A swim spa becomes a line item that procurement can price, deliver and install only when the brief states what has been decided and what still needs confirmation. The notes below follow the structure of an actual sourcing enquiry for Outdoor Swim Spa WS-S12, one model in our configurable outdoor swim and hydrotherapy range, so that design teams, contractors and buyers work from the same sheet.

Why the brief format decides the outcome

Pool and spa products sit at the boundary between landscape works, plumbing, electrical installation and interior fit-out. When a brief lists only a model number, quotations come back with different assumptions about pumps, sanitation, insulation and site preparation, and the differences surface late in the programme. A written specification that separates confirmed items from open questions lets us quote against your scope rather than against our own guesswork.

For villa, resort and private-club projects we handle swim spas as part of wider outdoor furniture for villas and resorts packages, so the same procurement sheet also carries loungers, pergolas and poolside seating. Writing the spa section to the standard below keeps that larger package comparable across suppliers.

Section 1 — Identify the model and its published envelope

State the exact model name as it appears on the product page, then record the catalog dimensions. For WS-S12 the catalogue lists an envelope of 11740 × 2200 × 1470 mm. Treat those figures as the unit footprint to be checked against your deck, setback and access route — not as an installation clearance. Your structural engineer and site team determine foundations, waterproofing, plant-room routing and any local approval requirements.

Naming matters in correspondence. The catalogue also carries a variant with the same envelope that adds a swim training system; the two listings differ on that single item. Quote the full model code in every drawing revision, purchase order and shipping document so the quotation, production order and delivery note all refer to one configuration.

Section 2 — Copy across the specification block

The following items are published for WS-S12 on its product page. Put them in a table in your brief and mark each one as accepted, substituted or to be confirmed.

Specification itemValue shown for WS-S12Status in your brief
ModelWS-S12Confirmed by model code
Catalog dimensions11740 × 2200 × 1470 mmChecked against site envelope
Control system1 setConfirm control location and access
Water pump2 pcsConfirm duty and spare provision
Filter pump1 pcConfirm filtration cycle with your plumber
Jet total73 pcsConfirm jet layout by seating position
LED lighting1; 50 small LED lightsConfirm colour and control scheme
Total power7.65 kWHand to electrical designer for supply sizing
Swim training systemNot listed in the captured specification block for this modelDecide now: include, or select the variant that lists it

The power figure is a total connected load, not the supply your electrician must provide. Give the number to the electrical designer together with local voltage and protection requirements, and let them specify the circuit, isolation and earthing. Do not assume an existing supply will carry it.

Section 3 — List the options you intend to take

Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs a yes or no in the brief rather than an open comment.

  • Heating: state whether the spa is used year-round or seasonally, since that decision drives heat pump selection and insulation specification.
  • Sanitation: name the method you want — ozone as shown in the catalogue features, plus UV sterilization if required — and identify who supplies dosing equipment if it sits outside our scope.
  • Filtration: confirm whether the standard filter pump arrangement is sufficient or sand filtration is specified for heavier public or club use.
  • Access: steps, insulation and control-system placement affect both the surrounding deck detail and the running cost, so fix them before the landscape drawings are issued.

Section 4 — Record site and interface conditions

Add a short block covering what your team is responsible for. Procurement records we see most often omit these, and they are the usual cause of a spa arriving before the base is ready.

  • Foundation or plinth design, load calculations and drainage falls — engineer's scope.
  • Deck level, waterproofing detail and access panel positions — contractor's scope.
  • Electrical supply, isolation and protection to the point of connection — electrical contractor's scope.
  • Delivery route, crane or forklift access, and the receiving window on site — buyer's scope.
  • Water supply, waste connection and any makeup-water arrangement — plumbing scope.

Where a project needs a different footprint, our Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool covers square, round, oval and curved configurations with an acrylic shell and structural reinforcement, which suits terraces and gardens where a standard rectangular envelope will not sit.

Section 5 — Compare before you fix the model

WS-S12 is one of several envelopes in the Swimming Pools and Swim Spas range, from compact spa units to long swim channels. Put two or three candidate models side by side in the brief with their catalog dimensions, jet totals, power figures and whether a swim training system is listed. Comparing at specification stage avoids paying for length you cannot use — and avoids discovering later that the shorter unit has no swim training system.

Items to confirm in writing before order placement

  • Included equipment list for the exact configuration, item by item.
  • Electrical requirements and supply assumptions for that configuration.
  • Which options are fitted at the factory and which are supplied loose for site installation.
  • Freight terms, delivery address and site access arrangements.
  • Scope of installation support and after-sales service for your country, as quoted in writing.

Section 6 — Route the brief through one procurement channel

Swim spas rarely stand alone in a project. When they are ordered alongside pergolas, loungers and other poolside seating, a single supplier handling the outdoor package keeps drawings, packing lists and delivery windows aligned. Our Turnkey Interior Project Solutions cover design coordination, custom/OEM production, logistics and door-to-door delivery, installation support and after-sales service, which is how swim spas have been delivered as part of villa and hospitality packages in projects we publish on the site.

Send the completed six-section brief with your drawings attached. We return a configuration sheet listing included equipment, options and electrical requirements for that exact model, and you compare it against competing quotations on identical terms.

Send us your swim spa specification. Include the model code, the site envelope, the option list marked yes or no, and the interface responsibilities above. We will confirm the configuration, included equipment and electrical requirements for Outdoor Swim Spa WS-S12 or the alternative that fits your programme.

Contact: PHILLIP · Phone/WhatsApp +86-13928214007 · Email santerson@qq.com · Enquiries page: santerson.com/contact