A freestanding TV cabinet looks like a simple line item on a furniture schedule until it arrives on site with the wrong depth, a finish that does not match the joinery package, or a back panel that will not clear the services behind it. When procurement teams specify Santerson Freestanding TV Cabinets, the unit is made to measure for the project rather than picked from a fixed catalogue size, so the documentation they produce during enquiry and approval is what determines whether the delivered piece fits. The checklist below covers the items worth recording in writing before an order is released.

Why the paper trail matters more on made-to-measure units

Santerson's TV cabinets and media units sit inside a built-in furniture range where sizing, material, finish and layout are specified per project. That flexibility is the commercial advantage and the procurement risk at the same time. A stock item can be returned; a cabinet cut to a room's dimensions cannot. The specification record becomes the reference point for every downstream decision — quotation comparison, production approval, delivery inspection and handover sign-off — and it protects the buyer when a consultant changes their mind late in the programme.

For residential living projects and villa fit-outs handled through turnkey project delivery, the TV wall or media unit usually sits next to cabinetry, wall panelling and flooring from the same supplier. Recording the cabinet specification in the same format as the rest of the joinery package makes it far easier to keep finishes, edge profiles and hardware consistent across rooms.

The dimensions that actually need writing down

"Width 2400 mm" is not a specification. Procurement teams should capture the following, ideally on a marked-up drawing rather than in an email body:

  • Overall envelope: width, height and depth of the completed unit, including any plinth, shadow gap or overhanging top.
  • Clearance behind the unit: the distance between the finished wall face and the back of the cabinet, allowing for socket boxes, conduit, and the arm of the TV mount if the screen is to sit close to the panel.
  • Screen envelope: the display size or the external width and height of the chosen screen, plus whether it will be wall-mounted on the structure behind or fixed into the cabinet carcass.
  • Cable routing: position and diameter of pass-throughs, and who is responsible for the trunking behind the unit.
  • Floor finish build-up: the finished floor level. A freestanding unit ordered against a structural slab height will sit short once the flooring is laid.
  • Room access route: door widths, lift dimensions and stair turns on the delivery path, since an oversized carcass may need to be delivered in sections.
Record dimensions against finished surfaces, not structural ones. Most disputes over made-to-measure cabinetry trace back to a measurement taken before plasterboard, flooring or panelling was installed.

Materials, finishes and the matching problem

Santerson's product pages list material and finish options as project-specific choices rather than fixed variants, so the specification should name what has been selected and how it will be verified. A practical approach is to log:

ItemWhat to recordWhy it matters
Carcass substrateBoard type and grade specified for the projectGoverns load-bearing for wall-mounted screens and fixings for drawers
Door and panel finishFinish family, colour reference and sheen levelNames such as matte, lacquer or veneer are not enough on their own across suppliers
Edge and profile detailEdge banding or solid-edge treatment, door profileDetermines whether the unit reads as part of the joinery package or as loose furniture
Glass or display elementsGlass type, tint and framing where usedAffects hardware selection and safe handling on site
HardwareHinge and runner type, soft-close specification, handle or handleless detailHardware substitutions are a common value-engineering change and should be approved in writing
SamplesSample reference, dispatch date and who signed it offA signed physical sample settles colour and texture arguments that photographs cannot

Where the cabinet must match wardrobes, sideboards or kitchen cabinetry in the same building, order a single finish sample set covering all of those elements at once. Comparing one supplier's veneer against another's under site lighting is where colour mismatches get approved by accident.

Configuration and layout decisions to freeze before production

Layout is listed as tailored to the project, which means the internal arrangement is a decision the buyer owns. Document the split between open shelving and closed storage, drawer positions, whether equipment sits behind doors or on display, and how remote control and ventilation requirements are met inside a closed compartment. Decisions made after production starts typically carry both a cost and a schedule impact, so the approval record should show who signed off the layout and when.

  • Number and spacing of open niches, and whether shelving is fixed or adjustable.
  • Which components are stored behind doors, and how they will be ventilated.
  • Whether lighting is integrated into the unit and where the driver is accessible for maintenance.
  • Load assumptions for anything placed on top of the cabinet.

Commercial terms worth pinning down in the enquiry

Because these cabinets are produced under a custom and OEM service, minimum order quantities, prototyping scope and branding options are negotiable rather than fixed. The enquiry should state the quantity across all rooms or units in the project, whether a prototype or first article is required before full production, and which trade or brand markings apply. Santerson's service pages describe flexible minimum order quantities and brand customisation including engraving and packaging; treat those as options to confirm for your specific order rather than as standing terms.

For international orders, the logistics and door-to-door delivery arrangements belong in the same file as the product specification: Incoterms, packaging standard, container loading plan, and who prepares customs documentation such as commercial invoices, packing lists and certificates of origin. Confirm transit time, duty liability and the delivery endpoint for each project individually; published service descriptions are not a substitute for a written quotation.

Site conditions, installation and handover records

The supplier's after-sales material covers on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance. Procurement should mirror that with its own site record: which wall can carry the screen load, whether a tradesperson has confirmed the setting-out on site, and what the snag list says at handover. Warranty terms, response times and exclusions vary by project and region, so ask for them in writing and file them with the specification rather than relying on website copy.

A practical handover pack for each unit contains the approved drawing, the signed finish sample reference, the hardware schedule, the delivery note with packing condition noted, and dated photographs of the installed unit before the snag walk. That pack is what makes a later spare part or replacement request quick instead of reopening the whole specification.

A short documentation checklist

StageDocument to produce
EnquiryRoom schedule with quantities, marked-up dimensions against finished surfaces, screen and equipment list
SpecificationSubstrate, finish references, edge detail, hardware schedule, integrated lighting note
ApprovalSigned sample set, approved shop drawing with named approver and date
CommercialQuotation comparison, MOQ and prototype terms, Incoterms and delivery endpoint, written warranty terms
DeliveryPacking condition report, room-by-room delivery allocation, access route confirmation
HandoverSetting-out confirmation, snag list, dated photographs, spare parts contact

None of these documents is difficult to produce. What matters is that they exist before production starts, when changing a dimension is free, rather than after the cabinet has been cut. Teams that treat the freestanding TV cabinet as part of the joinery package — not as a piece of loose furniture bought late — consistently get a better result on site.

Santerson is a China-based furniture and building materials manufacturer supplying project customers since 2008, with villa and hospitality projects including references in Sydney, Melbourne, Perth and Willoughby. Send your room schedule, dimensions and finish references to the project team, and they will confirm sizing, material options and configuration for each unit.