A wall-hung vanity looks clean and makes a small guest bathroom read larger, but on a hotel job it also has to survive housekeeping carts, guest abuse and years of resealing. Here is how buyers and project teams specify the Santerson Floating Vanity so the unit you approve on a sample board is the unit that arrives on site.

Santerson's floating vanity sits in the Vanities collection. The catalogue entry is deliberately simple: it is a configurable, wall-hung vanity with made-to-measure sizing, selectable materials and finishes, and a layout tailored to the project. That is exactly why the specification sheet matters more than the model name. Two identical guest-room towers can order the same design in different sizes, finishes and basin combinations, and each one is built to that room's drawing.

What "configurable" means when you are buying 120 sets

For a hotel fit-out, a floating vanity is not a single SKU. It is a family of dimensions repeated across floor types. Before you request a quotation, lock down the variables that change price and lead time:

  • Carcase size per room type. Standard guest rooms, suites and accessible rooms rarely share one width. Measure from the finished wall face, including tile build-up, not from the blockwork.
  • Wall build-up and fixing substrate. A floating unit carries its own weight plus countertop, basin and stored goods. Note whether the backing is stud framing, brick, or a service duct, and who supplies the reinforcement.
  • Basin and countertop pairing. Choose from the matching undermount basin, vessel basin (above counter) or integrated basin lines, because the cut-out, overflow and tap reach differ with each.
  • Storage layout. Drawers, open niches or a mix. Housekeeping preferences and guest profile should drive this, not aesthetics alone.
  • Finish and edge detail. Sample the finish on a physical board under the bathroom's actual lighting before signing off.

How the floating vanity fits alongside the other vanity options

Most hotel packages mix types by room category. This is how the Santerson vanities collection usually divides up on a project:

Vanity typeWhere it works in a hotelSpecification point to settle early
Floating VanityGuest bathrooms, compact ensuites, corridors of repeating rooms where a clean floor line speeds moppingFixing substrate, set-out height, trap position behind the wall
Single VanityStandard guest rooms and staff or gym washroomsCountertop depth versus circulation space at the door swing
Double VanitySuites, family rooms and flagship bathrooms where two basins are a selling pointTwin waste runs, mirror width, tap-set spacing
Integrated Countertop VanityHigh-traffic bathrooms where joint-free cleaning matters more than stone appearanceCountertop and basin material, splash zone to the mirror

Keeping one supplier across all four types means finishes, hardware and drawer fronts match room to room, and one set of shop drawings covers the whole bathroom package.

Coordination items that decide whether installation goes smoothly

  • Set-out drawings before first fix. Confirm hanging height, basin centre lines and waste locations on a room-by-room schedule, then issue them to the M&E contractor before the wall is closed.
  • Waste and trap access. A floating carcase hides the trap; make sure the access panel or the wall itself allows future servicing without removing the unit.
  • Mirror and lighting alignment. Pair the vanity with vanity lighting and, where specified, a LED mirror cabinet, so the mirror centre, the light outlet and the basin centre all sit on one line.
  • Adjacent ceramics. If the same bathroom carries a wall-hung WC from the ceramics range, its frame depth affects the recess the vanity has to clear.
  • Around the rest of the building. Because the same supplier handles interior fixtures, wall panels, flooring and joinery, one coordination round covers the bathroom, the bedroom cabinetry and the public-area finishes instead of three separate ones.

A practical checklist for your RFQ

  • Room-by-room schedule: type, width, depth, height and quantity for every vanity.
  • Written finish selection with a signed physical sample reference.
  • Confirmed basin, countertop, tap reach and overflow type per configuration.
  • Fixing detail agreed with the main contractor, including substrate reinforcement.
  • Spare-parts plan: replacement drawer fronts, handles and hinges held for the operating years.
  • Delivery destination, packaging schedule and container loading plan by floor or room block.

Product dimensions, material options, hardware and installation requirements on the Santerson product pages are configuration-dependent. Confirm each selected specification in writing for your project before ordering; do not assume a figure shown on a sample board applies to every room type.

Why buyers bundle this with one supplier

Santerson is a China-based manufacturer and one-stop supplier of furniture and building materials, operating since 2008, with services covering design coordination, custom and OEM production, door-to-door logistics, installation support and after-sales service. For a hotel or serviced-apartment job, that means the vanity, the wardrobes, the wall panelling and the loose furniture can be produced against one set of approved finishes rather than matched after the fact through hotel furniture and interior fit-out packages.

The practical benefit is administrative as much as visual: one specification document, one production schedule, one shipping plan and one point of contact for snags after handover.

Send us your bathroom schedule

Share the room-by-room vanity list, target finishes and delivery destination, and we will quote the floating vanity configuration against your drawings — with sample boards before production.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Enquire through the contact page