A buyer who sends only a product code usually gets a price list back. A buyer who sends the room behind that code gets an installation that works the first time. If your project is specifying the Wall Hung Ceramic Basin 1004B, Modern Wall Mount Bathroom Sink for guest bathrooms, villa bathrooms or a washroom upgrade, this guide shows exactly what to put in your enquiry and what our team checks before a single carton is packed.
What the 1004B actually is, before you write the brief
The 1004B is a wall-fixed ceramic washbasin from our 1004 sanitary series. It is made from vitreous ceramic with a dense glossy glaze, and the compact trapezoid outline keeps it readable in contemporary interiors without the sharp edges that trip people up in tight bathrooms. The bowl measures 510 × 420 × 380 mm and is fixed to the wall through a back panel, so the floor beneath stays clear — which is why these basins keep appearing in projects where the floor finish runs continuously into the wet area and housekeeping needs to mop underneath.
One tap hole is provided for a single faucet. That detail drives most of the rest of the specification: mixer height, spout reach, and whether the waste and trap you have chosen sit clear of the back panel fixing.
Section one of your brief: the room, not just the fixture
Start the enquiry with the type of bathroom you are fitting out. A guest powder room in a villa, an en suite in a boutique hotel and a shared public washroom all take the same basin, but they do not take the same decisions around it.
- Count and layout. How many bathrooms, how many basins, and whether the 1004B is being repeated on a shared wall. Repeated units need consistent waste centres, so tell us the number of identical positions.
- Who uses it, and how often. Hotel guest bathrooms are cleaned daily with stronger agents than a family bathroom. The glaze is what you are really buying here: the dense glazed layer on the 1004B resists water stain and limescale build-up, which is what keeps a basin looking right after two years of daily housekeeping.
- What sits next to it. Mirror size, vanity or no vanity, towel rail position. A wall hung basin with no vanity underneath needs its own storage answer somewhere else in the room, and that is a design conversation, not a delivery question.
Section two: the plumbing information that decides fitment
This is where enquiries stall. A wall hung basin depends on what is already in — or going into — the wall, so send us:
- The waste and trap arrangement you intend to use, with your rough-in dimension from finished floor level to the waste centre.
- Whether the wall is a stud partition with a concealed frame or solid masonry. The back-panel fixing behaves differently in each, and the wall build-up affects how far the basin sits off the finished surface.
- The tap you have chosen, with its spout reach and whether it deck-mounts on the basin's single tap hole or rises from a counter or wall outlet behind it.
- Whether hot and cold supplies are already positioned, or whether your plumber is setting out to our drawings.
The dimensions shown on our product page are the basin's own body measurements. Confirm rough-in, trap and wall-fixing details against the current technical data sheet for your order before your builder sets out the pipework — we will send that sheet with the quotation so the numbers in your drawings match the numbers on the carton.
Section three: quantity, finish pairing and the rest of the suite
Because the 1004B belongs to a matched series, an enquiry that starts with one basin often ends as a small suite. The Washdown One Piece Toilet 1004A shares the same square-rounded silhouette and glaze, and where floor space allows, the Freestanding Ceramic Pedestal Basin 1004S gives the same look in a floor-standing form for bathrooms that cannot take a wall fixing. Specifying these together means one glaze tone across the room and one shipment.
Tell us the quantity per bathroom type, not just a total. A hotel job with three room categories usually needs three identical bathroom packages, and it is easier to build that at quotation stage than to reconcile it after the containers are booked.
| Model | 1004B wall hung ceramic basin |
| Body size | 510 × 420 × 380 mm |
| Material and surface | Vitreous ceramic, glossy glaze |
| Mounting | Wall hung, fixed by back panel |
| Tap provision | One tap hole, for single faucet installation |
| Shape | Trapezoid, minimalist outline |
| Typical use | Home renovation, apartments, hotels, public washrooms |
| Matched series | 1004 sanitary series (1004A toilet, 1004S stand basin) |
Section four: delivery, packaging and site handling
Ceramics travel badly when they are treated as an afterthought in a mixed load. In your enquiry state the destination port or site address, whether you want door-to-door delivery or collection at the port, and how many units you can store on site before installation begins. We pack basins individually and load to the sequence your installer needs, so the bathrooms being fitted first come off the truck first.
As a furniture and building materials manufacturer, we normally ship 1004B basins alongside other fixtures from the same fit-out — vanities, wall panels, flooring, lighting — so the sanitary ware arrives inside the same project shipment rather than as a separate order you have to chase.
Section five: how our team turns your enquiry into an order
Send the brief and here is what happens next. We review the room type, quantity and plumbing information you supplied, then come back with a quotation that lists the confirmed technical data sheet for the 1004B, packing dimensions and carton count, and the rough-in figures your plumber needs to check against your drawings. If your bathroom design calls for a different size, shape or mounting style, we will say so at that point rather than let you commit to a code that does not suit the wall.
From there the sequence is detail confirmation, production and quality control, then shipment and site follow-up. As a one-stop furniture and building materials supplier, we handle the customisation, freight documentation and installation support around the order, so the basin, the joinery it sits against and the wall finish behind it are coordinated by one team instead of three.
A short checklist to paste into your enquiry
- Project type and location; number of bathrooms and number of 1004B units per bathroom type.
- Waste and trap arrangement, with rough-in from finished floor level.
- Wall construction: stud partition with concealed frame, or solid masonry.
- Selected faucet, with spout reach and mounting method.
- Whether the 1004A toilet or 1004S stand basin is being ordered as part of the same suite.
- Destination address, port or door-to-door, and on-site storage capacity before installation.
Send us the brief. If you are specifying the Wall Hung Ceramic Basin 1004B for a villa, apartment or hotel project, contact our team with the checklist above and we will return a quotation with the technical data sheet, packing list and rough-in details for your plumber to confirm.
SANTERSON — China-based manufacturer of furniture and building materials, supplying bathroom ceramics, vanities, lighting, cabinetry and interior finishes for residential and hospitality projects worldwide.