A partition sliding system looks simple on a drawing: two or three panels, a track, and a wall that can open or close on demand. In practice it is one of the few built-in elements where joinery, structure, hardware and site access all have to agree before anything is cut. The checklist below covers what we ask project teams to settle before an approval is signed, so that shop drawings, procurement and installation stay aligned.
Start With the Job the Panels Have to Do
Before anyone discusses finishes, agree on what the partition is being asked to achieve, because each requirement changes the build in a different way. A screen that only needs to define two zones in an open-plan villa is a light-duty job. A panel that closes a meeting room off from a lobby has to overlap, seal and take daily handling. A panel beside a corridor also has to survive trolleys, luggage and cleaning crews.
Write the requirement down in plain language and attach it to the enquiry. "Divide the lounge for evening events" or "close the study off as a fourth bedroom" tells the factory far more than a dimension alone, and it is the sentence that later justifies the hardware choice.
Confirm the Opening and Its Structure
Sliding panels hang from something, and that single fact causes most of the rework we see on site. Treat these as conditions of approval rather than details to resolve later:
- Floor-to-floor height and finished floor levels. Give the structural slab height and the finished level on both sides of the opening. Panel heights are cut to the millimetre, and a 20 mm difference in screed or flooring on one side changes every leaf.
- What is above the track. Confirm whether the head rail fixes to a structural slab, a steel beam, or a framed bulkhead. If it is a bulkhead, its internal framing and board type need to be shown on the drawing, since the load of the panels and the operating force both travel through that point.
- Panel stack and parking position. Decide where the leaves sit when open. A stack that disappears into a pocket needs a recess; a stack that folds against a wall needs clear floor space and protection for the finish.
- Travel path over the finished floor. Confirm what the panels will pass over — engineered boards, tile, stone, carpet — and where the threshold or guide sits. This affects both the track height and cleaning access later on.
- Services in the way. Sprinkler heads, light recesses, air grilles, curtain boxes and door closers near the opening should be located on the drawing before panel heights are fixed.
Choose the Collection the Job Points To
Our Santerson Partition Sliding Systems sit within the Sliding Panel Systems collection, alongside acoustic, glass, textured and wooden versions of the same idea. Each is configurable — made-to-measure sizing, material and finish options, layout drawn to the space — so what separates one from another is the job you need the panel to do:
| Collection | Where it earns its place | What to pin down before approval |
|---|---|---|
| Partition Sliding Systems | Room division in villas, apartments and hospitality suites where the wall needs to open and close regularly. | Track type, hardware, opening dimensions and how each leaf locates when closed. |
| Acoustic Sliding Panels | Spaces where the panel has to perform as a barrier, not just a visual screen. | The acoustic performance required for the chosen configuration, confirmed against the build-up specified — not assumed from the product name. |
| Glass Sliding Panels | Lobbies, studies and internal views where daylight through the partition matters. | Glass type and safety requirements for the location, including any impact or fall-risk exposure. |
| Textured Sliding Panels / Wooden Sliding Panels | Partitions that read as part of the wall finish when closed. | How the texture or grain runs across multiple leaves, and how the panel meets adjacent textured panelling. |
| Closet Sliding Panels | Storage fronts and built-in joinery rather than room division. | Carcass dimensions and hardware, since the panel carries the storage layout as well as the opening. |
Where a partition also has to conceal something — a media wall, a study doorway, a service run — design that together from the start. Our Sliding Panel TV Systems and Integrated Door & Paneling work the same way, and teams who put them in one enquiry avoid two trades arguing over a reveal.
Match Materials and Finishes to the Rest of the Package
A partition rarely fails on its own — it fails where it meets something else. Before approval, place the panel finish beside the finishes it will actually sit against: stone and marble panels, veneered joinery, engineered flooring, painted plaster. Match the grain direction, the sheen level and the metal tone on the track and handles to the door furniture nearby.
This is where a single supplier earns its keep. Because we act as both the furniture and building materials manufacturer and the coordinator for the rest of the fit-out, the partition, the panelling it disappears into, the joinery beside it and the screens nearby can be specified from one material schedule. That matters most on hospitality and villa packages, where interior fixtures such as vanities, wardrobes and kitchen cabinetry are ordered alongside the wall systems — one board decision repeats across dozens of rooms.
Agree the Operating Hardware, Not Just the Panel Face
Hardware is where value engineering tends to go wrong quietly. Specify and record:
- Track and hanger type, and whether it is surface-mounted or recessed into a bulkhead.
- Weight per leaf, since the panel build-up drives the load, and the load drives the hangers and the supporting framing.
- Leaf count and stacking order, including which leaf leads and whether leaves nest or overlap.
- Handles, recessed pulls and locking, and which side each sits on — a partition with no lock in a hotel suite becomes a snag within a week of handover.
- Sealing and edge detail where the panel meets floor, wall and head, especially on acoustic jobs.
- Expected use, which sets hardware quality. A partition opened twice a year at an event is not specified like one moved daily by staff.
Settle the Survey, Drawings and Approval Sequence
Our interior design and project coordination service runs in three steps — brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up. For a sliding partition the middle step carries most of the risk, and four documents need sign-off before production starts:
- A site survey of the actual opening, taken once the floor finishes are in or definitively scheduled, not from architectural dimensions alone.
- Shop drawings showing plan stacking, elevations open and closed, head and floor details, and the fixing substrate.
- A finish schedule naming board, veneer, laminate, glass type, metal finish and hardware model.
- An interface drawing recording who supplies the bulkhead, the flooring threshold, the architrave and any electrical work inside the panels.
Set the Delivery Route and the Install Window
Tall panels are awkward cargo, so check access before releasing for production:
- Panel dimensions against access — lift car size, stair turns, corridor widths and the final route to the room. A leaf that will not fit in the lift becomes a site-assembled panel or a re-made one.
- Packaging and container loading, with panels protected edge-to-edge and clearly marked by opening and stacking order.
- Delivery sequence, so partitions arrive after wet trades and floor finishes are complete, but before loose furniture blocks the route.
- Install responsibility — whether our team fits on site or your contractor does, and who signs off the track alignment afterwards.
- Snag and handover process, including adjustment of hangers after the building has settled and the panels have been used for a few weeks.
We handle freight forwarding, customs paperwork and door-to-door delivery as part of the package, but import terms, duties and transit arrangements are confirmed project by project rather than quoted from a standard rate card.
Close Out With Warranty, Spares and Care
Before final sign-off, get three answers in writing: what the warranty covers for panels and for hardware separately, which spare parts are held for the track and hangers, and how the finish should be cleaned. Tracks collect grit, so a maintenance note handed to the facilities team at handover prevents most early complaints.
A Short Pre-Approval List
- The function of the partition written in one sentence, agreed by designer and client.
- Floor-to-floor heights and finished levels on both sides of the opening.
- Fixing substrate above the track, drawn and confirmed.
- Stacking position and clear floor space when open.
- Collection chosen for the job — partition, acoustic, glass, textured, wooden or closet.
- Acoustic or safety requirements stated as project values, not product names.
- Finish schedule matched to adjacent panelling, joinery and flooring.
- Hardware specified by load, leaf count and expected use.
- Interface responsibilities named: bulkhead, threshold, architrave, electrical.
- Delivery route verified against lift and corridor access.
- Install window placed after wet trades and floor finishes.
- Warranty, spares and cleaning instructions agreed before handover.
Send us the opening before you approve it. Share the drawing, the floor-to-floor heights and one sentence on what the partition must do, and we will come back with a configuration, a hardware schedule and a made-to-measure proposal — whether the package is a single villa wall or a full hospitality fit-out.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
SANTERSON has manufactured furniture and building materials since 2008, with offices in Foshan (China), Vietnam, Singapore and Johannesburg. Specifications for configurable systems are confirmed project by project: acoustic performance, glass safety classification and hardware duty are agreed per configuration.