A swim spa on a hotel terrace or in a resort garden has to work twice over: it is an amenities feature guests pay to use, and it is a piece of building services that your contractor has to lift into place, wire, plumb and maintain. Outdoor Swim Spa WS-S07M sits in the middle of our configurable swim and hydrotherapy range at exactly the size most hospitality projects can actually accommodate — a 7 m shell with a narrow 2.2 m width that fits between structural columns, plant rooms and landscape beds. This guide walks through the specification checks we ask hotel buyers to complete before confirming an order.

Start With the Room Around the Shell

The catalog dimensions for this model are 7000 × 2200 × 1480 mm. Read them as three separate constraints rather than one number:

  • Length (7000 mm) sets the minimum clear run on a terrace or in a garden deck. Allow working clearance at both ends for access panels and for guests entering the water.
  • Width (2200 mm) is what usually decides whether a spa can be installed at all. It is narrow enough to pass most service corridors and lift lobbies on upper-level terraces, but you still need to confirm the delivery route from the loading dock.
  • Depth (1480 mm) determines how much of the shell sits above the finished floor when it is installed above ground, and how deep an excavation is needed if the project sinks it into a deck.

For a fit-out team these figures drive three drawings: the structural loading note, the electrical distribution schedule and the drainage run. Send your architect the catalog dimensions early rather than at tender stage, because a spa installed late in a programme almost always costs more than one planned from the first layout.

Read the Equipment List Against Your Guest Offer

The captured specification for WS-S07M lists one control system, three water pumps, one filter pump, 40 jets in total, two LED lights and a total power figure of 10.75 kW. The features shown on the product page are water jets, LED lighting, ozone, a waterfall and four water columns.

That combination points at a specific guest proposition: hydrotherapy volume rather than lap swimming. Forty jets distributed across the shell support a spa-style experience — massage stations for two or three guests at a time — while the waterfall and water columns give the pool deck its visual character, which is what photography and marketing material usually sell. If your brief calls for continuous counter-current swimming as the headline feature, look at models in the range that carry a swim training system instead; the captured specification for WS-S07M does not list one.

Two items deserve particular attention during coordination:

  • Total power of 10.75 kW is a substantial load for an outdoor location. Confirm the supply available at the intended position, and confirm with us which configuration that figure reflects — heat pumps and additional pumps are optional items and change the connected load.
  • Three water pumps plus one filter pump means plant noise and access panels need thinking about. Position the equipment side away from guest room windows and keep every pump reachable without removing deck finishes.

Decide the Optional Equipment Before Order, Not On Site

The catalog lists control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps as options. Availability and compatibility vary by model, so the selected configuration has to be confirmed before ordering.

For a hotel this decision is commercial as much as technical. A spa in a temperate or cool climate needs a heat pump and insulation specified up front if you intend it to stay open year-round; adding either after manufacture means new electrical capacity and a plant area that was never sized for it. UV sterilization and sand filtration change the daily chemical routine your housekeeping team follows, which affects staffing as well as consumables. Steps are not a small detail either — guest accessibility and safety around a 1480 mm deep shell usually sit in the risk assessment.

Send us the operating pattern you have in mind — opening hours, expected guest load, water temperature target and who maintains the unit — and we will confirm which options belong in your configuration.

Coordinate It With the Rest of the Outdoor Package

A swim spa rarely arrives alone. Poolside loungers, shade structures and the hard landscaping around the deck are usually procured by the same buyer on the same schedule, and separating them creates the classic fit-out failure: a spa delivered to a terrace where the pergola footings have already been poured.

SANTERSON works as a hotel furniture and interior fit-out supplier, so the swim spa can be coordinated in one package with outdoor furniture for villas and resorts — aluminium frames, rope weave, wicker and teak-look tops that suit poolside settings — together with the lighting, wall finishes and sanitary fixtures used elsewhere in the building. The swimming pools and swim spas category covers the wider range if your site needs a longer shell or a different feature mix.

Our services cover design consultation and space planning, material selection and product specification, manufacturing and quality control, then freight by sea, air and rail with customs paperwork through to door-to-door delivery, followed by installation support and after-sales service. For projects in Australia we have delivered villa and interior fit-out work in Sydney, Melbourne, Perth, Willoughby and North Turramurra; import terms, duties and delivery scope are confirmed case by case rather than assumed.

A Five-Point Checklist Before You Confirm

  1. Delivery route — measure the path from kerb or loading dock to the final position against 7000 × 2200 mm, including lifts, gates and turns.
  2. Electrical capacity — verify the supply against the connected load of the confirmed configuration, with allowance for optional heat pumps.
  3. Drainage and overflow — confirm the drainage run and any plant-room requirement before deck finishes are set out.
  4. Guest proposition — decide whether hydrotherapy jets, waterfall and water columns serve your guests better than a swim training system.
  5. Maintenance plan — agree who operates the filtration and dosing regime, and which sterilization option supports it.

Once those five points are settled, the specification locks cleanly and the spa stops being a late variation. Send us your drawings, target configuration and site location and we will confirm equipment inclusion, electrical requirements and delivery scope for your project.