A paneled solid wood wardrobe looks simple on a mood board and complicated on a site. The panel profile has to read correctly at close range, the carcass has to fit a wall that is rarely square, and the doors have to work with the ceiling line, the skirting and the lighting plan. If you send an enquiry that says only "classic paneled solid wood wardrobe, 3 metres", the reply you get will be a guess. This guide sets out what to gather before you contact SANTERSON as a China furniture and building materials manufacturer, so the first exchange moves into specification instead of starting from zero.
Start With the Room Record, Not the Wardrobe Picture
Before any product discussion, fix the condition of the wall the unit is going against. Paneled doors are the most unforgiving element in a built-in wardrobe: when a wall is out of plumb, the shadow gaps between door and frame change from one end of the run to the other, and no amount of hardware adjustment hides it.
Collect these items for each bedroom or dressing room:
- A dimensioned sketch of the wall: length at floor level, length at ceiling level, and height at both ends. Record them as measured, not as designed.
- Floor and ceiling finish build-up — which floor covering is being laid, what thickness, whether a cornice or shadow gap is planned at the top.
- Position of sockets, switches, lights, air-conditioning grilles and radiators that fall inside or within 300 mm of the wardrobe zone.
- Door swing direction in the room, and how much clearance a hinged wardrobe door needs when it opens.
- Skirting and architrave details, because they decide whether the carcass sits flush or needs a scribe.
Send photographs from three angles plus one close-up of the corner conditions. A supplier working from this set of information can flag conflicts — a wardrobe door striking a bed side table, a handle clashing with a bedside light — before production rather than after delivery.
Decide What "Classic Paneled" Means for This Project
The phrase covers several genuinely different door constructions. In our Classic Paneled Solid Wood Wardrobes range, the door is a framed construction with a panel set inside it, and the same design language also appears in raised, recessed, arched and moulded variations. Each one changes cost, lead time and how the unit behaves over the years.
| Door detail | What to confirm before you ask for a price |
|---|---|
| Raised panel | Profile depth and width, whether the profile suits a traditional or transitional interior, and how the finish is applied over the moulded edges. |
| Recessed (shaker-style) panel | Flatness of the central panel, rail and stile widths, and whether the same profile is repeated on matching doors elsewhere in the property. |
| Arched panel | Radius of the arch, whether it repeats across all doors, and how the arch aligns with the room's other curves such as an arched doorway. |
| Decorative moulded panel | Pattern reference, pattern scale relative to door size, and the finish system over carved detail. |
Pick one reference image per bedroom and label it with what you want copied and what you do not. Two pictures that look similar to a client can mean different rail widths and different machinery time.
Specify the Timber and the Finish System, Not Just "Solid Wood"
"Solid wood" describes the door construction; it does not describe species, grade or how the surface is finished. Our Oak Solid Wood Wardrobes, Walnut Solid Wood Wardrobes and Cherry Solid Wood Wardrobes are separate lines because species, grain figure and stain behaviour differ, and a project that mixes them in one room needs a deliberate decision about contrast.
For each unit, state:
- Species and cut — flat-sawn or quarter-sawn grain, and whether figure is wanted.
- Colour reference — a paint or stain code with a brand name, or better, a physical sample you are willing to post. Screen colours do not survive translation between timber species.
- Sheen level — matte, satin or gloss on the same colour reads as a different product.
- Where the piece is going — a bedroom, a dressing room, a coastal villa or a hotel guest room. Humidity and use intensity change what we recommend for panel construction and finish.
If you are furnishing several villas or a hospitality floor from one order, say so at the outset. Matching stain colour across dozens of doors is a production-planning matter, not something to raise after the first batch has been sprayed.
Set the Interior Layout Before the Exterior Style
Exterior panel detail sells the wardrobe; interior layout decides whether the client keeps using it. Send a list of what actually has to live inside: hanging length for long garments, drawer count, shelf depths, a valet rod, space for an ironing board, lighting inside the carcass.
A useful habit is to mark each unit as one of three types:
- Hanging-led — mostly rails, minimal shelves. Best for guest rooms and short-stay units.
- Drawer-led — deep drawer stacks at reachable height. Best for master bedrooms and walk-in dressing rooms.
- Mixed — closed storage with open display niches. Best where the wardrobe is also part of the room's decoration.
Where a run turns a corner, say whether you want a corner carcass or two abutting units with a filler. Our Classic Wooden Hinged Wardrobes are made to measure with the layout tailored to the space, so corner conditions and scribing to an uneven wall are handled in fabrication rather than on site.
Confirm Door Operation and Clearances
Paneled solid wood doors are heavy, and hardware is a specification item rather than an accessory. Before the enquiry, decide:
- Hinged or sliding. Hinged needs swing clearance in front of the unit; sliding needs wall or track provision and loses no floor space.
- Handle style or integrated finger pull, and whether handles must align across a run of doors of different widths.
- Soft-close requirement on doors and drawers.
- Maximum practical door width for the chosen panel profile — wide doors with a deep raised profile need more than hinges to stay flat.
Where a room needs the same look continued onto other openings, tell us. A paneled wardrobe and shaker panel wardrobe doors can be repeated as paneled hinged wardrobe fronts, internal doors and wall panelling in one finish, but only if the joinery package is planned together.
Bring the Project Programme and Delivery Facts
Custom casework is built to order, so your schedule is part of the specification. Have these ready:
- Required on-site date for each unit, split by phase if the site takes delivery in stages.
- The Incoterm you want quoted — ex works, FOB or delivered to site — and the destination port or address.
- Whether your freight forwarder handles the main leg or you want ours arranged as part of logistics and door-to-door delivery.
- Storage available at site, because built-in wardrobes need a dry, secure place before installation.
- Who installs: your joiner, our on-site guidance team, or a split scope under installation and after-sales support.
Australian residential and hospitality work is a large part of what we do — published project pages include villas in Willoughby, North Turramurra, Perth, Sydney and Melbourne. That does not mean your project inherits those conditions: import terms, duties and installation arrangements are confirmed case by case, and we will tell you plainly what applies to your address and your programme.
Send One Package, Not Three Messages
What a complete first enquiry contains:
- Room drawings or measured sketches with floor and ceiling finish levels marked.
- One reference image per unit, annotated with what to copy and what to avoid.
- Species, colour reference, sheen level and any sample you can post.
- Interior layout list: rails, drawers, shelves, lighting, accessories.
- Door operation, hardware preference and required clearances.
- Quantities by unit type, required site dates, destination address and preferred Incoterm.
- Your role — developer, builder, designer or homeowner — since it changes what the quotation must itemise.
Send that package and the reply comes back with a real price, a build schedule and the specific points that still need your decision. Send a single sentence and you get a single number that neither of you can rely on.
What Happens After the First Enquiry
Under our custom and OEM service, a made-to-measure wardrobe order normally moves through brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up. For built-in wardrobes that sequence includes a shop drawing you sign off, a finish sample for approval where colour matters, and a packing list matched to room-by-room delivery.
If you are ordering wardrobes together with interior fixtures, kitchen cabinetry, doors or flooring from the same project, mention it in the first message. Combining joinery packages on one production plan is how colour and grain are kept consistent across a house, and it simplifies freight and site sequencing.
What to Have Ready on Your Side
A supplier can only move as fast as the decisions you can make. Before writing, settle internally: who signs off the shop drawing, which finish sample is approved, and what your latest practical site date is. If a designer or architect controls the detail, name them in the enquiry and copy them on drawings — a builder's sketch and the architect's door schedule disagreeing is a common cause of a rebuilt wardrobe.
If you are comparing us against other quotes, send the same package to each. Quotations for made-to-measure casework only line up when species, panel profile, hardware and delivery terms are identical; otherwise the cheapest number is usually the thinnest specification.
Frequently Asked Questions
Do you supply a single wardrobe, or only whole-house packages?
Both. A single made-to-measure unit for one bedroom and a full villa joinery package go through the same specification process; what changes is how production and freight are organised.
Can you match an existing wardrobe on site?
A close match is achievable from a physical sample of the door or a moulding rubbing. An exact match to an aged, factory-finished piece should be discussed honestly at quotation stage rather than promised.
What if my walls are not straight?
Send the measured dimensions as found. Scribing, fillers and a scribed top panel are normal parts of a paneled built-in detail, and we design for them in fabrication when we know the condition in advance.
Is solid wood necessary, or will a paneled door in another material look the same?
For painted paneled doors there are alternatives with different movement behaviour and price. Tell us the application and the budget, and we will say which construction suits it rather than defaulting to the most expensive option.
Prepare the room record, the door detail and the programme before you write, and the conversation about your classic paneled solid wood wardrobes starts where it should. Enquiries go through our contact page; tell us the project location and required site dates in the first message.