A swim spa of this size is not a catalogue item you can sign off from a datasheet alone. Before the purchase order for Outdoor Swim Spa WS-130AⅢ is released, the architect, the builder, the M&E consultant and the client all need to be looking at the same drawing. The checklist below follows the order in which those decisions actually have to be made on site.

Start with the pit, the deck and the access route

The catalog lists this model at 8000 × 3000 × 1400 mm. Treat those numbers as the starting point for coordination rather than a final setting-out dimension, and confirm the finished dimension against the production drawing before any slab is poured.

Three separate questions sit behind that one figure:

  • Installation method. Fully recessed, semi-recessed or above ground on a deck? Each option changes the waterproofing detail, the perimeter drainage and how the cabinet is supported.
  • Structural support. A full water volume plus occupants is a heavy imposed load. The supporting slab or deck framing should be checked by the project structural engineer for the chosen installation method.
  • Access and delivery. An eight-metre shell has to reach the position on site. Confirm the truck size, the crane or forklift plan, gate widths and any overhead obstruction well before the delivery date.

Confirm the equipment set in writing, not by model name

Within the same range, models that look alike on a spec sheet are configured differently. The catalog entry for WS-130AⅢ shows a swim training system together with water jets, LED lighting and ozone; the closely related WS-130AⅢ-U carries a different jet count, pump arrangement and lighting layout, with no swim training system recorded for it. Same shell footprint, different plant room.

This is where procurement teams get caught. A model code quoted in a bill of quantities does not guarantee that every accessory shown in marketing material is included. Ask for the itemised configuration sheet for the exact code you are ordering, and have it attached to the purchase order as a controlled document.

Item recorded in the catalog for WS-130AⅢCatalog value
Catalog dimensions8000 × 3000 × 1400 mm
Control system1 set
Swim training system1 set
Water pump1 pc
Filter pump1 pc
Jet total20 pcs
LED lights7
Total power10.85 kW
Read the table as a catalog record, not as a guaranteed supply list. Confirm every line against the configuration you are actually buying, and confirm the electrical requirements before the electrical contractor prices the board.

Resolve the power supply early

The catalog shows total power for this configuration at 10.85 kW. That figure drives real decisions on site: the supply capacity available at the property, the cable size and run length from the board, the location of the isolator, and whether a heat pump is being added to the same circuit group. In a retrofit villa the incoming supply is often the constraint nobody has checked.

  • Have the electrical consultant confirm phase, voltage and dedicated circuit requirements against the selected configuration sheet.
  • Keep the isolator and access to the plant reachable from an inspection hatch — not sealed behind finished tiling.
  • If a heat pump is on the project budget, price it into the electrical package at the same time rather than as a later variation.

Decide which options belong to this project

Catalog-listed options for the range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs confirming against WS-130AⅢ specifically.

For a project in a cooler climate or an unheated outdoor position, insulation and the heat pump are usually worth evaluating together, because they change both the running profile and the electrical package. Steps look like a small accessory, but step height and position affect handrail details and the surrounding deck layout, so settle them at drawing stage.

Use one coordination meeting, not three email chains

The practical way to close these points is a single design-coordination session with the supplier's technical team present. Bring the site plan, the section through the intended installation position, the electrical single line and the landscape drawing. That one meeting typically resolves the support detail, the plant access, the step arrangement and the delivery route in the same hour.

SANTERSON works this kind of scope as part of its turnkey furniture and building materials service, covering design consultation and space planning, material selection and product specification, manufacturing and quality control, then project management and site coordination. Where a swim spa has to be matched to other outdoor products from the same property — pergolas, loungers and terrace seating — specifying them through one supplier keeps finishes and delivery windows aligned.

Then lock down logistics and handover

Before shipping: signed configuration sheet, packaging and container loading plan, delivery address access notes, and the agreed lifting arrangement.

On arrival: inspection against the packing list, damage check on the acrylic shell, and confirmation that all listed equipment has arrived before the crane is released.

At handover: commissioning in front of the client's representative, a written record of the control settings, spare-parts contact, and the maintenance schedule for filtration and water treatment. Installation and after-sales support should be defined in the contract with named scope, not left as a general promise.

The five sign-off questions

  1. Has the finished dimension and installation method been confirmed on drawing, and has the structural engineer signed off the support?
  2. Is the itemised configuration sheet for this exact model code attached to the purchase order?
  3. Has the electrical consultant confirmed supply capacity and circuit requirements against that sheet?
  4. Are the selected options — heat pump, insulation, steps, sterilisation — confirmed as compatible with WS-130AⅢ?
  5. Is the delivery, lifting and commissioning sequence documented and agreed with all parties?

If your team is specifying a swim spa as part of a villa or resort package, send us the drawings and we will return a configuration sheet, an installation note and a coordinated quotation. As a China-based one-stop furniture and building materials supplier, SANTERSON handles specification, production and door-to-door delivery for project clients.