Integrated door and paneling work looks simple on a drawing: a door that disappears into a clad wall, no visible architrave, one continuous surface across the opening. In practice it is one of the few joinery items where the design intent, the manufacturing tolerances and the site sequence all have to agree before anything is cut. If you send an enquiry with only a mood board and a room name, the reply will be a questionnaire. If you send the information below, the first reply can already be a workable specification.
Start With the Role the Door Has to Play
The same flush opening behaves very differently depending on how often it is used and what has to stay hidden behind it. Before you talk about finishes, decide which of these you are actually buying:
- A bedroom or bathroom door that sits in a clad wall and needs to read as part of that wall when closed.
- A concealed access door to a cupboard, plant shelf or service zone that is opened occasionally but must remain invisible the rest of the time.
- An operating panel or sliding element that also acts as storage or display, where the panel itself carries the mechanism.
Our Integrated Door & Paneling page describes the product family as made-to-measure, with finish, layout and dimensions specified per project. That configurability is exactly why the brief matters: there is no standard size or fixed hardware set to fall back on.
The Information a Supplier Needs in the First Message
This is the checklist we would ask you for anyway. Sending it up front removes two or three rounds of email and stops pricing being quoted against the wrong assumption.
| Item | What to send | Why it changes the answer |
|---|---|---|
| Openings schedule | Every opening: width, height, wall thickness, hinge or slide side, quantity | Sizes drive panel build-up, hardware class and how the unit ships |
| Wall build-up | Stud or masonry type, lining method, whether the wall is already clad | Determines frame detail and what the site team must prepare before delivery |
| Finish intent | Painted, veneered, lacquered or textured panel; sample or reference image | The door leaf and the wall paneling have to be produced as one finish batch |
| Interface details | Floor finish thickness, skirting treatment, ceiling height, adjacent joinery runs | Sets the reveal, floor clearance and where the panel field starts and stops |
| Hardware preference | Handleless, concealed handle, push-open, concealed hinge; door weight expectation | Hardware selection is limited by leaf size and must be agreed before the panel is built |
| Programme | Site completion date, when wet trades finish, when you need goods on site | Fixes the cut-off for design freeze and the shipping route |
| Delivery location and terms | Project address, who receives goods, import arrangement you prefer | Affects packaging, container loading plan and documentation |
Drawings are welcome, but a marked-up PDF or even photographs of the wall with dimensions written on them is enough to start. What matters is that quantities and openings are complete, because an integrated door ordered piecemeal against an incomplete schedule is where cost overruns begin.
Decide How the Door Should Read Before It Is Manufactured
Three finish directions cover most projects, and each has a different manufacturing consequence:
- Flush and handleless. The leaf carries no visible ironmongery and the reveal is kept minimal. See Santerson Handleless Concealed Doors. This demands accurate setting-out on site, because there is no moulding to hide an out-of-plumb opening.
- Decorative but concealed. The leaf takes a decorative finish that continues the surrounding panel pattern. See Santerson Decorative Concealed Doors. Pattern alignment across the opening line needs to be agreed on a shop drawing.
- Hinged, wall-aligned. A more conventional leaf detailed so its face sits with the wall plane. See Santerson Flush Hinged Doors and Flush Wall Aligned Doors. This is often the pragmatic choice where openings are numerous or access is frequent.
Where the wall continues past the door, tell us whether you want the panel field to run through the opening or stop at it. That single decision changes the sub-frame, the leaf construction and the order in which panels go up.
Coordinate Paneling and Doors With the Rest of the Fit-Out
Doors and wall panels rarely sit alone. They meet cabinetry, media walls, vanities and lighting runs, and those trades usually come from different suppliers. If your joinery, storage walls and doors are produced to one set of levels and one set of finishes, the interfaces stop being arguments on site.
As a one-stop furniture and building materials supplier, we manufacture integrated doors and paneling alongside the cabinetry, storage walls and interior fixtures they connect to. For villa and hospitality projects this means one production plan, one finish schedule and one delivery window instead of four vendors reconciling tolerances after the fact. Our Wall Panel Systems and Flush Interior Doors are configured the same way, so a single set of openings can be resolved across both.
If you have not settled the layout yet, our design service covers space planning, product specification and production coordination before manufacturing starts. Send the drawings you have; we will mark what is missing rather than quote around it.
Questions Worth Asking Back
A supplier who takes integrated door and paneling seriously will answer these directly. If the answers are vague, the risk lands on your site team later:
- Which shop drawing will show the reveal, hinge positions and floor clearance before production?
- Are the door leaf and adjacent panels produced in one batch to guarantee a matched finish?
- What does the site team have to complete before goods arrive, and who sets out the openings?
- How are panels packed and loaded so they arrive flat, labelled and matched to the schedule?
- What happens if an opening on site differs from the schedule after delivery?
Material make-up, core construction, hardware brand and finish system for integrated doors and paneling are confirmed per project rather than published as fixed values. We specify them with you against the openings schedule and the finish sample you approve, so nothing is assumed on your behalf.
A Simple Way to Package the Enquiry
For a first enquiry that gets a real answer rather than a generic one, send four things: an openings schedule with quantities, a finish reference (sample code, brand paint name or photograph), your site completion date, and the delivery address with your preferred import arrangement. Add any drawings you already have.
From there we can confirm configuration options, prepare the shop-drawing level of detail you need for sign-off, and set a production and delivery plan around your programme — including door-to-door logistics and site support where the project requires it.
If you are specifying integrated doors into clad walls on a villa, apartment or hospitality project, send us the openings schedule and finish reference and we will come back with a specification to review.