A design brief for a bedroom joinery package usually arrives as a mood board, a couple of marked-up floor plans and one sentence: "we want something rustic, but not farmhouse." That sentence is where most wardrobe enquiries stall. This guide shows buyers, designers and project managers exactly what to send so a Rustic Solid Wood Wardrobes enquiry comes back with a usable quotation instead of another round of questions.

Why rustic solid wood wardrobes need a different brief

Rustic sits at the awkward end of the joinery spectrum. The look depends on grain character, surface texture and edge detailing - the parts of a specification that are hardest to describe in words and easiest to misread across an ocean. A melamine wardrobe enquiry can survive on a colour code and a set of dimensions. A solid wood one cannot, because two panels cut from the same collection can read completely differently depending on cut, grain orientation and finish.

The other difference is scope. Our built-in furniture is made to measure for the room it belongs to, so the brief has to carry the room as well as the door. Send the four items below and the quotation you receive will be close to final.

The four documents a good enquiry contains

1. A dimensioned plan, not a photograph of a plan

Send a scaled drawing with overall wall lengths, room height, and the position of every fixed constraint: skirting boards, architraves, light switches, air-conditioning returns, power points, heating zones, and any sloped ceiling. Note the floor finish too - a bedroom that still has a screed down will not give you a true finished height, and a wardrobe ordered off a bare-slab measurement will not sit flush on handover.

If your drawing package already shows the wardrobe as joinery, send that page with the joinery key. If it does not, mark the intended run on the plan and state whether the unit is floor-to-ceiling or a freestanding height.

2. A finish reference you can point at

"Rustic" needs an anchor. The most useful references, in order of reliability: a physical sample you already hold; a project or supplier reference with the finish name; then photographs, which are the weakest because camera and screen both shift colour and warmth. If photographs are all you have, send three of them - one daylit, one under artificial light, one close-up of the surface - and say which of the three is the true target.

Then name the texture you want along with the colour: sawn or wire-brushed grain, a hand-distressed edge, a low-sheen open-pore topcoat. Those details decide whether the piece reads as rustic or simply as brown timber.

3. An interior layout list

The inside of the wardrobe is where budget is won or lost. Give us a simple room-by-room list rather than a picture: hanging length required, full-height versus double hanging, drawer count and whether drawers sit in the base or at waist height, shelving spans, shoe and linen storage, an ironing or safe provision, and interior lighting with its switching point. A short list of this kind is enough to price accurately, and it lets us flag where a run is too wide for a single shelf before it becomes a site problem.

4. Doors, hardware and opening geometry

State the door type - hinged, sliding or an open front - the number of doors across the run, and the clearance in front of the unit. Hinged doors need swing room; sliding doors need a track depth and a wall return to pocket into. Confirm whether handles are required or whether you want a routed edge, because that choice changes the door profile on a rustic elevation more than any other single detail.

What we confirm back before production

Once the enquiry is with us, our design and production team works through it in the order our project service is set out: brief and proposal first, then quotation and detail confirmation, then production. For a rustic solid wood package that review covers the following.

Item reviewedWhat you receive back
Dimensions against the planA make-up drawing showing finished sizes, scribe and filler panels where walls are out of plumb, and clearance for skirting and architrave.
Material and finishThe species and construction we propose for your elevation, with the finish built up as a sample you can approve before the run is cut.
Interior layoutA shelf, rail and drawer schedule with spans noted, so load-bearing shelves are specified rather than assumed.
Doors and hardwareDoor count, opening direction, profile and ironmongery schedule, including the hinge grade we recommend for the door weight.
Site sequenceWhere the unit fits in your programme - what has to be complete on site before the carcasses land.

One point worth stating plainly: species, panel construction and finish are confirmed per project, not fixed in advance. The rustic collection is specified to the job, so treat any material or thickness figure you see quoted elsewhere as a question to ask rather than an answer.

Matching the rustic look to the rest of the joinery package

Wardrobes rarely travel alone. On villa and apartment packages we usually produce them alongside cabinetry in the same timber, which is where a single brief saves real money: one material decision, one finish batch, one shipment. If your rustic wardrobe has to sit next to a bedroom media wall or a hall cupboard, send both elevations together so the grain and topcoat are specified once.

Where the design intent is warmer but cleaner than rustic, the same made-to-measure process applies across the wider Walnut Solid Wood Wardrobes and Oak Solid Wood Wardrobes ranges, and a shaker or recessed panel door often resolves the "rustic but not farmhouse" brief faster than any finish note. Where the room layout allows a separate storage space, an Boutique Style Walk in Wardrobes layout may give you more usable storage for the same footprint than a door-fronted run.

Delivery, site readiness and handover

Built-in joinery fails on site far more often than it fails in the factory, and almost always for reasons that were visible in the brief. Before your units ship, confirm three things in writing: the finished floor and wall levels are achieved where the unit lands; the opening dimensions on site match the make-up drawing we returned; and any services that pass behind the carcass are first fix complete and tested.

We handle packing, container loading and door-to-door delivery as part of project work, and installation and after-sales support sit at the end of the same workflow. Tell us who is installing - our team or your joiner - because that determines whether we deliver knocked-down carcasses with a fixing detail or assembled units sized to pass through your doors.

A short enquiry template you can copy

  • Project: location, building type, number of bedrooms in scope, target on-site date.
  • Drawings: dimensioned plan plus any existing joinery elevation pages.
  • Finish: sample reference or three photographs, plus the texture and sheen you want.
  • Interior: hanging, drawer, shelf and lighting list per room.
  • Doors: type, count, clearance in front, handle preference.
  • Package: any other cabinetry to be produced in the same material.
  • Installation: who installs, and what site conditions are already fixed.

Send those seven lines with your drawings and a rustic wardrobe enquiry moves straight into design and quotation. Start from the Rustic Solid Wood Wardrobes product page, attach your plan, and tell us which finish reference is the true target.

Common questions before an enquiry goes out

Can we enquire without final drawings?

Yes, but expect a budget-level answer only. Without finished levels and wall lengths we can advise on layout, door type and likely cost band; we cannot return a make-up drawing or release a run into production.

Is rustic the same as reclaimed?

No. Rustic describes grain character, surface texture and edge detailing on new timber. Reclaimed is a material source with its own dimensional and moisture constraints. Say which you mean, because the specification differs.

Should we send one wardrobe or the whole apartment?

Send the whole package if it exists. One brief covering wardrobes, cabinetry and other built-in storage lets us specify the timber and finish once and consolidate production and freight.