A pocket door saves floor space, but it also touches the wall cavity, the framing, the hardware and the finish schedule. That is why an enquiry about Classic Pocket Doors goes much faster when the drawings, openings and finish decisions are already in front of the supplier. The checklist below covers what to gather before you write, and what a made-to-measure manufacturer will ask you for at each stage.

1. Drawings and the opening itself

Pocket doors are built around the wall, so the supplier works from dimensions rather than a catalogue size. Before contacting us, have these ready:

  • Floor plans or room elevations showing every doorway planned as a sliding opening.
  • Rough opening width and height for each opening, plus the finished floor level.
  • Total wall thickness and how the wall is built — stud framing, masonry or a partition that still has to be framed.
  • Clear pocket depth available behind the opening, and what sits inside that wall: pipework, wiring, insulation or structural members that must be moved or avoided.
  • Ceiling height and any cornice, skirting or head trim that the door has to clear.

If the openings are not framed yet, say so. It changes whether we quote a door only or a wall system that includes the pocket frame and the surrounding build-up.

2. How the door will actually be used

Usage drives the hardware and the panel build, not just the look. Tell us:

  • Which rooms are involved — bedroom, ensuite, pantry, study, laundry or a guest suite.
  • How often the doors open, and whether children or guests will use them daily.
  • Whether you need privacy and some sound separation, or simply a flexible opening.
  • Handing and stop direction: which side the pocket is on, and whether two panels meet in the middle.
  • Hardware preference — recessed pull, edge pull, soft-close, or a magnetic catch.

3. Style, material and finish decisions

Our Classic Pocket Doors are made to measure, with material and finish options and a layout tailored to the project. The more specific you are here, the closer the first quotation lands to the final price.

DecisionWhat to confirm before the enquiry
Panel designPlain slab or moulded/paneled; number of rails and stiles; whether the door should read as part of a classic joinery set.
SurfacePainted finish, wood veneer or laminate, and the colour or grain reference you are working to.
Matching joineryWhich wardrobes, cabinets or Classic Panel Hinged Doors share the same finish and profile.
Other openings in the same jobWhether some doorways are better solved with Classic Folding Doors, so one order covers both.
SamplesWhich finishes you want to see physically before the panels are made.

4. Scope, quantities and the programme

Manufacturing starts after your drawings are confirmed, so dates matter as much as sizes. Please include:

  • A door schedule: opening reference, quantity, width, height and finish for each unit.
  • Photographs or a video walkthrough of the site, especially where existing walls are involved.
  • Your target installation date and any trade milestones that sit around it — plasterboard, flooring, paint, joinery.
  • Whether this is one villa, an apartment, or several units repeated across a project.
  • Whether other items come in the same order: wardrobes, vanities, kitchen cabinets, Flush Wall Aligned Doors, flooring or lighting.

Grouping doors with the rest of the fit-out is usually where a single supplier saves the most time on site, because finishes and profiles are coordinated from one set of drawings instead of three.

5. Delivery, access and installation

Sliding panels and pocket frames are long, flat and easily damaged at the edges, so logistics need a short think before dispatch:

  • Delivery address, port or site, and who signs for the goods.
  • Access conditions: lift size, stair width, turning radius, gate height, or whether panels must be carried up.
  • Storage on site — panels should stay flat, dry and off the floor until hung.
  • Who installs: your own builder, a joiner, or our team with on-site guidance. Share the fixing details with whoever hangs the doors.
  • Whether you want the spare hardware and adjustment parts packed separately and labelled.

6. Your questions in writing

Send the open points as a numbered list so nothing gets answered at half strength. Typical ones we see:

  • What is the minimum wall thickness each configuration needs?
  • Can the pocket frame be supplied with the panels, or does the local builder build it?
  • How are adjustments and hardware replacement handled after handover?
  • What comes back to you for approval before production starts?

A simple enquiry template. Project name and location · opening schedule with sizes and quantities · wall build-up and pocket depth · finish reference and matching joinery · target installation date · delivery address and access notes · your questions. That single message is usually enough for us to come back with a workable specification instead of another round of questions.

Dimensions, wall requirements and selected specifications are confirmed project by project before manufacture, so treat the figures on your drawings as the starting point rather than a fixed standard.

If you already have drawings but no door schedule, send what you have. We work from plans and elevations every day and will tell you which openings suit a sliding pocket, which suit a hinged or folding door, and where a concealed flush detail gives the cleaner line.