A storage and display wall looks simple on a mood board and complicated on a purchase order. The moment a media wall moves from a render into a procurement brief, someone has to decide the dimensions, the mix of open and closed compartments, the finish, what happens behind the screen, and how the whole thing arrives and gets fixed to the wall. This article walks through how to specify the Santerson Storage & Display Combo so that the quotation you receive is comparable, the drawings you approve are buildable, and the installation on site does not stall.

What the product actually is before you specify it

The Storage & Display Combo sits in Santerson's Media & TV Walls collection. It is a configurable wall system rather than a catalogue item with one fixed size: finish, layout and dimensions are set per project, and the storage configuration is confirmed for each order. That single fact should shape your entire brief. You are not asking a supplier for a stock unit and a delivery date; you are commissioning a made-to-measure joinery element that has to coordinate with the wall it sits on, the screen it carries and the trades working around it.

SANTERSON works as a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, operating since 2008 and covering design, custom/OEM production, door-to-door delivery, installation and after-sales support. That scope matters here, because a media wall is rarely the only item in the same room: the same package usually carries built-in furniture, flooring, wall panelling and lighting, and specifying them together avoids the finish and level clashes that appear when each trade is bought separately.

The five decisions to settle before you request a quotation

Send an enquiry with these five items already answered and the return package will be a real proposal instead of a rough price. Leave them open and you will get three different numbers from three suppliers who each guessed differently.

1. The wall envelope, in millimetres, from a survey

Give overall width, height and depth, plus the position of skirting, cornices, switch plates, air-conditioning outlets and any return wall. Note floor level differences if the room is finished on site after the order. For a villa or apartment handover, ask for an on-site measurement rather than a drawing dimension; cabinet dimensions that must meet appliances, screens and reveals are set from measured openings.

2. The open-to-closed ratio, room by room

Decide what stays visible and what gets hidden, and write it down as a ratio you can hold the supplier to. A living wall usually needs shelving for books and objects, closed lower storage for games, cables and board games, and an open niche or recessed bay for the screen. If your scheme leans that way, Santerson Open & Closed Combo Units is the closely related listing to compare in the same enquiry, since it covers the media-unit version of the same open-plus-closed logic.

3. Finish and substrate

State the finish family you want and the sheen, not just a colour name. The catalogue spans wood grain, veneer, lacquer, acrylic, melamine and glass-fronted options, so name the direction — for example a warm wood grain with a matte surface to match existing joinery — and ask for samples before the order is placed. Colour on a screen is not colour on a board, and a media wall that reads correctly next to flooring and panelling only becomes obvious once boards are on site.

4. Lighting and services

If the design includes lit niches or shelf lighting, say so at brief stage and ask what is included: the fitting, the driver, the switching, and who supplies the electrical first fix. Where integrated lighting is part of the concept, Santerson Integrated LED Media Units shows how the same collection handles lit shelving, and it gives your electrician a reference point for the cable routes. Confirm lighting and electrical details for the selected design before production starts, because chasing a driver location after the carcass is built means cutting into finished panels.

5. Screen assumptions

Write down the screen size or size range, whether it is wall-mounted or carried on the unit, and how you want cables routed. If the screen is not yet selected, state the maximum size and mounting type you intend to allow for. For a fully recessed or panel-concealed arrangement, check the related Santerson Integrated TV Panels listing in the same collection and ask which option your chosen layout supports.

A brief template you can paste into your enquiry

Structure the enquiry as a table. It forces completeness on your side and makes returned quotations comparable line by line, which is the point of a procurement brief in the first place.

Line itemWhat to state
Project and roomLocation, room name, number of identical walls if it is a multi-unit or guest-room repetition.
Envelope dimensionsWidth, height, depth in millimetres; measured openings; floor finish build-up; obstructions.
Layout intentOpen shelves, closed cabinets, drawers, screen niche — with the open-to-closed ratio you want.
FinishMaterial family and sheen; sample required before production; matching items in the same package.
HardwareSoft-close doors and drawers, handleless or handled fronts, shelf adjustability, load expectation for shelving.
Screen and servicesScreen size range, mounting method, cable route, socket positions, integrated lighting scope.
Deliverables requestedShop drawings for approval before production; packing list; assembly or fixing detail for the site team.
Commercial termsQuantity, destination address, delivery terms asked for, and what installation does or does not include.
Configurable wall systems are listed with limited individual technical detail on the product page. Treat dimensions, materials, hardware, load ratings and electrical options as items to confirm for your specific project rather than fixed specifications you can copy into a tender document.

Where projects usually go wrong

Ordering from the render. A perspective drawing tells you the proportion, not the build-up. If the wall is being plastered or panelled after the order, the finished dimension changes and a unit made to the drawing dimension arrives short or proud. Confirm which party owns that risk before production.

Treating finishes as interchangeable. A veneer, a lacquer and a melamine front can all be described as "oak". They differ in edge treatment, sheen and how they behave next to a window. Specify the material family explicitly and check samples against the actual flooring and wall finish in the room.

Forgetting what is behind the panel. Screens need ventilation, cable pathways and access for service. A closed cabinet behind a wall-mounted television that has no venting or removable back panel becomes a maintenance problem on day one of occupancy.

Splitting the package across too many suppliers. When the media wall, the panelling beside it and the joinery in the same room come from different sources, reveals and shadow gaps rarely line up. Grouping built-in items into one specification and one production run is where a one-stop supplier earns its place; a whole-house example on this site pairs bay-window desk storage, staircase bookshelves and kitchen cabinetry from a single measured survey and installation team, which is the practical argument for consolidating the joinery scope.

How to read the returned quotation

Compare quotations on the same basis, and put the differences in writing before you award:

  • Does the price include shop drawings and an approval round, or are drawings charged separately?
  • Is the finish exactly what you specified, including edge banding and internal cabinet surfaces?
  • What is on the packing list, and does the shipment include fixing materials for the wall type on site?
  • Which delivery stage is covered — port, or all the way to the room of use?
  • Is installation included, and if so, who carries out snagging and how are defects handled afterwards?

Two quotations that look close on price can differ substantially once drawings, delivery scope and installation are added. Normalise them before the comparison means anything.

Approvals and handover

Ask for shop drawings and approve them in writing before production begins; that approval is your reference point if the delivered unit does not match. On arrival, check panels and hardware against the packing list while packaging is still open, and photograph any damage immediately. Before handover, walk the wall with the site team: door alignment, drawer operation, shelf levels, lighting function and cable access. Record outstanding items as a snag list rather than accepting the work verbally.

For warranty terms, response times and what after-sales covers, get the current written position for your project rather than relying on figures quoted in marketing pages — those vary across the site and should be confirmed before they appear in your contract documentation.

Ready to brief a media wall?

Send us your dimensions and finish direction

Tell us the room, the measured envelope, the open-to-closed ratio you want and how the screen will be mounted. We will come back with a layout proposal, drawings for approval and an itemised quotation — with delivery and installation scope set out in the same document.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Open the enquiry page and attach your drawings.