In villas, serviced apartments and mid-rise residential projects, the laundry rarely gets a room of its own. It is squeezed into a bathroom alcove, a corridor cupboard or a corner of the ensuite, and it has to work alongside vanities, storage and services that were already fixed on the drawings. That is exactly the situation our Compact Laundry Solutions range in the Laundry Integration collection is made for: made-to-measure units where finish, layout and dimensions are specified per project rather than chosen from a fixed catalogue.
Because these units are custom-built, the quality of the result depends almost entirely on what the buyer puts in front of the factory before production starts. The questions below are the ones we ask on real projects, and answering them early is what separates a laundry that fits cleanly on site from one that arrives and needs rework.
1. The appliance you are designing around
A compact laundry is built around a machine, so the appliance decision comes first and drives everything else. Tell us the make and model, or at least the envelope dimensions, door swing direction, water inlet and outlet position, and whether it is front-loading or top-loading. Front-loaders can be shut into a cupboard with a door that closes over them; top-loaders need clear headroom above the lid, which rules out an overhead cabinet in the same bay.
If the appliance has not been selected yet, say so plainly and we will design to a reserved envelope instead of guessing. What you should avoid is ordering cabinetry against an assumed machine size — that is the most common cause of on-site trimming.
2. Exact enclosure dimensions and clearances
Send the finished opening, not the structural one: width, height and depth measured to the completed wall and floor finishes, with the position of any skirting, tile bedding, door reveal or pipework that reduces usable space. In tight bathrooms a 15 mm difference between the rough opening and the finished opening is enough to stop a carcass closing properly.
Also state the clearances you need around the machine — for hose connections at the back, for ventilation at the sides, and for the door or panel in front when it swings open. Where the space is genuinely narrow, this is the point to decide between a single stacked column, a side-by-side WasherDryer Cabinets arrangement or a Stacked Laundry Units configuration. The layout choice is not cosmetic; it changes the carcass, the load path for overhead cabinets and where the services can run.
3. Door, panel and access type
In a compact laundry the access method decides how usable the space actually is. Discuss with us whether the unit will be left open, closed with hinged doors, concealed behind a bi-fold or sliding pair, or aligned flush with the surrounding wall panelling so it disappears into the joinery. Each option has different requirements for hinge fixings, track support and the gap tolerance around the opening.
Two practical points are worth raising at this stage. First, whether the doors need to be handleless or recessed-pull, because in a narrow corridor a protruding handle blocks circulation. Second, whether the finished front should match the adjoining wardrobe, vanity or wall panels — matching grain, sheen and edge profile across trades is far easier to specify from one manufacturer than to reconcile later.
4. Material and finish specification
Bathrooms and utility corners are humid, and laundry cabinetry sits close to splashing water, detergents and occasional spills. Specify the board, the surface and the edge treatment explicitly rather than naming a colour alone: matte or high-gloss lacquer, acrylic, melamine, veneer, PVC-wrapped or aluminium-framed fronts all behave differently near moisture and all price differently. We supply material and finish options per project, and we will confirm which substrates and edge banding we recommend for the environment you are building into.
Ask us for a physical sample of the exact front and carcass colour before sign-off, and confirm how hardware — hinges, runners, handles, soft-close fittings — is specified and supplied. Hardware grade is easy to overlook in a schedule and is the first thing a resident notices.
5. Internal layout and storage
The inside of a compact laundry does most of the work. Decide what actually has to live there: detergent and cleaning supplies, an ironing surface, a hanging rail for shirts, baskets for dirty laundry, or a fold-out worktop for folding. Then choose the internal elements that suit those habits — adjustable shelving, drawers, Pull Out Laundry Hampers set into a base cabinet, or an adjacent Laundry & Storage Combo when the machine bay itself is too small to carry the household's storage load.
Where the laundry wall is short but tall, a Multi Function Tall Cabinets layout usually earns its space back, because it stacks appliances, storage and hanging in one column instead of spreading them across the room.
6. Services coordination: plumbing, power, ventilation
Send us the service locations on your drawing: water inlet and drain position, the power outlet and whether it needs to stay reachable behind or beside the machine, plus any exhaust duct or vent requirement for a dryer. We build the carcass with the notches, cut-outs and back-panel treatment those positions demand. If services move after our drawings are approved, expect a change order — the cut-outs are made in the factory, not on site.
If your team has not yet fixed the plumbing layout, that is a good reason to bring us in through Interior Design Services, so the laundry layout, the adjoining bathroom fit-out and the service routes are settled together before joinery drawings are issued.
What to send before we quote
- Finished-opening dimensions — width, height, depth — plus floor and wall build-up.
- Appliance model or reserved envelope, loading type and door swing.
- Preferred access: open, hinged, sliding, bi-fold or concealed flush panel.
- Front finish and carcass finish, with the adjoining joinery you need to match.
- Internal layout: shelves, drawers, hampers, hanging, worktop.
- Service positions for water, drain, power and ventilation.
- Quantity per unit type and the project's delivery destination.
| Decision | What changes if it moves late |
|---|---|
| Appliance model or loading type | Carcass height, overhead cabinet position, door and panel arrangement |
| Finished-opening size | Cut-outs, scribes, floor fixings — usually rework rather than adjustment |
| Door type | Track and hinge support, wall reinforcement, front clearance |
| Material and finish | Lead time and price; moisture performance in the finished room |
| Internal layout | Runner positions, load rating of shelves, hamper openings |
| Service positions | Back-panel notches and ventilation provision, made in factory only |
Dimensions, finishes and hardware are confirmed project by project. We do not publish fixed sizes or performance figures for this collection, because each unit is built to the space it is going into.
How this fits a whole-project order
Laundry joinery is rarely an isolated purchase. On villa and residential projects we supply it alongside vanities, tall cabinets, wardrobes, kitchen cabinetry and the bathroom fixtures around them, which means one set of drawings, one finish schedule and one production run. As a One-stop Furniture and Building Materials Supplier, we handle that scope from specification through manufacturing and quality control, then arrange Furniture Logistics and Door-to-door Delivery to site.
If you need the laundry designed rather than merely sized — layout options, how it reads against the adjoining bathroom, what fits given your riser positions — that is handled under Custom Furniture Design and Prototyping before anything goes into production. Send us your drawings, appliance selection and finish preference, and we will come back with a specified unit you can approve.
Talk to us about your laundry layout. Share the finished-opening dimensions, your appliance choice and the finishes you are matching, and our team will specify a compact laundry solution for your project — with the adjoining bathroom and storage joinery priced on the same schedule.