A custom ceramic toilet fails on site for one of two reasons: the drawing never said what the plumbing actually is, or the order was placed without saying who owns the trapway, seat interface and spare-parts plan. This guide walks through the brief we need from buyers, architects and contractors so a made-to-order washdown one piece toilet arrives matching the room it is going into.
SANTERSON has manufactured furniture and building materials in China since 2008, supplying project orders across hospitality, villa and commercial work. Sanitary ware sits inside that scope alongside bathroom sanitary fixtures, vanities, shower systems, wall panels, flooring and lighting, which means the toilet specification is usually coordinated with several other trades at once. The coordination is where most briefs fall apart.
What the product actually is: 1004A in plain terms
The Washdown One Piece Toilet 1004A is a modern, square-rounded one-piece ceramic WC on a washdown flushing mechanism. Two features decide whether it fits your project before anything else does:
- One-piece construction. The tank and bowl are cast as a single body, so there is no joint between them for dirt and bacteria to collect in. Housekeeping crews in hotels notice this on the cleaning schedule.
- Two rough-in options. The 1004A supports a P-trap wall drain at an 180 mm rough-in and an S-trap floor drain at a 250 mm rough-in. Which one you order is fixed by the existing pipework, not by preference.
The body is vitreous ceramic with a dense glossy glaze, specified to resist staining, limescale and yellowing over years of use. That matters most in high-turnover settings where the same fixture is scrubbed daily.
Brief item 1: the drainage condition, measured not assumed
Send us the drain type and the measured rough-in distance, taken on site. In new builds this comes off the plumbing drawing; in a renovation it has to be measured after the old WC is out. A brief that says "wall outlet" without a number will produce a toilet that sits off the wall or will not connect at all.
If a project mixes both conditions — some bathrooms on floor drains, others on wall drains — say so in the enquiry. That is normal for villa and apartment work, and it changes nothing about the model, only the order split. Where a room calls for a wall-hung WC instead of a floor-standing one piece, we specify from the Wall Hung Toilet 1051W range rather than forcing a one-piece unit into a concealed-cistern wall.
Brief item 2: the finish, style line and what must match
Ceramic colour is not one decision but several. Tell us:
- The white or off-white tone the tiles, basins and bathtubs already use, with the make and model of those items if they are on site.
- Whether the seat is supplied with the unit or sourced locally, and whether a soft-close or quick-release seat is required.
- Whether the flush button or lever needs to match other metalware in the room.
Where the specification runs across a guest floor or several villas, we align the 1004A with basins and vanities from the same interior fixtures scope, so the room reads as one design rather than a catalogue of parts.
Brief item 3: quantity, phasing and the site programme
Give us unit counts by bathroom type, and tell us which rooms are needed first. A hotel or apartment handover rarely needs every WC on the same date; phased delivery keeps fixtures out of site storage where they get damaged.
| Brief field | What to send | Why it changes the outcome |
|---|---|---|
| Drain type and rough-in | P-trap 180 mm or S-trap 250 mm, measured per room type | Determines which version of the same model is manufactured |
| Quantity by room type | Unit counts split by guest bath, master bath, powder room, staff bath | Drives production batching and phased shipment |
| Delivery destination | Site address, port or warehouse, plus who clears customs | Sets the freight route under our door-to-door service |
| Handover sequence | Dates each room group must be installed and grouted | Decides shipment splits and packing order |
| Inspection point | Who signs off samples before bulk production | Fixes the reference unit for colour and flush performance |
Brief item 4: customisation, and where it stops being useful
Our custom & OEM service covers bespoke finishes, private labelling and flexible order quantities. For ceramic WCs the honest boundary is this: glaze colour, branding on the seat or packaging, and matching metalwork are practical to customise. Re-engineering the trapway geometry or flush volume for one project is rarely worth the tooling cost and usually breaks the flushing performance the model was designed around.
When a client asks for something outside that range, we will tell you which part of the request changes price, which part changes lead time, and which part we recommend against. A manufacturer who never says no to a customisation request is not reading your drawings carefully.
Brief item 5: logistics, packaging and the person who receives it
Ceramics travel badly when packing is treated as an afterthought. Our logistics and door-to-door delivery service covers freight by sea, air and rail, customs paperwork, container loading and tracking. In your brief, name the receiving party on site and confirm whether they can take a container and check cartons against the packing list on arrival.
Photograph any damaged carton before signing. That single step decides whether a replacement is handled quickly or becomes an argument.
Brief item 6: installation, spares and who answers later
Specify at order stage who installs, because a one-piece WC with a set rough-in leaves no room for the fitter to improvise. Our installation and after-sales support covers on-site fitting, inspection and snag lists, plus spare parts and replacement. Ask us in writing which consumables — seats, flush mechanisms, seals — you should hold as spares for a hotel or rental portfolio, and get the part codes with the handover documents.
A short brief template that works
Copy this into your enquiry and fill it in. It takes five minutes and removes most of the back-and-forth:
- Project type and location: hotel, villa, apartment block, commercial restroom.
- Model of interest: Washdown One Piece Toilet 1004A, or ask us to recommend against the room.
- Drain condition per room type, with measured rough-in figures.
- Quantity by room type and required delivery dates per phase.
- Colour, seat type and metalwork to match, with reference items named.
- Delivery address, Incoterms preference, and the receiving contact.
- Who inspects the pre-production sample and by when.
One thing we ask of you: technical figures such as rough-in distances and dimensions on product pages are working references. Before production we confirm them against the current technical data sheet for your order, and you should check them against your plumbing drawing at the same time. Two signed drawings beat one assumed number.
Why brief it through a one-stop supplier instead of item by item
A bathroom is not one purchase. The WC, the vanity, the shower set, the mirror cabinet, the wall finish and the lighting all meet at the same junctions. When they come from separate vendors, the errors land on site: a vanity depth that blocks the WC swing, a tile line that misses a shower tray, a rough-in set before the fixture was ever chosen.
Ordering through one one-stop furniture and building materials supplier means those junctions get resolved in the design stage. For projects in Australia we have delivered villa and residential fit-out work, with published case references including renovated modern villas in Melbourne and Sydney. The coordination is the value; the ceramic is only one part of it.
Send us your bathroom schedule
Email your room list, drain conditions and target dates, and we will return a specification for the 1004A with the correct trap configuration, a phased delivery plan and a written spares list.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Enquiry page: https://www.santerson.com/contact/
Related ranges to consider alongside the 1004A: Washdown One Piece Toilet 1050A for a gold-line feature bathroom, and the Two Piece Washdown Toilet 1038A where a two-piece format suits the budget and access better.