so if your plot or budget points in another direction we would rather propose the closest fit than quote a model you will not buy.
The published catalogue entry for WS-PC08T lists overall dimensions of 8000 × 3000 × 1500 mm, one control system, one swim training system, one filter pump, a jet total of 28, three LED lights and a total power figure of 10.85 kW. Treat those numbers as the starting point of a conversation, not as a fixed specification: options and accessories change what is fitted, and therefore what is quoted.
2. Site dimensions, access and ground conditions
Send us the clear internal dimensions of the recess, deck or terrace the spa will sit in, plus a simple sketch if you have one. We need to know:
- Whether the shell is fully recessed, partly recessed or freestanding above ground
- Available width and length around the shell for plant access, steps and future maintenance
- The route from the delivery vehicle to the position — gate widths, turning circles, overhead cables, tree cover, stairs or a crane lift
- Slab or footing details, and who is responsible for preparing them
Access is the item most often left out of an enquiry. An 8 m shell that fits the drawing can still be undeliverable down a narrow suburban lane, and that changes both the transport method and the price.
3. How the spa will be used
Usage drives the equipment list more than any other factor. Tell us whether the spa is for daily lap swimming and training, hydrotherapy and rehabilitation, a children's area, or a hotel, resort or clubhouse facility with public access. A training-led installation puts weight on the swim training system and water flow; a therapy-led one shifts attention to jet layout, seating depth and water temperature stability; a commercial setting raises questions about duty cycle, filtration capacity and control access.
4. Equipment you want included, and what you will supply locally
Catalogue-listed options for this range include the control system, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Please mark each one as required, optional or excluded in your enquiry, and tell us what you intend to source on site. A quotation that bundles a heat pump and one that assumes local supply are not comparable, so we price both only when you ask.
| Item | What to confirm in your enquiry |
|---|---|
| Swim training system | Included as standard on this model; state the intended use so we can confirm suitability |
| Jets | Catalogue jet total for WS-PC08T is 28 — confirm the hydrotherapy layout you want |
| Lighting | Catalogue lists three LED lights; state colour or control preferences if any |
| Water treatment | Ozone is shown as a feature; add UV sterilisation and sand filtration if you want them quoted |
| Heating | Heat pump required, or local supply? Insulation level matters for running cost |
| Access | Steps, handrails, cover or enclosure — list what the site needs |
5. Power supply and plant-room details
The catalogue figure for WS-PC08T is 10.85 kW total power, but the actual load depends on which options are fitted, so we need your electrical situation described in writing: available supply capacity at the boundary, single-phase or three-phase, local voltage and frequency, the distance from the isolator to the spa, and where the control panel and any plant equipment will sit. Earthing, protection and circuit sizing follow your local regulations and must be confirmed with your own electrical contractor; we quote the equipment, not your installation.
6. Climate and exposure at the site
Tell us where the spa will live: covered or open to the sky, shaded or in full sun, coastal or inland, and whether it stays in water year-round or is taken out of service seasonally. These details affect insulation, cover selection and how we advise you to run heating and filtration. We will not claim a configuration suits your climate unless we can point to the equipment that makes it work — that is why we ask.
7. Quantity, project stage and delivery terms
For developers, builders and hospitality groups, one number changes the quotation immediately: quantity. A single villa unit and a set of units across several villas or a resort are different production and shipping exercises. Alongside it, please give us:
- The project stage — concept budget, tender, or ready to order
- Your required delivery date on site and any programme milestones it supports
- Delivery location and the Incoterms you want quoted; we arrange sea, air and rail freight with customs paperwork and door-to-door delivery as part of our logistics service
- Whether installation support is needed on site, which we cover under installation and after-sales support
8. Drawings, documentation and finish preferences
Attach whatever you already have: architectural plans, landscape drawings showing the spa position, electrical layouts, and any specification document with the swim spa line item in it. If cabinet colour, coping, step material or a branded control panel matters to your design, say so — this is a custom and OEM product range, and finish choices are part of the quotation rather than an afterthought. As a furniture and building materials manufacturer working on villa and hospitality projects, we can also quote matching poolside loungers, outdoor dining sets and changing-room cabinetry in the same package if your project needs them.
A short enquiry template you can copy
- Model: Outdoor Swim Spa WS-PC08T (firm / open to alternatives)
- Site: city and country, recessed or freestanding, clear dimensions, access notes
- Use: training, therapy, family, commercial
- Options required: heat pump, UV, sand filtration, insulation, steps, cover
- Power: supply type, voltage/frequency, isolator distance, plant location
- Quantity and project stage
- Delivery: destination, Incoterms, required on-site date
- Attachments: plans, sections, electrical layout, specification extract
Send the brief and we will price the actual job
With those eight items we can return an itemised quotation: shell and structure, equipment list by line item, options priced separately, packaging, freight to your site and installation support if requested. That format lets you compare us against any other supplier honestly, line for line.
Tell us the model, the site conditions, how the spa will be used and your delivery terms, and we will quote Outdoor Swim Spa WS-PC08T for your project.
Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use our contact page. Enquiries receive a response within 24 hours during business hours, Monday to Saturday, 8:00 AM–6:00 PM (GMT+8).