A tall dining cabinet looks simple on a drawing and behaves very differently once it is built, shipped and installed against a real wall. Because the Santerson Tall Dining Cabinet is made to measure rather than picked from a stock catalogue, almost every decision — height, door layout, material, hardware, how it reaches the site — is fixed during the pre-production confirmation stage. The list below is what we ask project owners, builders and designers to settle before we open a cutting file.

1. Confirm the wall first, not the cabinet

A full-height dining unit usually runs from floor to ceiling or close to it, which means the room decides the dimensions, not the other way round. Before any drawing is signed off we want the following measured on site:

  • Floor level and wall plumb across the full width of the run — a tall carcass will expose every millimetre of unevenness at the scribe line.
  • Finished floor build-up, so the cabinet base height matches the final floor level rather than the slab.
  • Ceiling or soffit height, including any skirting, cornice, air grille or downlight that the top of the unit has to clear.
  • Skirting boards, architraves, switches, sockets and radiators in the run, with a note on whether they are being removed or worked around.
  • Door and corridor widths at the destination address, because a full-height assembled unit is not always able to reach the room it belongs in.

Our design team can carry out this site survey and produce 3D renderings before production starts, so the numbers on the shop drawing are the numbers from your building.

2. Decide what the cabinet is for, then set the internal layout

The same footprint serves very different routines. Tell us which job the unit has to do and the interior follows from it:

Intended useLayout points to confirm
Everyday tableware storeShelf spacing for plates and bowls, drawer bank for cutlery, load rating on shelves holding heavy ceramic services.
Display and entertainingWhether part of the front is glass, shelf lighting and its wiring route, and whether shelving is fixed or adjustable.
Beverage and bar stationWorktop material at counter height, space for a wine fridge or coffee machine, power and ventilation positions behind the carcass.
Housekeeping and overflow storageTall items such as trays and table linen, broom or vacuum bays, and whether the lower section needs deeper drawers than shelves.

Where a dining room mixes several of these roles, we often split the wall between a full-height unit and a lower decorative dining cabinet or sideboard, keeping display at eye level and heavier storage below.

3. Lock down materials and finish before colour approval

Panel board, surface finish and edge treatment are what make a built-in read as joinery rather than furniture. Confirm the board type for the carcass and doors, the surface — veneer, lacquer, melamine or wood grain — and the edge detail on visible ends. Then check the sample against the wall paint, flooring and adjacent cabinetry in the actual room light, not only on a screen.

If the tall unit sits next to kitchen cabinetry, wardrobes or wall panelling in the same project, order those pieces from one specification so grain direction, sheen level and handle style match across rooms. This is where ordering dining storage, wall mounted sideboards and the rest of the built-in joinery together removes the guesswork on colour.

4. Specify doors, opening clearances and hardware

  • Hinged, sliding or open front — and how each choice behaves in the room, including the swing arc against a dining chair.
  • Handleless grooved edge or visible pull, which changes the reveal between doors and the facade line.
  • Hinge type and soft-close specification, plus drawer slide rating for the loads you expect.
  • Door height in a full-height unit: ask us how the doors are supported and aligned, so tall fronts stay true after years of daily use.

5. Set lighting and any electrical work early

If the cabinet has illuminated display shelving, the cable route, transformer position and switch location have to be drawn before the carcass panels are grooved. The same applies to an integrated appliance bay: appliance dimensions, ventilation gap and the isolator position all come from your supplier's data sheet, so request them with the layout rather than after production.

6. Agree how it is built, packed and delivered

Tell us early whether you want the unit delivered assembled or in sections for on-site assembly. Sectional delivery is easier to move through narrow corridors and stairwells, while an assembled unit needs less fitting time on site. Either way, agree the package count and the receiving arrangements before booking freight. Our logistics and door-to-door delivery service handles freight forwarding by sea, air or rail, packing and container loading, export paperwork and shipment tracking through to the delivery address, so the team that built the cabinet also arranges how it travels.

7. Installation sequence and site readiness

  • Where the unit falls in the programme — after painting and flooring, or before final decoration at the scribe line.
  • Site access: lift dimensions, stair widths, corridor turns and parking for the delivery vehicle.
  • Who anchors the cabinet to the wall, and what the wall substrate is — masonry, stud partition or tiled surface each need different fixings.
  • Snag and handover inspection once installed, with our installation and after-sales support covering fitting and follow-up.

8. Put it all on one signed shop drawing

Everything above ends up in a single dimensioned shop drawing that both sides sign before production: overall and internal dimensions, door elevations, material and finish codes, hardware schedule, lighting notes, appliance clearances, packing method and delivery address. Read it line by line and mark anything you are unsure of now — once cutting starts, changes become re-work.

A practical check before you send your enquiry: mark up one floor plan with the wall length and height, list what has to live inside the cabinet, name the finishes you want it matched to, and note which other rooms in the project need matching joinery. That single page lets us return a realistic quotation instead of an estimate.

SANTERSON has manufactured custom furniture and building materials for villa, hospitality and office projects since 2008, with site measurement, 3D design, production, delivery and on-site installation handled as one scope. Send us your dining wall dimensions and finish references and we will prepare a made-to-measure tall cabinet proposal for your project.