Flush sliding doors look simple on a drawing: one clean plane, no visible frame, a panel that disappears into a pocket or slides across a wall. That simplicity is exactly why they are ordered too early. A door of this type sits at the junction of joinery, wall build-up, hardware and floor finishes, so an assumption made in week one shows up as a snag at handover. The checklist below covers the points our team asks project teams to settle before an order for Santerson Flush Sliding Doors is placed.

Start with the opening, not the door leaf

Santerson Flush Sliding Doors is listed as part of our Sliding Doors collection, with made-to-measure sizing, material and finish options and a layout tailored to the project; the page asks that dimensions and selected specifications be confirmed for each order. So the critical risk is usually not the door leaf but the opening it lands in. Before an order goes in, we ask project teams for three sets of numbers:

  • The structural opening as built, measured on site rather than taken off a drawing issued before the wall was closed up.
  • The finished floor level on both sides of the opening, including the thickness of tile, adhesive and any screed or underfloor heating, because a pocket or track has to clear all of it.
  • The wall build-up the door is being set into: stud depth, lining, and whether the pocket will be formed on site or supplied.

Where the opening is still open to change, we record the dimension as provisional and re-measure after the wet trades have finished. It costs a week; it saves a remake.

Confirm finish and material before production, not after

The product page offers material and finish options alongside made-to-measure sizing, but it does not publish a fixed board make-up or a closed finish schedule for this collection. That is deliberate: the same door type is specified against veneered panels, painted surfaces and laminates depending on the scheme, and each behaves differently on site. Two practical rules we apply:

  • Match the door face to the joinery or panelling it sits within, not to a sample board chosen in isolation. A flush door only reads as "flush" when the surface, grain direction and sheen continue across the wall.
  • Get the finish approved in writing against a physical sample before production starts. Colour and grain on a screen are not an approval, and a reprint at this stage stops the whole door package.

For villas and hospitality rooms where concealed doors, wall panelling and built-in cabinetry come from one supplier, we prefer to place those items in the same production batch. The relevant pages for that scope are Santerson Flush Interior Doors and Integrated Door & Paneling, which is where the alignment detail between door face and panel joint gets resolved.

Do not let one supplier see only half the wall

The most expensive risk on a flush sliding door order is split responsibility. The door leaves, pocket framing, track, runners, guides and architrave detailing often come from different parties, and each party then assumes someone else owns the interface. Before ordering, we ask the team to name, in one document, who supplies and who installs each of these:

ElementTypical question to settle before order
Door leaves and facesSize, finish, edge detail, and whether both sides match different room schemes
Pocket / wall build-upFormed by the builder or supplied with the door package; depth available versus depth needed
Track, runners and guidesLoad rating for the leaf size, floor-mounted or ceiling-mounted, access for servicing
Floor finishes at the thresholdLevel change, inlay channel, and who protects the track during the remaining works
Ironmongery and handlesRecessed pull or handleless detail, lock preparation, door stops

If a project needs a handleless or concealed detail, that decision changes the leaf preparation and must be in the order, not raised at installation. Where that detail is decided early, teams usually compare our Santerson Handleless Concealed Doors and Santerson Wooden Sliding Doors against the flush sliding option, depending on whether a visible edge is acceptable in the scheme.

Order as one door schedule, not as separate line items

Sliding doors rarely appear alone on a project. A villa or apartment package usually mixes hinged, sliding, pocket and concealed types across the same floor levels, and each type has a different interface with the builder. Issuing them as one door schedule — every opening listed with its type, size, finish, hardware and hand of opening — lets us check consistency across the whole set before anything enters production. It also gives the site team a single document to work from when they prepare openings.

Where the package spans several product families, the Windows and Doors category is the right place to build that schedule rather than ordering item by item. For buyers who need doors produced alongside cabinetry, wardrobes and wall finishes under one contract, our project procurement service covers specification, production coordination and delivery as a single scope.

Delivery sequence is a risk in itself

Made-to-measure doors arriving before the wall is ready get stored badly and damaged; doors arriving after the finishes are laid get forced into openings that no longer match. For projects shipped internationally, we sequence door delivery against the site programme rather than the purchase order date, and confirm the receiving party, unpacking arrangements and storage on site at the point of order. Our logistics service covers sea, air and rail freight, customs paperwork and door-to-door delivery; the detail is on our logistics page.

Installation and snagging should be planned in the same programme window as the order, not left to the end of the job. Sliding doors need adjusting after the floor and wall finishes are complete, so allow time for a second visit rather than assuming one fitting pass is enough.

Before you place the order: re-measure the structural opening on site; confirm finished floor levels both sides; fix the finish against a physical sample; name the supplier and installer for pocket, track and ironmongery in writing; and issue doors as one schedule rather than separate line items.

Send us the drawings and we will flag the gaps

If your team is specifying flush sliding doors for a villa, apartment or hospitality project, send the door schedule together with the wall sections and floor levels. We will come back with the openings that are not yet buildable, the interfaces nobody has claimed, and the finish decisions still open — before those become variations on site. That review is part of our design and specification stage, and it is where most of the risk in a made-to-measure door order gets removed.