A quote for acoustic wall panelling arrives from three suppliers. All three look reasonable on paper, and all three will not solve the same noise problem. The difference usually sits in what the proposal does not say: which rooms it covers, how far the panel builder went to understand the space, and where responsibility for measurement, hardware and fixing ends. This guide walks through the checks we recommend before you accept a manufacturer’s written proposal for acoustic wall panels, using our own configurable range as the worked example so you can compare it line by line against any competitor’s document.

What a Complete Proposal Should Contain

Before comparing prices, check that the document answers basic questions. A proposal for Santerson Acoustic Panels is written as a project specification rather than a product datasheet, because these panels are made to measure: finish, layout and dimensions are set for each space. That structure tells you what to expect from any manufacturer working the same way.

SectionWhat it should stateWarning sign if missing
Scope by roomWhich walls and rooms are included, with dimensions taken from your drawings or site surveyA single total area figure with no room-by-room breakdown
Panel specificationCore and facing materials, surface finish, edge treatment, colour reference“Acoustic panel” named generically with no material detail
Fixing methodBattens, brackets, adhesive or track system, and who provides each partHardware listed as “to be confirmed on site”
Interface itemsHow panels meet skirting, architraves, switches, light points and servicesCut-outs and trims excluded without explanation
Access and handlingPackaging, panel sizes relative to lifts, doors and stair coresPanel dimensions larger than the access route described in your own drawings
Commercial termsCurrency, Incoterms, payment stages, what triggers each stageLump-sum price with no milestone definition

Read the Configuration Options Before You Read the Price

Configurable acoustic panels are quoted from a set of choices, and two proposals at the same price can sit on very different configurations. For our wall-mounted acoustic panels, the configuration covers made-to-measure sizing plus material and finish options, so ask the manufacturer to confirm each of the following in writing:

  • Panel size and modular layout. Ask for a setting-out drawing showing panel widths, joint positions and where cuts fall relative to doors and windows.
  • Core and facing materials. Ask which core is being quoted and which facing or fabric is applied over it; if the proposal names only a finish, request the build-up in order from wall to face.
  • Finish selection method. Confirm whether you select from a physical sample, a printed card or a screen reference, and who pays for samples to reach site.
  • Tolerance and level. Made-to-measure panels only work if the wall behind them is described. Ask what flatness the proposal assumes, and what happens if site conditions differ.

If a competitor’s proposal answers these four points and another one does not, you are no longer comparing like with like, whatever the totals suggest.

Check Acoustic Performance Against Your Actual Problem

“Acoustic” covers two different jobs: absorbing sound inside a room so it is less reverberant and speech is clearer, and blocking sound from passing through a wall or door into the next space. A panel can be strong at one and weak at the other. Before accepting any proposal, write down the problem in physical terms — the room, the source of the noise, the space it should not reach — and ask the manufacturer to state plainly which job the quoted build-up addresses.

For our configurable listings we do not publish laboratory figures as a substitute for project discussion. The product pages direct buyers to confirm acoustic performance for the selected configuration, because performance depends on the combination of core, facing, air gap and fixing detail rather than on the panel name alone. Treat a supplier who quotes a single impressive number for every wall in your building with the same suspicion as one who gives no numbers at all.

Ask for the performance claim to be tied to the exact build-up you are buying, including the fixing method. A figure measured on a loose sample in a test rig is not the same as the assembled wall on site, and the difference between those two descriptions is worth clarifying before order.

Sliding or Fixed: Confirm the Mechanism Separately

Where the acoustic treatment also needs to open — a media wall, a room divider, a study that closes off from a living area — the proposal should describe two systems, not one. Our Santerson Acoustic Sliding Panels are specified with made-to-measure sizing and material and finish choices, but the hardware is a separate confirmation: track type, hanger and roller specification, running heights, opening dimensions and the stoppers that hold the leaf in place.

A useful test for any sliding proposal is to ask who confirms the floor and head conditions. Sliding acoustic panels fail far more often at the supporting structure than at the panel itself: an unreinforced head fixing, a floor finish laid after the track was set out, or a threshold that was never drawn. If the manufacturer’s document does not mention these interfaces, raise them in writing and have the answer recorded as part of the accepted proposal.

Trace Responsibility From Measurement to Handover

Made-to-measure work is only as good as the chain that carries it from your drawings to the wall. The proposals worth signing name a single party for each step. Ours follows a documented sequence across design, production and site: space layout planning and product specification at the start, then manufacturing with quality control, project management and site coordination, and finally installation and handover. Ask any manufacturer for the equivalent list, and check that it covers:

  • Who measures. Shop drawings based on your architectural dimensions are not a survey. If nobody has checked the built dimensions, the risk sits with whoever signed off the numbers.
  • Who approves production. There should be one approval point where panel sizes, finishes and layout are frozen, and a stated consequence of changing them afterwards.
  • How goods travel and arrive. Ask about packaging, container loading, customs paperwork and the delivery address on the documents. Our furniture logistics and door-to-door delivery service is written into the same project scope as production, which removes one hand-off that commonly causes damage claims.
  • Who fixes on site. Whether panels are installed by your trades or supervised by ours, the proposal should state who inspects the substrate and who signs off snags. Our installation and after-sales support covers on-site installation, inspection and snags, spare parts and ongoing maintenance.

Compare Total Delivered Cost, Not Panel Price

Panel unit rates invite false comparisons. Build a simple column for each proposal that adds the items every project actually carries: samples and pre-production approval, packaging and freight to site, duties and clearance, storage on site, fixing materials, installation labour, snag rectification, and spares held back for future repairs. A slightly higher panel price with hardware and fixing included is usually cheaper than a low rate quoted bare, because the extras then get bought in small, urgent quantities.

For projects combining acoustic walls with other joinery — media units, closets, concealed doors — consolidating those items with one manufacturer reduces interface disputes. Panel systems can be specified alongside wall panel systems and the wider fit-out scope through our turnkey interior project solutions, so one party answers for the whole wall.

Five Questions to Send Before You Accept

  1. Which build-up, core and facing are you quoting for each room, and what acoustic job does that combination serve?
  2. Send the setting-out drawing with panel sizes, joint positions and cut-outs marked.
  3. What substrate flatness and moisture condition does your fixing method assume, and who confirms it on site?
  4. Which hardware is included for sliding leaves, and who sets out the track relative to floor finishes?
  5. List what is excluded: trims, thresholds, touch-up materials, spares, second visits.

Send the same five questions to every bidder. The shape of the answers tells you more than the totals do.

Frequently Asked Questions

  • Can acoustic panels be made to an existing wall drawing?

    Yes. Our acoustic panels are configured with made-to-measure sizing, so panel widths and heights follow the setting-out for that space. Confirm the built dimensions rather than design dimensions before production is released.

  • Do you supply sliding acoustic panels as well as fixed wall panels?

    Yes. Fixed wall treatment sits in our Paneling Systems range, and operable acoustic walls sit in the Sliding Panel Systems range. Track and hardware details are confirmed per project.

  • What finish options can I specify?

    Finish, layout and dimensions are specified for each space, and material and finish options are listed in the configuration. Request physical samples before freezing the selection.

  • How do I check whether a proposal matches my noise problem?

    Describe the room, the noise source and the space it should not reach, then ask the manufacturer to state which job the quoted build-up addresses. Confirm acoustic performance for the selected configuration rather than accepting a generic rating.

  • Can acoustic panelling be ordered with other joinery in one package?

    Yes. Panel systems can be specified together with cabinetry, doors and other interior fixtures under one project scope, which keeps measurement, production and handover with a single supplier.