A media wall looks simple on a drawing until the first site visit raises questions about screen size, wiring routes, storage use and who fixes what to what. The answers decide the panel layout, not the other way round. Below is the information we ask project teams for before we quote Santerson Integrated TV Panels, and what each detail changes on site.
Start with the room, not the product
Integrated TV panels belong to our Media & TV Walls collection and are made to measure for one specific wall in one specific space. That means the first details we need are spatial rather than cosmetic:
- Wall dimensions and floor-to-ceiling height. Panel widths, module joints and whether the system stops at a dado or runs full height all follow from the measured wall.
- Substrate and fixing condition. Stud partition, masonry or an existing finished wall each need a different support detail. We confirm this before production because it affects the batten layout hidden behind the panels.
- Viewing distance and seating arrangement. This sets how high the screen centre can sit and how much open or closed storage can share the same wall without crowding the sightline.
- Circulation past the wall. In a villa living room or a hotel lounge, pass-by width decides whether doors, sliding panels or deep shelving can be part of the composition.
Screen and equipment details set the openings
The panel is built around the hardware, so we ask for the equipment schedule early:
| Detail to confirm | What it determines |
|---|---|
| Screen size and whether it is wall-mounted or recessed | Opening position, panel support zone and how much of the screen sits proud of the finished face |
| Bracket type and load rating | Reinforcement behind the panels and fixing points |
| Soundbar or in-wall speakers | Niche size, ventilation gaps and speaker back-box positions |
| Set-top boxes, consoles, media players | Number of equipment niches, shelf depths and access for cabling |
| Power, data and aerial outlets | Conduit routes behind the wall and cut-out locations on finished panels |
| Remote-control operation | Whether equipment stays in open niches or needs vented closed compartments |
Send this schedule before we finalise drawings. Relocating a power outlet once the panels have been machined means re-making the affected modules, so it is worth resolving on paper first.
How the wall will actually be used
Storage requirements shape the elevation as much as the screen does. Tell us how the room is used, and we match it to the right configuration:
- Daily living with children or guests: closed compartments hide clutter, while open niches stay reserved for a few items rather than everything.
- Display-led rooms: Santerson Open Display Niches and glass-front units show objects, but they need cleaning access and considered lighting.
- Concealment required: where the screen should disappear when off, Santerson Sliding Panel TV Systems keep the wall reading as joinery.
- Ambient lighting wanted: our Integrated LED Media Units and Backlit Feature Walls carry lighting inside the build-up, so drivers and dimming need to be agreed with the electrical contractor.
- Full-height composition: for walls that continue into storage, Santerson Full Height Media Walls keep one consistent module grid across the whole elevation.
Finish, sizing and coordination with adjacent work
Panels are specified by finish and dimension, and both have to agree with neighbouring trades:
- Material and finish family. Veneer, lacquer, textured and stone-look surfaces are offered across our Paneling Systems, so a media wall can carry the same surface as surrounding wall panelling. Confirm the exact material and finish selection for your project.
- Floor and ceiling levels. Floor build-up thickness and ceiling set-down change panel heights. Confirm final levels, not structural ones.
- Skirting, cornices and reveals. Decide whether the media wall runs through them or stops short; this reads clearly in photographs.
- Adjacent openings. Concealed doors and windows sharing the wall need their swing and track lines resolved on the same drawing.
Delivery, installation and responsibility split
For projects outside China these details also affect logistics. We work as a one-stop furniture and building materials supplier, so panels travel with the rest of the joinery, cabinetry and loose furniture on one production schedule, with door-to-door delivery arranged by our team. Before we book production we still need:
- Approved shop drawings signed against final site dimensions;
- The electrical first-fix layout, marked on the same wall elevations;
- A named site contact for dimension verification and handover;
- Confirmation of who fixes the substrate and battens, and who installs the finished panels.
What we need from you to quote: wall elevation with final dimensions, screen and equipment schedule, storage preference (open, closed or mixed), finish reference, and destination for delivery. Santerson has supplied furniture and building materials for villa, hospitality and office projects since 2008; send the drawings and our project team will confirm the configuration and technical details for your wall.