A wardrobe enquiry becomes far easier to price when the supplier receives the same information twice: what the space actually measures, and what you expect the doors to do day after day. Below is the practical list we ask our own project team to complete before an enquiry about wooden sliding door wardrobes goes out — useful whether you are fitting one bedroom or furnishing a whole villa.

Start with the room, not the door

Sliding doors travel on a track, so the two numbers that decide everything are the clear opening width and the depth available for the door stack. Measure the finished opening after plaster, skirting and flooring are in place, and note anything that intrudes into that space: a radiator, a light switch, a downstand beam, or a cornice you intend to keep. A single photograph of each wall, taken straight on rather than at an angle, answers more questions than a written description.

Then record the room's constraints in plain language. Is the ceiling level? Is the floor tiled, engineered board or carpet, and can a bottom track sit on it? Where does the bed swing, and how much standing room is left in front of the wardrobe? Slab doors need clear space to slide; if the walkway is tight, tell the supplier early, because that detail changes the layout before any price is discussed.

Decide what goes inside before you talk about the fronts

Door fronts are the visible part, but internal layout drives cost and usability. Before an enquiry, list how you actually store things:

  • Hanging lengths — long space for dresses and coats, double short rails for shirts and folded trousers.
  • Shelves — how many, and at what heights; adjustable shelving is easier to live with than fixed.
  • Drawers and hampers — pull-out drawers deep in a wardrobe are only worth having if the sliding track allows full access.
  • Lights — an interior light needs a power feed decided before the carcass is built, not after installation.

A rough sketch of the inside, even hand drawn, lets a custom furniture manufacturer quote against your layout instead of guessing at a standard configuration.

Choose finish and material direction in advance

You do not need to name a board or a lacquer before the first conversation, but you should know the direction. Warm wood tones, matte painted surfaces, high gloss, mirrored panels and two-tone combinations all behave differently in a bedroom: gloss reflects light and shows fingerprints, matte reads softer but can scuff at the edges, mirror visually enlarges a narrow room yet limits how the door can be detailed. Send the supplier two or three reference images of rooms you like, plus any finish already fixed in the property — flooring, doors, kitchen fronts — so the wardrobe is matched rather than invented.

For an existing joinery scheme, note the exact item names from your drawings. If a product title and its specification block use different wording for the same door, quote both and ask the supplier to confirm which one they are producing; that single question prevents most finish disputes later.

What a supplier needs to price the job

Item to prepareWhy it matters
Finished opening width, height and available depth for each wardrobeSets panel count, track length and whether the doors can fully clear the opening.
Floor and ceiling condition, plus track preference (top-hung or bottom-rolling)Determines hardware choice and whether a threshold will sit in the doorway.
Internal layout sketch with hanging, shelving and drawer countsTurns a vague estimate into an itemised quotation you can compare between suppliers.
Finish references and matching samples or codesAvoids a colour approved on screen that does not match the room on site.
Delivery address, access route and floor levelSlab doors travel long; stairwells, lifts and turning radii decide packaging and handling.
Required site date and who installsMade-to-measure work is scheduled backwards from your on-site date, not forwards from the order.

Questions worth asking in the first reply

  • Which dimensions are confirmed by you and which are confirmed by the supplier after checking the drawings?
  • What hardware is specified for the track, and what happens if a panel goes out of alignment after months of use?
  • How are edges and handles detailed, and can a sample door corner be sent before production?
  • What is included in the price — doors only, or carcass, track, plinth and internal fittings?
  • Who inspects on site at handover, and how are snags recorded and closed out?

These are not small-print questions. A wardrobe ordered from a single measurement sheet, with no confirmation round, is where most avoidable cost appears — usually as a re-made panel rather than a discount.

A note on specifications: made-to-measure wardrobes are quoted per project. Treat any figure you read online as indicative until your dimensions, layout and finish are written down and confirmed in the quotation.

If the wardrobe is part of a wider fit-out

Where bedroom storage sits alongside other built-in work — kitchen cabinets, media walls, wooden sliding panels used to close off a study or dressing area — it is worth sending one enquiry covering the whole package. Matching board, veneer and lacquer batches come from one production run, and a single coordination round on drawings is cheaper than three separate ones. SANTERSON works this way on villa and hospitality projects: design consultation and space planning, material selection and product specification, manufacturing with quality control, then project management and site coordination through to installation and handover.

Ready to send an enquiry? Gather the opening dimensions, your internal layout sketch and two or three finish references. That is enough for a supplier to move from "roughly" to a written, itemised specification — and it is the difference between a wardrobe that fits on the drawing and one that fits on site.