A lacquer kitchen is one of the few fit-outs where a small mistake stays visible for years. Two-tone doors sit at eye level, catch the light from two directions, and are opened hundreds of times a week. Before you place an order on two tone lacquer cabinets, the questions that matter most are not about the sample board — they are about what happens after the container leaves the factory. Below is the checklist we suggest bringing to every supplier conversation, whether you are fitting out a single apartment kitchen or ordering cabinetry across several villa units.

1. What exactly does the warranty cover, and for how long?

"Warranty included" means very little until it is written down. Ask the supplier to separate the coverage into three parts, because each fails differently:

  • The substrate and carcass — panels, boxes, hinges and drawer runners. These are structural, and a failure here usually means replacing a whole unit.
  • The lacquer film itself — adhesion, yellowing of the light-coloured side in a two-tone scheme, and edge wrapping on moulded door profiles.
  • Hardware — hinges, runners, lift systems and integrated lighting drivers, which are frequently supplied by a third party and carry their own terms.

Then ask two practical questions: who pays the freight on a replacement door shipped internationally, and how is labour for the swap-out handled locally. A warranty that covers the panel but not the shipping and the fitter protects the supplier, not you.

2. How are spare doors and panels re-produced later?

Two-tone layouts make this sharper than a single-colour kitchen. If one upper door in a light lacquer is damaged three years from now, the replacement has to match not only the colour but also the sheen level and the direction of any metallic or textured effect. Ask the supplier how they record your specification after the project closes:

  • A written finish code for each of the two colours, plus the sheen level, rather than a colour name only.
  • Whether the batch number of your lacquer run is archived, and for how long.
  • Whether a spare-parts door can be ordered on its own, or whether the supplier requires a minimum order that forces you to buy a full set.

SANTERSON's after-sales scope lists spare parts and replacement alongside installation and maintenance, which is the structure you want in writing before production starts. Confirm the ordering route and any quantity limits for your specific project rather than assuming them.

3. Who inspects the cabinets when they arrive, and against what standard?

Lacquer damage is overwhelmingly transport damage: chipped door edges, scratched faces from packing that shifted in transit, and dents at the corners of tall panels. The buyer's protection is a defined acceptance step, not a photograph sent back weeks later. Agree in advance:

  • What inspection checklist applies on unloading, and how long you have after delivery to report a snag.
  • How damage is documented — serial or unit number from the packing list, photographs of the label and the defect together.
  • Whether replacement panels are air-freighted when the installation date is fixed, and who carries that cost if the cause was packing.

The logistics scope on this site covers packaging and container loading, customs paperwork and door-to-door delivery, so ask how those steps connect to a claim. Packaging responsibility and freight responsibility are often handled by different parties in the same shipment.

4. Is installation included, and who answers when it goes wrong?

Two-tone cabinetry exposes installation error more than any other finish. Uneven wall reveals, a door out of alignment by two millimetres, or a light and dark panel meeting out of square all become obvious under the sheen. Ask:

  • Whether on-site installation is provided at your project location, or whether the supplier supplies setting-out drawings for a local fitter.
  • Which party signs off the snag list — the supplier's installer, your contractor, or both.
  • Whether adjustment of doors and drawers after handover falls under warranty or under paid maintenance.

SANTERSON describes project design coordination with on-site guidance as part of its interior design service, and lists installation and inspection as part of after-sales support. Which form that takes for your site — a visiting installer, remote supervision, or drawings only — should be confirmed per project and stated in the order.

5. What is the response route if something fails after handover?

Ask for a named contact and a written channel, not a shared inbox. Then get three specifics: how quickly an enquiry is acknowledged, what evidence you are expected to provide, and how long a decision on a warranty claim takes. Response times published on marketing pages are targets, not commitments — the figure that protects you is the one printed in your order confirmation or contract.

For multi-unit projects, ask whether a single reference number covers the whole batch. If twelve villa kitchens were shipped in three containers, you want one specification record to quote from, not three.

6. How should the finish be maintained, and what voids it?

Request the cleaning guidance in writing before handover, and read the exclusions carefully. Abrasive pads, solvent-based cleaners and aggressive degreasers are common causes of lacquer claims being rejected. High-gloss surfaces also show handling marks during the construction phase, so ask whether protective film is fitted and when it should be removed.

This matters more on a two-tone design than you might expect: the light panel and the dark panel in the same run of cabinetry can show the same cleaning error very differently, which is why claims are often judged door by door.

Questions to take into your next supplier call

  • Which three components does the warranty cover separately, and what is each term?
  • Who pays freight and labour on a replacement part after delivery?
  • Is your finish code and sheen level archived for future spare-parts orders?
  • What is the inspection window after unloading, and how do we document a snag?
  • Is installation at our site included, and who signs off the snag list?
  • Which named contact handles claims, and what response time is written into the order?
  • What cleaning practice voids the finish warranty?

Warranty terms, response times and installer availability vary by project and destination. Get the figures that apply to your order in writing before production begins; do not rely on published marketing claims.

Talk through your cabinetry package

SANTERSON works as a one-stop furniture and building materials supplier, covering design coordination, made-to-measure production, logistics and after-sales support for villa, hospitality and office projects. Within the lacquer collection you can also review Matte Lacquer Cabinets, high gloss lacquer cabinets and shaker lacquer cabinets, each specified to project dimensions. Send your drawings through the contact page and ask for the after-sales terms in writing with your quotation.