An open modular wardrobe is one of the easiest built-in items to specify badly. There is no door schedule to hide behind, no hardware list that forces a decision, and no single "model number" that carries the whole design. What you get instead is an open frame system whose bays, shelves, hanging rows and drawer stacks are set per room. That flexibility is exactly why procurement teams need a written record: two projects can order something called Open Modular Wardrobes and receive completely different furniture.

The documentation below is the set we ask buyers, contractors and interior designers to confirm before an open modular wardrobe order is released for production. Everything listed here is a specification field, not a promise — the values come from your drawings and are re-confirmed with the factory before manufacturing starts.

1. Room-by-room schedule, not one line item

A single purchase-order line reading "open modular wardrobe, 4 units" cannot be manufactured. Each installation needs its own entry in a room schedule, keyed to the drawing number and the room name, so that the person assembling on site knows which bay stack belongs to which bedroom.

  • Room and reference code — match the numbering used on the architectural or joinery drawings, so a query in production can be traced back to one wall.
  • Finish elevation per room — an open system is visible from the bed; carcass colour, shelf edge and frame profile all read as design, not background.
  • Quantity of runs per room — a run that wraps a corner or stops at a wardrobe door needs to be recorded as its own run with its own dimensions.
  • Handover sequence — which rooms are needed first, especially where the fit-out is phased across floors or units.

2. Dimensions that must come from site survey

Modular wardrobe ranges such as Drawer Focused Modular Wardrobes and Shelf Focused Modular Wardrobes are made to the dimensions of the space rather than supplied in fixed case sizes. That means the survey record matters more than the catalogue page.

Dimension to documentWhy it changes the build
Finished floor level and finished ceiling height at each end of the runFloors and ceilings are rarely level across a full wall. Record the low point and the high point, not one average.
Wall-to-wall length at top, middle and bottomOut-of-plumb walls change which end carries the scribe or filler panel.
Obstructions: skirting, architraves, switches, sprinkler heads, downlightsAn open frame cannot conceal a switch plate behind a shelf; it has to be routed around on the drawing.
Depth available after doors and bed circulationHanging depth is decided by circulation, not by what the wall allows.
Squareness of the corner where two runs meetA corner that is off 90° needs a cut detail agreed in advance, not on site.
Record dimensions as measured, and record who measured them and when. If the screed or plaster was not yet finished at survey time, note that explicitly — finished-line dimensions are the ones production works to.

3. Internal layout: what goes in each bay

With no doors, the internal arrangement is the visible design. Document it bay by bay rather than describing the wardrobe as a whole. For every bay, note the hanging type, the shelf count and spacing, and whether drawers are built into that bay or supplied as an adjacent module.

  • Single hang or double hang — and the rail height for each, based on the tallest garment in the specification.
  • Shelf spacing — state it as a dimension from the shelf below, not "evenly spaced".
  • Drawer stacks — number of drawers, front height and whether they sit on the floor or on a plinth.
  • Trousers, shoe and accessory fittings — pull-out items need clearance documented before the bay width is fixed.
  • Integrated lighting — if shelf or upright lighting is required, note the driver location and the switch or sensor type, because cabling has to be routed in the panel, not added later.
  • Soft goods and baskets — sizes must match the bay they are ordered for; a basket specified generically will not fit two different bays.

4. Materials, finishes and edges

Open wardrobes expose the carcass material that a hinged or sliding door would normally cover. Document the board type, the surface finish and — most often missed — the edge treatment on every visible shelf end and upright.

  • Panel material for carcass, shelves and backs, stated separately if they differ in thickness.
  • Surface finish — laminate, veneer, lacquer or acrylic, with the reference taken from a physical sample rather than a screen.
  • Edge banding — colour, thickness and whether edges are square or eased. On an open system these edges face the room.
  • Frame material where the design uses a metal frame, as in Metal Frame Open Wardrobes, including the frame colour and profile width.
  • Hardware — rail type and length, drawer runner brand and rating, hinge or slide opening action, all listed per fitting rather than "as standard".

Keep one signed sample board per finish used on the project. When a second phase is ordered months later, that board is the reference both sides work from, and it prevents a colour being re-specified from memory.

5. Fixing method and interface with the building

Wall-mounted open systems put load into the wall, so the fixing record is a structural question rather than a joinery detail. Document what the wall is made of, what the fixing is, and who signs off that interface.

  • Substrate at every fixing point — masonry, stud partition, steel frame or tiled surface, confirmed by survey or by opening up.
  • Fixing type and centres, plus whether a top rail, cleat or concealed bracket system is used.
  • Load assumptions for hanging garments and shelves, agreed with the engineer where the wall is not masonry.
  • Anti-tip and restraint requirements for each installation, listed by room.
  • Interface trades — who supplies and connects the lighting circuit, and who makes good around the run after installation.

6. Tolerance, scribing and what is done on site

Decide in writing which gaps are closed in the factory and which are closed on site. That single line in the specification removes most of the arguments during installation.

  • Scribe or filler panels — where they appear, their width range and their finish.
  • Cut-backs around skirting or cornice, with a detail drawing for each condition.
  • On-site trimming allowance, and who is responsible for finishing any cut edge on site.
  • Sealing expectations at the wall line, if required.

7. Packaging, delivery and handling

Modular wardrobes arrive as panel bundles, not assembled cases. The delivery record should say how those bundles are labelled and where they can be stored before installation.

  • Pack labelling by room code and run, matching the schedule in section 1, so crews do not open the wrong bundle.
  • Pack list per bundle, including loose hardware kits and their corresponding bays.
  • Delivery sequence where rooms are being fitted out in stages or across floors.
  • Access route and storage on site — flat, dry, internal storage, with the floor able to take the load.
  • Inspection window, with damage photographed against the pack label before the crew signs off.

Where a project is being furnished from overseas, this is also the point at which shipping documents and delivery terms should be tied to the room schedule. A container that arrives in the wrong sequence costs more in site time than it saves in freight; coordinating that with Logistics & Door-to-Door Delivery before production is released is far cheaper than re-sorting bundles at the loading bay.

8. Approval record before production starts

Open modular wardrobes are made to order, so changes after release are re-manufacture rather than adjustment. Freeze the design with a documented approval pack.

  • Shop drawings for every run, dimensioned, signed and dated by the party entitled to approve them.
  • Finish board reference, quoting the sample code on the drawing itself.
  • Fitting schedule cross-referenced to bay numbers.
  • Named approver and date for each room, so a later query has an owner.
  • Change log, recording every revision after the first issue, with who requested it.

9. Snagging and handover documentation

Close the package with the same discipline you opened it with. The handover file should let a facilities team or a future owner understand what was installed without opening the wardrobe.

  • As-built schedule reflecting any site changes, issued against the original room codes.
  • Snag list by room, with sign-off against each item.
  • Spare parts and hardware reference for runners, rails and brackets, so replacements can be ordered later.
  • Care and cleaning note for the finish used, since open shelves show handling marks that doors would have hidden.
  • Warranty terms as actually issued, with what is covered and what is excluded stated in writing rather than summarised.

A short checklist for the next enquiry

If you are preparing a request for quotation, sending these items with it will get you a comparable price across suppliers and avoid a re-drawing cycle:

  • Room schedule with run lengths, heights and quantities
  • Bay-by-bay internal layout with hanging, shelf and drawer breakdown
  • Panel material, finish reference and edge treatment per component
  • Fixing method and substrate at each wall
  • Scribing and on-site trimming responsibilities
  • Pack labelling and delivery sequence
  • Approval and change-control process before production release

SANTERSON supplies Open Modular Wardrobes and related ranges including Minimalist Open Wardrobes, Combination Modular Wardrobes and Hanging Modular Wardrobes, each specified to project dimensions, layout and finish rather than fixed case sizes. Send us your room schedule and drawings and we will return shop drawings for review before anything enters production — with Custom & OEM Service available where a project needs a bespoke finish, profile or fitting arrangement.

Working on a villa, apartment or hospitality fit-out and need wardrobe documentation reviewed before you order? Send your drawings and the room schedule above to SANTERSON and we will confirm dimensions, materials and fixing method with you before production is released.