An arched wardrobe elevation looks convincing on a rendering and awkward on site. Curved mouldings, panel joints that must line up around an arch, and made-to-measure casework against uneven walls are exactly where commercial budgets slip. The checklist below is what we ask buyers and consultants to verify in a proposal before the first deposit, using our Arched Paneled Wardrobes line as the reference product.

What an arched paneled wardrobe proposal should actually contain

Our Arched Paneled Wardrobes sit within the Classic Paneled collection and are made to order: sizing, materials, finishes and internal layout are specified per project. That flexibility is the reason two quotations for the same room can differ by a wide margin — they are not describing the same object. A proposal you can evaluate normally has six parts.

  1. Elevations with dimensions, not a mood image. Overall width, height and depth per unit; arch radius or rise; stile and rail widths; panel field sizes; door swing or track clearance.
  2. A written specification of substrate and finish. The board core, the surface material, the paint or lacquer system, and which faces are finished. A curved arch component is a different manufacturing route from a flat rail, so it should be named separately.
  3. An internal layout drawing. Hanging rails, shelves, drawers, vanity or display niches, with load notes for anything that carries weight.
  4. A scope boundary. Site measurement, drawings, production, packing, freight, installation and snags — which of these are priced, and which sit with the main contractor.
  5. Assumptions about the room. Finished floor levels, wall plumb and square, ceiling level tolerance, skirting interface, and where services run behind the casework.
  6. A change and approval route. Who signs off shop drawings, what happens after sign-off if a dimension moves, and how variations are priced.

If any of those six are missing, the number in the quotation is provisional. Ask for it in writing before comparing prices between suppliers.

Read the drawings before you read the price

Arched geometry concentrates cost in three places, and each one should be visible on a shop drawing:

1. The arch itself

Check whether the arch is formed from bent or laminated stock, from a solid machined moulding, or from faceted straight segments with visible mitres. Each reads differently once painted, and each costs differently. A rendering rarely shows the difference; a setting-out drawing does.

2. Panel joints around the curve

Paneled doors rely on a frame-and-field construction. Where a panel meets an arched head, ask how movement is accommodated and how the joint is finished. Specify the reveal you expect and confirm it on a sample rather than on a photograph.

3. Interface with the building

Full-height built-in casework meets slab, screed, plaster and skirting. In a commercial or multi-unit job those surfaces are rarely within a few millimetres of the drawing. Ask what packing and scribe detail is included, and who makes good around the unit after installation.

A practical test: send the supplier one room's measured survey and ask for a marked-up elevation within your normal review window. A factory that can produce made-to-measure work will return dimensions, a section through the arch head and a finish schedule. One that cannot will return a catalogue image with a price.

Compare like for like across the quotation

The table below is how we suggest structuring the comparison when you hold two or three proposals for the same wardrobe package. Fill in what each supplier actually states; leave blanks rather than inferring them.

Line to compareWhat a solid answer looks likeWhere problems appear later
Made-to-measure sizingSite measurement included; dimensions confirmed against finished levels before production releaseUnits ordered to architectural dimensions that ignore screed and floor build-up
Material and finish scheduleNamed substrate, named surface, named paint or lacquer system, finished faces listedUndersides, returns and internal edges quoted as "matching" without a defined method
Arch detailMethod of forming the curve stated, with a sample or mock-up referenceFaceted construction accepted on site when a true curve was assumed
Internal configurationRails, shelves and drawers drawn per unit, with hardware namedStorage added after installation at variation rates
Batching across unitsRepeat room types grouped, with tolerances stated for each batchEvery unit treated as one-off, inflating both price and lead time
Packing and freightCrate schedule, container loading plan, delivery point namedPanel damage on arrival, and site storage that cannot take the crates
Installation and snagsCrew scope, protection, make-good and a snag list signed at handoverTrade overlap with painting and flooring, each party assuming the other will fix it

Where arched wardrobes earn their place in a commercial fit-out

Arch heads and curved niches are a design device, so they belong where the design brief asks for softness and repetition: guest-room and villa storage walls, dressing rooms, spa and fitness changing areas, boutique retail back-of-house, and reception joinery that carries display. We have used the same language across whole-floor cabinetry — the Arched Niche & Full House Custom Wall Cabinet Project combines arched display niches with concealed lighting, full-height flush wardrobe panels and an integrated vanity, which is a useful precedent when you want arch detailing to carry through several rooms rather than appear once.

Where the brief is purely utilitarian — high-turnover staff changing rooms, for instance — a flat shaker panel wardrobe or a recessed panel wardrobe usually delivers the same storage with fewer joints to manage. Decide the arch on design grounds, then price it honestly.

Questions worth putting to the supplier in writing

  • Which dimensions are measured by your team on site, and when does that happen relative to flooring and plaster?
  • Can you supply a sample of the arched head detail, painted, before production release?
  • What is the tolerance band for wall flatness and ceiling level, and what does correction cost if we fall outside it?
  • How many units are batched as repeats, and how do you handle one-off rooms in the same order?
  • Which party protects, installs and makes good the wardrobes, and where does your scope end at skirting and cornice?
  • What is on the drawing pack at sign-off: elevations, sections, finish schedule, hardware schedule, packing list?

How a turnkey supplier changes the evaluation

Wardrobes rarely fail alone. They arrive alongside built-in furniture, wall panelling, doors, vanities and lighting that share the same walls and the same site programme. When one supplier holds measurement, production coordination and installation across those trades, the interface questions above collapse into a single accountable scope — which is what our Turnkey Solutions are set up to do, covering design consultation, specification, manufacturing, logistics and on-site coordination. For buyers assembling a package from a China-based manufacturer, that single line of responsibility is usually worth more than a marginally lower unit rate.

Sourced as part of a wider fit-out, the same joinery language can be carried through to custom kitchen cabinets and bathroom fixtures, so arch radii, panel profiles and wood tones stay consistent from wardrobe to vanity.

Before you sign: five documents

  1. Signed shop drawings with dimensions and the arch section detail.
  2. A finish schedule naming substrate, surface and coating system per component.
  3. A hardware schedule with named ironmongery and load ratings.
  4. A scope matrix showing measurement, freight, installation and make-good responsibility.
  5. A change-control clause stating what happens to price and programme after sign-off.

A proposal that carries all five is a production instruction. One that carries none of them is an estimate with a rendering attached — fine to compare, unsafe to build from.