A two-tone lacquer wardrobe is one of those joinery items that looks simple on a mood board and turns out to be surprisingly detailed on site. The door fronts carry the finish, so every measurement error, wall deviation and service clearance shows up as a visible gap or a door that will not swing open. If you are a builder, interior designer or project buyer preparing an enquiry, the following checklist covers the measurements and project inputs we need to price and produce Two Tone Lacquer Wardrobes as made-to-measure pieces rather than catalogue units.
Why Two Tone Lacquer Wardrobes Are Specified Differently From A Single-Colour Box
Our Two Tone Lacquer Wardrobes sit inside the Lacquer Wardrobes collection, and like the rest of that range they are made to measure: sizing, material and finish options, and the internal layout are all set per project. The two-tone effect comes from pairing a lighter door front with a darker one, or pairing lacquered fronts with a contrasting carcass or open niche. That contrast is unforgiving in three ways.
- Joint lines become design features. Where a light front meets a dark front, the reveal between doors has to be consistent. Out-of-plumb walls force us to scribe the carcass, which changes the visible gap unless it is planned in advance.
- Light reflects off lacquer. A lacquered surface shows raking daylight, so we ask about window position and lighting before finalising which tone goes on which side of the run.
- Order of assembly matters. Dark carcass panels behind light doors need to be set square first, because a 3 mm twist at the top of a 2.4 m run is obvious at floor level.
The Measurements That Actually Drive The Drawing
A single length and height is not enough for a built-in wardrobe. When you send the survey, please include each of the following, recorded at more than one point in the run.
| Input | How to record it | What it decides |
|---|---|---|
| Width of the recess | Measure at floor, mid-height and ceiling; report the narrowest figure and the variation between points | Carcass width, scribing allowance, whether the run needs a filler panel |
| Depth at three points | Front wall to back wall at left, centre and right | Carcass depth, door clearance, whether hanging garments will catch the doors |
| Floor-to-ceiling height | At each end plus the middle; note any bulkhead, beam or cornice | Overall height, top panel detail, whether the wardrobe is scribed to an uneven ceiling |
| Door and window swing | Hinge side, opening angle, handle projection | Which end of the run can take hinged doors, drawer pull-out clearance |
| Skirting, architrave and services | Height of skirting; position of power points, switches, lights, AC grilles | Cut-outs, whether services must be relocated before production |
| Finished floor level | Whether flooring is already laid or still to come, plus its build-up thickness | Plinth detail and the height we quote from |
Where a room drawing already exists, send it alongside the site figures. If the two disagree, we work from the survey and flag the difference before production.
Door Type And Clearance: Decide This Before The Layout
The door mechanism changes the internal layout more than any other decision. Two of our related collections show how the same room reads differently depending on the choice:
- Two Tone Hinged Wardrobes need clear swing space in front of the run. Allow for the door leaf plus handle projection, and check that an opposite wall or bed frame does not block full opening.
- Two Tone Sliding Door Wardrobes suit rooms where the floor in front of the wardrobe is tight. They need accurate headroom for the track, and you lose part of the opening width at any one time.
Tell us which option you prefer and we will design the internal partitions around it, since a drawer bank behind a sliding door has different access rules than behind a hinged door.
Interior Inputs: What Goes In Determines Shelf And Rail Heights
Rather than guessing at storage, send us a short list of what the wardrobe has to hold. It changes the drawing more than any decorative decision:
- Hanging lengths: long garments such as coats and dresses need one drop height; shirts and jackets need another
- Shoe storage, whether on the floor inside the carcass or on low shelves
- Bulky items such as luggage, bedding or an ironing board, which decide the depth of the deep shelves
- Trousers rails, tie or jewellery trays, and drawers for folded clothing
- Integrated lighting in open niches, and where its wiring should terminate
- Household needs such as a safe shelf height for children, or a lower rail for accessibility
For villa and apartment fit-outs we normally send back a layout showing hanging zones, shelf heights and drawer positions for your sign-off before any panel is cut. That single confirmation step prevents most of the changes people later want on site.
Finish Inputs: Lacquer Tone, Sheen And The Contrast Pairing
Lacquer is specified by tone and sheen, not by a generic colour name. Send us the finish schedule with:
- The two tones you want to pair, ideally matched to an existing sample or paint reference rather than a screen image
- Sheen level for each surface, since high gloss and matte read differently under the same lighting — our High Gloss Lacquer Wardrobes and Matte Lacquer Wardrobes pages are useful references when a project mixes the two
- Which element carries which tone: door fronts, carcass, open shelving, or the internal boxes
- Hardware: handle style and finish, or whether you want push-open fronts with no visible ironmongery
If a project needs the wardrobe to match kitchen or vanity joinery, send those drawings too. We produce cabinetry for kitchens, bathrooms and bedrooms in the same factory, so matching lacquer tones across rooms is easier to control when all the joinery comes from one order.
Project Inputs Beyond The Dimensions
The last group of inputs is about programme and site conditions rather than the object itself:
- Installation sequence. Tell us whether flooring, painting and lighting will be complete before the wardrobes arrive, and who handles scribing to uneven walls on site.
- Access route. Lift dimensions, stair widths and corridor turns decide whether a tall carcass ships as one panel or is split and assembled in the room.
- Quantity and repetition. A single bedroom wardrobe and forty identical hotel-room units are quoted differently; send the schedule of rooms so we can see what repeats.
- Site drawings and specification documents. For hospitality and villa projects, the architectural set lets us check our dimensions against the design intent instead of working from photographs.
- Delivery destination and preferred terms. We arrange freight and door-to-door delivery, but import terms and delivery scope are confirmed case by case for each project.
How The Information Moves Into Production
Our work on a wardrobe order follows the same route as our wider turnkey projects: consultation, design and planning, production, logistics, installation and after-sales. For Two Tone Lacquer Wardrobes that means your measurements become a layout drawing, the drawing becomes a confirmed specification with panel sizes and finish codes, and only then does cutting begin. Because sizing, material and finish options are all project-specific, we ask every buyer to confirm dimensions and selected specifications for each project before production is released — that confirmation is what keeps a two-tone design sitting straight on a wall that was never quite true.
Send your drawings and survey notes
If you have a room drawing, the six measurements above and a finish schedule, contact us and we will return a wardrobe layout with internal partitions and a quotation based on your project. Site visits and on-site installation guidance can be arranged as part of a fit-out package.