A handleless concealed door looks effortless once it is installed: a flush, unbroken wall surface with no visible frame, no architrave and no hardware. That quiet result is exactly why it fails loudly when it is coordinated late. If the opening, the floor level or the panel finish is decided after the joinery and wall cladding are fixed, the door stops being invisible and becomes a snag list. This guide walks through how we coordinate Santerson Handleless Concealed Doors with design drawings and site conditions, stage by stage, so the opening is right the first time.

Why this door type is a coordination job, not a purchase

Concealed doors are specified as part of a wall build-up rather than dropped into an existing opening. Three details carry the whole visual result:

  • The flush plane. The leaf has to sit in line with the finished wall face, not the structural wall. That means the reveal depth must account for plasterboard, render, tile, panel or stone thickness — plus adhesive.
  • The invisible edge. Handleless operation relies on a push mechanism, an integrated groove or a recessed edge. None of that works if the surrounding cladding is packed out to a different tolerance than the door was drawn for.
  • The finish match. On a project where the door and the wall are clad in the same veneer, lacquer or textured panel, any mismatch in grain direction, sheen level or batch becomes obvious under raking light.

Because our doors are made to measure with material and finish options chosen per space, we treat them as a bespoke item inside the joinery package. That is the difference between a door that disappears into the wall and one that reads as an awkward rectangle cut into it.

Stage 1 — What the design drawings must settle before we quote

Send us the drawing set while it is still editable. The following items are what our technical team checks, and each one changes either the price or the build-up:

Drawing itemWhat we need to seeWhy it matters
Door scheduleLeaf width and height per opening, hinge side, opening direction, quantity per room or floorSets the made-to-measure leaf size and lets us flag non-standard proportions early
Wall build-up sectionLayer-by-layer make-up of the finished wall: frame, board, substrate, final finish and its thicknessDetermines reveal depth so the leaf sits flush with the completed face, not the bare structure
Finished floor levelFFL at both sides of the opening, including screed, waterproofing and the final floor coveringSets the undercut and prevents a gap that is too large or a leaf that fouls the finished floor
Finish scheduleSpecified surface for each door: veneer species and cut, lacquer colour and sheen, laminate or panel referenceLets us match the door to the adjacent wall panels and cabinetry from the same batch where required
Operating detailPreferred handleless method — push-open mechanism, recessed edge pull or integrated grooveFixes the edge profile and any clearance needed for the mechanism
Adjacent servicesSwitches, sockets, concealed cabling, lighting circuits and skirting near the openingAvoids a swing arc that clashes with ironmongery or a service run cut through the reveal

If your drawings do not yet show build-ups at this level, tell us. We can work from the room layout and confirm the make-up with your designer or builder before production, which is one of the reasons our interior design services sit inside the project scope rather than alongside it.

Stage 2 — Site requirements we confirm before production starts

Drawings describe intent; site conditions decide whether that intent can be built. Before we commit a door to the factory schedule, we cross-check these on site or from your site information:

Structure and setting-out

  • Headroom above the opening. Concealed frames need depth in the header. Under a low slab, a beam or a services zone, the leaf may have to be reduced in height or the wall line built out — a decision worth making on paper, not on site with a saw.
  • Wall thickness and stability. The frame needs a solid, true surrounding structure. Where the partition is light-gauge steel or a cavity build, we confirm how the frame is supported before the boards go up.
  • Adjacent returns and reveals. A concealed door next to a window reveal, a column or a return wall needs a clear line of sight for the opening edge. Tight reveals are where these doors get compromised most often.

Levels and thresholds

  • Floor build-up on both sides. Where one side is tiled with adhesive and the other is engineered timber over underlay, the two finished levels differ. We set the undercut to the higher finish and confirm the threshold detail.
  • Drainage falls in wet areas. A concealed door to a bathroom or laundry sits against a fallen screed. The threshold needs to be agreed with the tiler before the waterproofing is applied.

Finishes and matching

  • Panel and veneer continuity. Where concealed doors appear in a run of wall panelling, we produce the door face and the panels together so grain and sheen carry across the wall. Our Integrated Door & Paneling work is the clearest example of this approach.
  • Sample approval. We supply finish samples for sign-off against the interior scheme before production, and record the approved reference so reorders and later additions match.
  • Lighting conditions. Raking light from a window or a wall washer reveals surface imperfection. In these locations we confirm the sheen level and edge detail with your designer rather than defaulting to a standard specification.
Practical rule: if the door, the cladding and the cabinetry come from one manufacturer, one drawing set governs all three. Splitting them across suppliers is where tolerance disputes start.

Stage 3 — Sequencing on site so the installation goes quietly

Concealed doors reward a disciplined order of work. This is the sequence we plan projects around:

  1. Frames first. The concealed frame is set and aligned to the finished floor level and finished wall face before the partition boards are closed up. Getting this wrong is a demolition job, not an adjustment.
  2. Closing works second. Boards, plaster and the final finish are applied around the frame, protecting the frame face as specified in our fix notes.
  3. Leaves last. The door leaf and its finishing go on after wet trades and painting are complete, so the surface is not damaged during the rest of the fit-out.
  4. Commissioning and snagging. We check opening action, edge alignment against the wall plane and finish continuity, then close out with your site team. Our installation and after-sales support covers this inspection step along with spare parts for later maintenance.

Common coordination problems, and how to avoid them

Problem on siteUsual causePrevention at the drawing stage
Visible shadow gap around the leafReveal depth set to structural wall, not finished faceShow the full build-up with layer thicknesses on the section
Door will not swing clearFloor covering thicker than the drawing assumedRecord FFL including the final floor finish, both sides
Panel colour matches, grain does notDoor and cladding produced separatelyGroup door faces with panelling in one schedule and one production batch
Push mechanism fouls the finishFinish thickness applied over the operating edgeDetail which surfaces are finished on site and which arrive pre-finished
Frame loose in a light partitionNo support detail agreed for the surrounding structureConfirm frame support method with the wall builder before boards close

How to send us a concealed-door enquiry that comes back priced properly

The faster enquiries are the ones that arrive with the information already assembled. A useful pack contains:

  • Door schedule: sizes, quantities, hinge side and opening direction per room or floor
  • Sections through each door type showing the finished wall build-up
  • Finish schedule with veneer, lacquer or panel references from the interior scheme
  • Finished floor levels at each opening, including the final floor covering
  • Site photographs of the relevant partitions if setting-out has already started
  • Delivery destination and any access constraints for the fit-out phase

With that pack we can confirm specification, lead time and cost against your drawings, and flag anything that needs a design decision before production. As a single source for doors, joinery and finishes, Santerson Windows & Doors sits in the same package as our cabinetry and wall paneling, which is how projects in Australia — including villa work in Sydney, Melbourne, Perth and Willoughby — keep one coordination thread instead of several.

FAQ

When should concealed doors be introduced into a project?

At concept or design development. The wall build-up, floor levels and finish schedule all have to be designed around the door, so specifying it after closing works are drawn limits what can be achieved.

Can you match a concealed door to existing wall panelling on site?

In most cases we can match finish and grain direction from a physical sample or an approved reference. Where the surrounding panelling is also being renewed, producing both together gives the closest result.

Do you supply the frame as well as the leaf?

Yes. Concealed doors are supplied as a coordinated set with made-to-measure sizing, and we confirm the fixing and support detail for your wall construction before production.

What if my drawings do not include door sections?

Send the room layouts and finish schedule. We will propose build-up sections for your approval so the concealed door is designed into the wall rather than fitted to it afterwards.

SANTERSON manufactures made-to-measure interior doors, custom cabinetry and building materials for villa, hospitality and office projects, with design coordination, production, delivery and installation under one scope. Send your door schedule and drawings to discuss a specification — Contact Us.