A shelf-focused modular wardrobe only works when the shelves are planned before the panels are cut. This guide sets out what a complete installation plan should contain, from site measurements and load planning to sequencing, wall prep and handover checks.

Shelf-focused layouts look simple on a drawing. A run of horizontal shelves, some hanging sections, a few drawers at the base. On site they fail in predictable ways: shelves that bow under weight, gaps at an out-of-square wall, doors that bind against a fixed shelf, or a top shelf set too high to reach without a stool. The difference between a wardrobe that serves a bedroom for years and one that needs adjusting after handover is almost always the quality of the plan signed off before production.

Our Shelf Focused Modular Wardrobes are made to measure, with the layout, materials and finishes specified per project. That flexibility is exactly why the plan matters: nothing about the unit is standard, so every dimension and interface has to be written down and confirmed.

1. A measured site record, not a drawing-office number

The plan should carry a measurement sheet taken at the actual opening, with the drawings referenced rather than replaced. For each wall run record:

  • Width, height and depth at three points along the run — head, middle and foot — not one average figure.
  • Plumb and level checks on each wall and floor line, with the deviation noted in millimetres.
  • The position of skirting boards, architraves, cornices, radiators, switches, sockets and light points.
  • Opening clearance: door widths, hallway turns, stairwell dimensions and lift size on the route from the delivery point to the room.

A shelf-focused unit is unforgiving. Fixed shelves span between uprights, so a wall that leans by even a small amount changes the effective depth at one end of every shelf. Note the deviation in the plan and state how it will be handled — scribing, a filler panel, or an adjusted carcass depth.

2. Storage zoning matched to what will actually be stored

Ask the buyer what goes on the shelves before fixing shelf heights. Folded knitwear, towels, linens, shoes, bags and books each need different depths and heights, and a plan that ignores this produces wasted space in a bedroom and poor stock rotation in a hospitality room.

Stored itemPractical shelf spacingPlanning note
Folded clothing and knitwearTight, repeated baysKeep bays in the reach zone between shoulder and knee height.
Linens and towelsEven, stacked baysGroup by set size so stacks do not topple when one is pulled out.
Bags and boxesTaller baysPlace near the base or top where depth is less critical.
Occasional itemsThe highest baysOnly use above-reach zones if a step or access aid is part of the room.
Daily hanging garmentsRail height set by garment lengthReserve at least one rail run; shelf-only layouts push clothes into piles.

Where a project needs both shelving and drawers, Drawer Focused Modular Wardrobes show how base-zone storage is handled; where the mix matters more than either extreme, Combination Modular Wardrobes cover a shelving-and-drawer hybrid in one run.

3. Shelf span, load and material decisions written into the specification

This is the section most often left blank. The plan should state, for each shelf:

  • The clear span between supports, and whether a vertical divider or centre upright breaks a long run.
  • The intended load — light folded goods versus dense stock such as books, ceramics or bottled amenities.
  • The board material and thickness for that span, and the edge treatment on visible fronts.
  • Whether shelves are fixed, adjustable on supports, or a combination, with pitch noted for adjustable rows.

Long unsupported spans are the single most common cause of callbacks on shelf-focused units. If a bay is wide because the room demands it, the plan should say how deflection is controlled: an intermediate support, a shorter span, or a thicker board. Confirm dimensions and the selected specification for each project before production, since these choices change panel sizes and hardware.

4. Interfaces with the building

A modular wardrobe is fixed to and around the structure of the room. The plan must record:

  • Fixings. Wall build-up at each fixing point — masonry, stud partition, plasterboard — with the anchor type matched to it, and a note where the substrate has to be verified on site.
  • Wall prep. Where the finish is to be complete before installation, and where panels will scribe to an existing surface.
  • Services. Confirmation that no concealed conduit, pipe or cable crosses a drilling line, and relocation of any socket or switch that would sit behind a closed panel.
  • Door clearance. Swing radius for hinged doors, track depth for sliding doors, and clearance for drawers and pull-out trays when the front is open. A fixed shelf directly in front of a drawer bank is a plan error, not a site error.
  • Lighting. Whether interior lighting is required, and where power, switching and access for maintenance are provided.

5. Production detail sign-off

Before manufacture, the plan should be converted into shop drawings that the buyer signs. Those drawings need to show elevation per section, shelf positions with heights from finished floor level, finish names and samples, hardware schedule, and the split of the run into modules for delivery. Anything discovered later — a moved socket, a revised shelf height — is a change order, so this is the point to force one full review with everyone who will be on site.

6. Delivery, access and installation sequence

The plan should set out the day of installation in order:

  • Delivery window and packaging route to the room, with protection laid for floors and door thresholds.
  • Room readiness date — decoration complete, floors laid, site clean and dry.
  • Sequence: base or frame setting, uprights, fixed shelves, adjustable rows, doors and hardware, then infill and scribing.
  • Packaging removal and disposal responsibility, stated in writing.
  • Which trades are on site at the same time, so drilling lines are not obstructed.

SANTERSON handles this as one scope rather than several separate purchases. Our logistics and door-to-door delivery service covers freight, packaging and container loading, shipment tracking and delivery to site, with the documentation handled alongside. Installation and handover are arranged through our installation and after-sales support service.

7. A handover checklist that can be signed

Close the plan with the acceptance items you will actually check on site:

  • Carcass level and plumb across the full run, verified with a spirit level at several points.
  • Every shelf seated fully on its supports, with no rocking under hand pressure.
  • Gaps at scribed edges consistent along the run, with no visible light line.
  • Doors aligned with even reveal, opening and closing without contact against carcass or adjacent fittings.
  • Drawers and pull-outs running free through their full travel, including at corners.
  • Fixings tested at each anchor point; adjustable shelf supports engaged on both sides.
  • Finish inspected in daylight for damage in transit or handling, with any snag logged before the buyer signs.

Send us the opening dimensions, a note on wall build-up and what you intend to store. We will return a layout with shelf spans, board specification and finish options for your review before anything goes into production — see the Shelf Focused Modular Wardrobes product page to start.

Planning a bedroom or hospitality fit-out?

Wardrobes are one part of a wider package. As a one-stop furniture and building materials supplier, we supply built-in storage alongside cabinetry, flooring, wall finishes, lighting and loose furniture for villa, hotel and office projects, coordinated through one production and delivery schedule.

Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com, to discuss your project drawings and requirements.