Classic French double doors are one of those specification choices that quietly decides how a room feels for the next fifteen years. They carry light through a plan, they set the proportion of every wall opening they sit in, and they get used more often than almost any other door on the project. Because they are usually supplied made-to-measure rather than from a shelf, the buying decision is really a specification exercise. The buyers who get a good result are the ones who settle four things before they ask for a price: opening geometry, hardware logic, finish schedule, and the sequence in which the doors arrive on site.

Start With the Opening, Not the Door

A pair of French doors is an assembly of two leaves, a frame, a meeting stile detail and — very often — a transom or side lights that were drawn on paper long before anyone measured the reveal. The first job is to confirm the structural opening against the finished floor level and the finished wall thickness, because both change during a build. Tile build-up, screed, plaster and panelling can easily shift an opening by enough to matter to a hinged leaf.

Then decide the operating pattern early: which leaf is the active one, whether the second leaf stays shut day to day or swings regularly, and whether you need an astragal or rebate detail at the meeting edge so both leaves close squarely. This choice affects the frame, the hardware and the way the doors are packed for shipping, so it should be settled before production rather than corrected on site.

Our Classic French Double Doors are made-to-measure, with the material, finish and layout specified per project — which is exactly why we ask for opening dimensions and elevations at enquiry stage instead of a model number. There is no standard size to fall back on.

Match the Style Family to the Rest of the Joinery

Classic French double doors read as traditional or transitional, and they look wrong when the architraves, wardrobes and cabinetry around them are pulling in a different direction. Before you commit, lay the door elevation next to the other timber work on the schedule: skirting, architrave profile, panel mould, wardrobe fronts and any built-in shelving. If those are already drawn, the door should follow their panel proportion and finish rather than sit apart from them.

Where a project wants the same glazing rhythm but a different head detail or a slimmer sightline, it is usually cheaper to change within one collection than to mix suppliers. We keep arched and slim-frame variations alongside the classic detail so the opening can be resolved without re-drawing the joinery package.

Get the Hardware and Glazing Logic Into the Order

The most common regret with double doors is not the door; it is what was left out. Flush bolts, the correct lockcase backset, hinge grade for the leaf weight, threshold detail at an external or balcony line, and the glass specification all have to be in the order, because they change the stile construction and the frame rebate.

Three questions settle most of it:

  • Which leaf carries the lock? The inactive leaf needs a coordinating bolt and keep; if this is left to the installer, you get an on-site modification to a finished door.
  • Is the opening internal or exposed? That determines the threshold, the seal detail and whether the glazing and finish schedule need to suit a different environment from the rest of the timber joinery.
  • What glass, and what sightline? Glazing bars, pane count and glass type change how the door reads in elevation. Confirm against a drawing, not a photograph — catalogue images are rarely the exact configuration you will receive.

Treat Doors as Part of the Fit-Out Package

Doors bought on their own arrive on one date; doors specified alongside wardrobes, cabinetry, wall panelling and flooring arrive in a coordinated sequence, from one drawing set, in one finish schedule. That matters more than most buyers expect. It removes the two-supplier argument about whose measurement was wrong, it keeps timber tone consistent across the joinery package, and it means one party is accountable for the openings.

If you are procuring from overseas for a villa or hospitality fit-out, also fix the logistics questions in the same conversation as the product: container loading sequence, packing for glazed leaves, the paperwork for customs clearance, and where the doors sit on site until the wet trades are finished. We handle furniture logistics and door-to-door delivery as part of the project scope, which is why we would rather confirm the opening dimensions and finish schedule at quotation stage than accept a change order after production.

For buyers comparing several suppliers on one project, furniture sourcing for Australian projects is usually where that comparison starts to pay for itself — the saving rarely comes from the unit price of a single door line, but from consolidating doors, joinery and finishes under one production and shipping plan.

What to Send When You Request a Quotation

A quotation you can actually compare against another supplier's contains the same information every time. Send:

  • Opening widths, heights and wall thicknesses, referenced to finished floor levels.
  • The elevation or drawing showing panel layout, glazing bar pattern and head detail.
  • Operating pattern: active leaf, swing direction, flush bolt side, lock position.
  • Finish schedule — species or substrate, stain or paint reference, sheen level.
  • Hardware expectation, even if you intend to source the ironmongery locally.
  • Delivery location and the installation sequence for the openings concerned.

With those details, we can confirm dimensions and the selected specification for each opening before anything is cut, and flag the openings that need a different solution — an arched head, a slim frame, or a pocket or folding arrangement where a swinging leaf would fight the furniture layout.

The Decision, Reduced to Four Checks

Before you sign off on classic French double doors, check that: the opening dimensions are referenced to finished levels; the operating and locking logic is drawn rather than assumed; the panel and finish language matches the joinery around it; and the delivery sequence puts the doors on site after the wet work but before the floor finishes are protected. A door that passes those four checks will look right, close properly and arrive when the trades can actually install it.

If you are specifying a set of openings for a residential or hospitality project, send us the drawings and the windows and doors schedule and we will quote against your dimensions and finish choices.