A mixed open and closed storage wall looks simple on a drawing: some shelves, some doors, one continuous finish. In production it is anything but simple. Before Santerson Mixed Open & Closed Storage enters manufacturing, the dimensions, carcass and door specification, hardware, finishes and interface with the building all have to be signed off together. This article sets out what a buyer or contractor should confirm, in the order it actually matters.

1. Survey data: which wall, and how flat is it

Integrated storage walls are made to the space, so the site survey is the first document worth checking. Send a dimensioned drawing that shows the full run length, floor-to-ceiling height at several points along the wall, the position of skirting, cornices, architraves and any protruding reveals, plus the location of sockets, switches, light points, radiators and air-conditioning grilles.

Two details cause most rework later. First, out-of-plumb walls: a run measured at one height can differ by several millimetres top to bottom, and a full-height unit will show that difference as a visible gap unless scribing or a filler panel is designed in. Second, floor levels. If the finished floor is not level, the base line of the unit has to be set out on site, and the drawing should say who sets it out — the fitter or the manufacturer's detail.

Confirm the state of the wall at handover as well. Plasterboard alone will not carry a heavy full-height carcass; solid wall, timber studs or a designed batten backing each need different fixings. State this in writing before production starts, not on delivery day.

2. Layout: what goes behind the doors and what stays open

The open-to-closed ratio is a use decision, not a styling one. Walk through what will actually live in the unit — hanging, folded linen, books, glassware, vacuum cleaners, luggage — and then fix the internal layout shelf by shelf.

  • Open sections: confirm shelf depths, clear heights and whether shelves are fixed or adjustable. Adjustable shelving needs a pitch that suits tall items without looking repetitive.
  • Closed sections: confirm door type (hinged, sliding, lift-up), opening direction and clearance in front of the unit, especially in a corridor or in front of a doorway.
  • Internal fittings: drawers, pull-out trays, trouser pulls, integrated laundry hampers and dividers each change the carcass width, so they must be chosen before the cut list is issued.

Where a wall sits in a living area rather than a utility space, the matching Santerson Mixed Open & Closed Systems range follows the same open-and-closed logic in modular living configurations, which helps when one finish has to carry across several rooms. If the brief calls for a wall that runs without interruption from floor to ceiling, compare it against Santerson Full Height Storage Walls before fixing the elevation.

3. Carcass, doors and material specification

Ask for the specification in writing, item by item: board type and thickness for the carcass, backing, door construction, edge treatment and the surface material — laminate, lacquer, veneer or solid timber. Two units can look identical in a render and differ completely once you compare board thickness, edge banding quality and veneer matching.

For doors, confirm the flatness tolerance and whether the door is a single piece or built up, since a tall door that spans floor to ceiling needs either an anti-warp construction or a supporting hinge arrangement. If the design includes glass — clear, bronze, smoked or ribbed — confirm the glass thickness, edgework and whether the frame is aluminium or timber.

4. Hardware: hinges, runners and opening effort

Hardware decides how the unit feels after two years more than any finish does. Confirm the brand and model line of hinges, drawer runners and slides on the order document, together with load ratings and cycle ratings where they are stated. Specify soft-close or push-open for every opening that will be used daily, and confirm whether integrated handles, a routed profile or a handleless recess is being used, because that choice affects the reveal between doors.

For sliding sections, ask what track and hanger system is supplied, how the door is adjusted after installation, and how the bottom guide is fixed to the floor finish. For bi-fold and pocket arrangements, confirm the required wall pocket depth before the partition is built.

5. Lighting and services inside the unit

If shelves or niches are lit, this has to be resolved before panels are cut. Confirm fitting positions, cable routes, driver location and how the driver will be reached for replacement, plus the switching arrangement — door-activated, touch, remote or a wall switch. Where Santerson Integrated Cabinet Lighting is part of the specification, agree colour temperature and output so lit open shelves match the room lighting rather than fighting it.

Also confirm whether anything else passes through the carcass: sockets for a TV or coffee station, low-voltage cabling, or ventilation for enclosed appliances. Cutting a finished panel on site is slower and messier than allowing for the opening in production.

6. Finishes and how they will be matched

Never accept a finish described by name alone. Approve a physical sample of the door surface, the carcass edge and, where relevant, the veneer cut, and keep that signed sample as the reference for delivery. For veneered work, confirm grain direction and matching between doors on one run; for painted or lacquered work, confirm sheen level in the room's own light.

Confirm how the unit meets adjacent finishes — floor, ceiling, side wall and any skirting that continues through — and record it on the drawing as a dimensioned junction detail. This is where a made-to-measure job either disappears into the architecture or reads as furniture pushed against a wall.

7. Production, packing and site sequence

Before releasing the order, get a written production slot, a component list showing how the run is sub-divided for delivery, and packing that protects door faces and edges in transit. For multi-apartment or hotel work, confirm that each unit is labelled by room number against the room-by-room schedule, so nothing arrives on the wrong floor.

Agree where the units fit in the site programme: wet trades finished, floor covering laid or deliberately held back, first-fix electrics complete. Then confirm who installs, who inspects and how any snags are recorded and closed out. SANTERSON's stated service scope runs from design coordination and custom/OEM production through door-to-door delivery to installation and after-sales support — see OEM Furniture Manufacturing, Furniture Logistics and Door-to-door Delivery and Furniture Installation and After-sales Support. Which of those steps sit inside your quotation, and where responsibility passes to your own trades, should be written into the purchase order.

Pre-production sign-off checklist

SurveyRun length, heights at several points, floor levels, services located and marked on the drawing.
LayoutShelf positions, clear heights, internal fittings and door swings approved on a dimensioned elevation.
MaterialsCarcass board, door construction, surface material and edge treatment listed by item.
HardwareHinge, runner and slide lines named; soft-close or push-open specified; adjustment method stated.
LightingFitting positions, driver access, colour temperature and switching agreed before panels are cut.
FinishSigned physical sample retained; junction details to floor, ceiling and wall drawn.
DeliveryProduction slot, component list, packing standard and room-by-room labelling confirmed.
ResponsibilityInstall, inspect and snag-close roles named in the purchase order.
A note on figures: dimensions, board specifications, hardware models and finish names for this range are set per project. The product listing describes configurable layout, dimensions and finishes rather than a fixed specification, so treat every number in your own order documents as the authority and ask us to confirm it against the drawing before cutting begins.

Ready to release an order

Send the survey drawing, the room schedule and a photograph of the wall as it stands today. We will mark up the elevation, flag anything that is not buildable as drawn, and return a specification you can sign off line by line before production starts.