Cabinetry is rarely the item that delays a project on its first day. It delays it in week six, when a container arrives with the wrong crating sequence, or when the tiling and electrical rough-in have already moved away from the drawings the cabinets were measured against. A made-to-measure run such as Santerson Shaker Style PVC Cabinets is configurable in size, material and finish for each project, which is exactly why the delivery and installation plan needs as much attention as the door profile itself. This article sets out how buyers, contractors and site teams can sequence production, freight and on-site work so that a shaker-profile PVC cabinet package lands on site ready to install.

Scope note: every dimension, material option and finish described below is confirmed per order against the approved drawings. Nothing in this article should be read as a standard specification, a fixed lead time or a guaranteed service level for your project.

Why configurable cabinetry needs an earlier coordination date

Stock cabinets can be swapped. Configurable cabinets cannot. Because Santerson Shaker Style PVC Cabinets are produced to project-specific dimensions with a layout tailored to the room, the site conditions recorded at survey become the manufacturing record. If wall set-out, floor levels or service positions change after that record is frozen, the correction is not a substitution but a new production order.

Two practical consequences follow:

  • The survey and drawing sign-off, not the purchase order, is the real start of your lead time. Treat it as a hard project milestone with a named owner.
  • Any design change after sign-off should be routed through the supplier in writing before the site team acts on it, so the production record and the site reality stay aligned.

The same logic applies across the rest of the fit-out. Kitchen cabinetry sits at the junction of plumbing, electrical, tiling, stone benchtops and flooring, so a cabinet package that arrives out of sequence blocks several trades at once rather than one.

Step 1: Fix the survey baseline before production starts

For each kitchen, pantry, laundry or wet bar in the package, confirm the following on site rather than from architectural plans alone:

  • Finished floor levels and finished wall faces, including where tiling or plasterboard will build up the surface.
  • Positions of water inlets, waste outlets, gas points and the flue or ventilation route for cooking appliances.
  • Electrical outlet, switch and appliance connection positions, plus where any integrated lighting or transformer access is required.
  • Ceiling height, bulkhead positions and the depth available above wall units.
  • Clearance for door swing and drawer pull-out once handles, appliances and adjacent cabinetry are accounted for.

Record these as marked-up drawings with dates and revisions. Where a shaker-profile run continues into adjoining joinery — tall pantries, a butler's pantry, laundry units or matching wall panelling — survey those areas in the same visit so one coordinate system covers the whole package.

Step 2: Lock the specification sheet, not just the door sample

A door sample settles the look. It does not settle what arrives. Before production release, ask for a single consolidated specification sheet covering:

Item to confirmWhy it matters on site
Carcase, door and panel material and finish for every unit typeMixed zones in one kitchen — near the sink, next to the oven, in a utility area — may call for different board or finish choices. Confirm what is specified where.
Unit-by-unit dimensions with wall and floor datums statedTells the installer which face is which and where shimming is expected.
Hinge, slide, handle and hardware scheduleAvoids a second shipment of ironmongery when site-supplied items do not match the pre-drilled configuration.
Appliance schedule with cut-out dimensionsOvens, dishwashers, fridges and integrated panels must be locked before cut-outs are machined.
Benchtop interface and upstand detailDetermines whether the stone fabricator works from the cabinet drawings or from a site template after installation.
Finish sample approval for every colour and texture in the packageTwo-tone and wood-effect schemes are common; approving one tone only invites disputes at handover.
Named contact for shop-drawing queries and for site queriesOne query channel per project prevents conflicting instructions reaching the factory and the installer.

If the design is still open, interior design and project coordination services cover space planning, furniture layouts and 3D renderings, plus drawing and production coordination with on-site guidance — useful when a client is still choosing between layouts at the point the cabinet survey would normally happen.

Step 3: Build the shipping plan around the installation sequence

Cabinetry that arrives complete but in the wrong order can still sit in a corridor for three weeks. Plan freight by working sequence, not by purchase date.

  • Sequence the load. Ask for crates to be labelled by zone and unit group — island, wall run, tall bank, pantry, laundry — so the first crate opened is the first unit installed. A crating list keyed to the shop drawings is worth more than a total piece count.
  • Split what the site cannot store. Where on-site storage is limited, staged shipments by zone keep the working area clear and reduce damage risk.
  • Confirm delivery terms in writing. Freight by sea, air or rail, customs documentation, packaging and container loading, shipment tracking and door-to-door delivery are all part of logistics and door-to-door delivery. Incoterms, duties, insurance and the delivery point still need confirming case by case for your destination, along with who provides unloading equipment and who signs for the consignment.
  • Book the receiving window against site readiness. A delivery date is only useful if the room is watertight, services are roughed in and floor levels are complete on that date. Work backwards from site readiness, not forwards from the factory schedule.

For multi-apartment or repeat-unit work, confirm early whether identical units ship together or per building phase, since a single consolidated delivery is only an advantage if every unit it serves is ready to receive them.

Step 4: Define the site readiness checklist before the container arrives

Send this checklist to the main contractor and ask for written confirmation, ideally one week before delivery:

  • Wet trades complete in the room — plastering, tiling, waterproofing, paint underspray.
  • Finished floor levels laid and protected, with no further settlement work planned.
  • Services first fix complete and tested, with positions matching the approved cabinet drawings.
  • A clear, dry, lockable storage area sized for the crated volume on that delivery.
  • Access route confirmed: lift dimensions, stair widths, gate heights and any floor-protection requirements.
  • Installer dates confirmed, with the trades that follow — stone, splashback, appliance connection — already booked behind them.

Where the supplier provides installation and after-sales support, agree in advance which scope is covered by the delivery team and which by local labour. Typical split points are carcase levelling and fixing, door alignment, hardware fitting, and appliance connection — the last of which normally needs a licensed local tradesperson.

Step 5: Run installation in one pass with a snag record

A practical sequence for a shaker-profile PVC cabinet package:

  • Day 0 — inspect on receipt. Check crates for damage before signing, open and photograph anything compromised, and reconcile the crating list against the shop drawings while the packaging is still available.
  • Dry layout. Set out base units along each wall run without fixing, checking levels, returns and clearances against the drawings.
  • Base units, then wall units, then tall bank. Fix and level in that order so vertical runs reference settled horizontals.
  • Doors, drawers and hardware last. Fit and align doors after the carcases are fixed and loaded, since alignment tolerances shift once the run is under load.
  • Benchtop interface. Confirm whether templates were taken before or after fixing, and check scribe and upstand details against the approved detail.
  • Snag walk with the site supervisor. Record items on a dated list with photographs, assign each to a party, and agree how replacements or adjustments are raised.

Keep that snag record. It is the document that supports warranty claims, spare-part requests and any replacement panel order later, and it protects both parties when a defect turns out to be site damage rather than a manufacturing issue.

Common failure points and how to close them

Failure pointClosure action before production release
Site levels differ from the survey by enough to require scribingRe-survey immediately and confirm in writing which units need resizing; do not let installers cut carcases on site without notifying production.
Appliance model substituted after machiningFreeze the appliance schedule at drawing sign-off; treat any substitution as a change order with a written revision number.
Finish tone disputed at handoverKeep signed, dated physical samples for every colour and texture in the package on site and in the supplier file.
Hardware supplied locally does not match pre-drilled holesState explicitly in the order which ironmongery is supplier-supplied and which is site-supplied.
Delivery lands before the room is sealedTie the delivery release to a written site-readiness confirmation, and stage shipments if readiness differs by zone.

A coordination timeline you can hand to the site team

MilestoneOwnerEvidence that it is complete
Site survey and dimensional sign-offBuyer / contractor with supplierDated marked-up drawings with revisions recorded
Specification sheet and finish approvalsBuyer / designerSigned sample record and consolidated spec sheet
Production releaseSupplierWritten confirmation of released drawings and revision number
Freight booking, crating list and delivery windowSupplier logistics coordinatorZone-labelled crating list keyed to shop drawings
Site readiness confirmationMain contractorWritten checklist sign-off one week before delivery
Receipt inspection and installationInstaller / site supervisorDamaged-goods note at receipt, dated snag list at completion

If the cabinetry is one part of a wider package — flooring, wall panelling, doors, bathroom fixtures and lighting ordered from the same one-stop furniture and building materials supplier — apply this timeline once per trade group rather than once for the whole project. A single delivery date for everything is the fastest way to guarantee that nothing can be installed.

Frequently asked questions

When should the cabinet survey happen relative to other trades?

After wall faces and finished floor levels are established and after services positions are fixed, but before tiling finishes and benchtop templating. If your project uses made-to-measure joinery throughout, one survey covering cabinetry, wardrobes and panelling keeps a single set of datums across all three.

Can this shaker-profile cabinet run be repeated across several apartments or villas in one project?

Yes, provided each location is surveyed separately. Repeat-unit layouts usually share a door profile and finish schedule while differing in carcase widths, ceiling heights and service positions, so the specification sheet should list unit-by-unit dimensions per location rather than one generic module. Confirm with the supplier whether identical units ship together or per building phase — consolidation only helps if every receiving unit is ready.

Who handles installation on an overseas project?

Installation and after-sales support are offered as part of the service scope, but which elements are covered by the supplier's team and which by local labour must be agreed per project, along with warranty terms and response arrangements. Confirm these in writing before the delivery date is fixed.

What should we do if a design change arrives after production release?

Issue a written change order referencing the drawing revision number, and ask for confirmation of what can still be changed and what requires a new unit. Do not let site teams modify machined carcases to fit without that confirmation, since it usually voids the basis for a replacement.

Send your marked-up drawings, appliance schedule and target delivery window with an enquiry, and ask for a specification sheet and crating plan before production release. That single exchange is what turns a configurable cabinet package into a predictable site programme. Details of the range are on the custom kitchen cabinets pages, and project enquiries can be raised through the contact page.