A raised panel wardrobe looks simple on a drawing and complicated on site. The profiled door front has to stay flat, the moulding has to meet the rail at a clean corner, and the carcase behind it has to sit square in a room that is rarely square. Most of the arguments that appear at handover are decided earlier, in the submittal pack. If the documents you send for approval answer the questions a site team actually asks, production starts on the right assumption and the wardrobe arrives ready to hang.
Below is what we ask our own project teams to assemble for Raised Panel Wardrobes and the other families in the Classic Paneled Wardrobes range, together with the points we want confirmed before a single panel is cut.
What the submittal has to prove
A product submittal is not a brochure. It exists so that an architect, a main contractor and a client representative can each sign off on one thing: the item being manufactured is the item they specified, at the size and in the setting they control. For built-in joinery that means three proofs in one pack.
- Identity. Which collection, which door profile, which finish — named the same way on every sheet, so nobody is matching a sample to a code they have never seen.
- Fit. Dimensions taken from site, not from a tender drawing, with the surrounding floor, ceiling and services shown.
- Build-up. What the door is made of, how the mouldings are joined, what carries the load, and what the hardware is rated to carry.
When one of these three is missing, approval usually still happens — the risk simply moves to site, where it costs more to fix.
Item 1: Product identity and collection reference
State the exact product line and how it relates to the schedule entry in the specification. Raised panel fronts sit inside a paneled family, and each variant behaves differently on site: a raised moulding catches more light and therefore shows more grain variation than a flat front; an arched profile needs a different pressing route than a rectangular one.
| Schedule entry | What the submittal should carry |
|---|---|
| Raised panel fronts | Profile drawing of the moulding with the rebate depth, the raised face dimension and the corner joint method. |
| Recessed or shaker-style fronts in the same paneled family | The contrasting profile, so the reviewer can see which variant is being supplied rather than inferring it from a photograph. |
| Solid wood fronts in the classic paneled style | Species reference and movement allowance for the width being supplied. |
| Arched or moulded variants | Radius, whether the arch is struck in one piece or assembled, and the maximum front size available for that profile. |
Where a project mixes families — for instance Classic Paneled Solid Wood Wardrobes in the principal bedroom and a flat front elsewhere — show both profiles side by side on one sheet. Reviewers approve faster when they can compare rather than flip between pages.
Item 2: Site dimensions and the setting conditions
Paneled fronts expose out-of-square walls. A two-millimetre lean across a wardrobe run reads as a gap at the ceiling line, and no amount of scribing hides it once the mouldings are running horizontally. The submittal should carry dimensions taken after the floor finish and the ceiling set-out are fixed, not from an earlier base-build stage.
- Finished floor level and finished ceiling line, with the tolerance band across the run.
- Position of skirting, architraves and any projecting cornice that the carcase has to be cut around.
- Location of downlights, air diffusers, sprinkler heads and switch plates relative to the top rail.
- Door and window openings within reach of the run, including their swing arcs, so the front layout can be planned around them.
- Wall build-up: what the carcase will be fixed to, and whether that substrate takes the fixings proposed.
Our wardrobe production is made to measure for each project, so the pack should show where a dimension came from — site survey, architect's setting-out drawing, or both. If they disagree, record the difference and state which one governs. That single line saves a variation later.
Item 3: Construction build-up for the door front
This is where raised panel work differs from flat-front cabinetry, and it is worth stating plainly rather than leaving to a photograph. The pack should answer:
- Core and face. What the front is built from and how the profiled edge is formed — moulded from one substrate, or an applied moulding on a panel.
- Corner joints. How the stile meets the rail, and whether the joint is glued, pinned or floating to allow movement.
- Movement allowance. The gap left around the panel within its frame, stated for the widest front in the order.
- Flatness expectation. How the front is stored and packed before installation, since a warped paneled door cannot be corrected on site.
Where the reviewer's specification calls for a solid timber front and our build-up is a moulded or veneered construction, say so in the submittal with the reason — usually stability across a wide front. A stated deviation that gets accepted is worth far more than an unstated one discovered at handover.
Item 4: Carcase, internal layout and load cases
The doors get the attention; the inside decides whether the wardrobe is used. Give the reviewer a plan of every bay with its width, and note which bays are hanging, drawer or shelf focused — the same distinction we work to across Drawer Focused Modular Wardrobes and the shelf-led modular layouts.
- Carcase material, thickness and edge treatment, with the colour of the edge banding shown.
- Shelf span for each width, and what the shelf is expected to carry — folded linen behaves differently from a row of heavy boxes.
- Hanging rail heights for short and long garments, and whether any rail is drop-down.
- Integrated lighting: fitting type, where the transformer sits, and how it is reached for replacement.
- Plinth or recessed base detail, and how it clears the skirting.
Add one elevation with a person on it. Scale catches errors that numbers miss — a hanging bay planned too shallow, a drawer blocked by the door handle of the neighbouring front.
Item 5: Hardware schedule and duty ratings
Paneled fronts are heavier than flat ones, and the profile changes where a hinge can sit. List each item by manufacturer code, not by description alone, and match it to the front it is going on.
| Hardware | To state in the submittal |
|---|---|
| Hinges | Code, opening angle, mounting plate type, and the maximum door weight per pair against the weight of your largest front. |
| Drawer runners | Load rating, extension, soft-close option and the pull-out clearance behind the front. |
| Handles and knobs | Fixing centres, screw length through the profiled front, and whether the handle is supplied by others or by us. |
| Sliding systems | Track type, top or bottom guidance, and the floor tolerance the system accepts. |
| Integrated lighting | Profile, driver location, switching method and dimming compatibility. |
If a handle is supplied by others, include its fixing drawing in the same pack. A front drilled for a handle that has not yet been chosen is the most common avoidable error in paneled wardrobe work.
Item 6: Finish schedule and physical samples
Raised mouldings make a finish decision visible from three metres away. A sprayed lacquer wraps the profile cleanly; a foil or laminate edge shows at the transition where the moulding turns. The finish schedule should name each surface separately — door face, moulding edge, carcase exterior, shelf interior and plinth — because they are rarely identical.
- Send a sample that carries a profiled edge, not just a flat board offcut. A flat swatch tells the reviewer nothing about how the finish behaves on a moulding.
- Show the sheen level and the direction of any wood grain on wide fronts, with a note on which face the grain runs.
- State what is included in our customisation range for the specific product line — custom furniture materials and finishes are specified project by project, and available options vary between collections.
- Record the approved sample with a reference number and date, signed by the person who has authority to accept it.
Where the specification calls for a species or a colour standard, confirm the exact variant before cutting. Names travel badly between countries and suppliers; a numbered physical sample does not.
Item 7: Fire, moisture and use conditions
Built-in wardrobes sit against internal walls, next to bathrooms and under downlights that generate heat. Rather than claim compliance in general terms, state the actual condition for the project and the board or finish being supplied against it.
- Whether any part of the run sits in a wet area — an ensuite wall, a shared bathroom wall, or a room where moisture is expected during construction.
- The fire classification required by the specifier for the lining material and the finish, with test documentation attached rather than summarised.
- Clearance to recessed luminaires and any heat source above the carcase.
- For apartment and hotel work, whether the front needs a closers or self-closing hinge to meet the specifier's requirements.
Certification claims belong in the pack only when they are documented for the material actually being supplied. Where our standard build-up differs from what the specification assumes, we flag it at submittal stage and let the reviewer decide.
Item 8: Tolerances, sequencing and site interface
This section is where a submittal earns its keep. Name the trades that touch your work and what each one owes you.
- Painting or wall finish: which side of the front edge the decoration finishes to, and whether a shadow gap is intended.
- Flooring: installed before or after the carcase, and who makes good around the plinth.
- Electrical: first fix position for internal lighting and any shaver or driver socket, confirmed against our setting-out drawing.
- Plumbing: not usually in a wardrobe, but relevant where a run shares a wall with an ensuite basin.
- Acoustic and fire stopping at the ceiling junction, if the specification requires it.
Add a simple installation sequence: delivery route, storage location, protective covering for the fronts, fixing method to the substrate, and adjustment visit after other trades have finished. Our installation and after-sales support page describes how on-site fitting, inspection and snagging are handled; the submittal should say which of those steps apply to this project and who attends.
Item 9: Logistics, packaging and delivery condition
Paneled fronts are the part most often damaged in transit, because a raised moulding takes impact at its thinnest point. State how the goods travel and how they arrive.
- Assembled or flat-packed, and which units are supplied each way.
- Edge protection on fronts, glazing boards between faces, and corner guards on moulded edges.
- Panel numbers matched to the setting-out drawing, marked on the same face of every unit.
- Container or crate loading plan for international shipments, with the sequence matching the installation order.
- Delivery access at site: lift size, corridor width and whether the fronts fit the stair or lift as packed.
Our logistics and door-to-door delivery service covers freight by sea, air and rail with customs documentation and shipment tracking. For a specific project we confirm the Incoterms, route and delivery address in writing, because terms and duties change case to case.
Item 10: Approvals, sign-off and the record trail
Close the pack with a page that makes approval auditable. Include a document register listing every sheet and its revision, a signature block for each party who accepts the product, and an explicit list of assumptions we manufactured against.
- Revision number and date on every drawing; superseded sheets marked as void.
- Named signatories for client, architect and contractor, with the date of acceptance.
- Assumptions stated plainly — substrate type, finished floor level, handle supply by others.
- Open items carried forward, each with an owner and a required decision date before production release.
Production should not be released while an open item affects the front, the finish or the dimension. Everything else can be closed during manufacture.
A short pre-production checklist
- Door profile drawing attached, with corner joint and movement allowance stated.
- Site-surveyed dimensions signed, with the governing source named.
- Carcase build-up, edge treatment and shelf spans shown for every bay width.
- Hardware codes matched to front weights, with by-others items drawn.
- Profiled finish sample signed and referenced.
- Fire and moisture conditions documented against the material supplied.
- Trade interface list and installation sequence attached.
- Packaging, panel numbering and site access confirmed.
- Approval signatures and assumption register complete.
Common gaps we see in returned submittals
A flat swatch for a profiled front. The reviewer approves the colour, then sees the moulding edge on site and rejects it. Send a profiled sample.
Tender dimensions carried into production. Rooms move during construction. Re-survey after finishes are set.
Hardware described, not specified. "Soft-close hinges" is not an orderable item. Give the code and the load rating.
Silence on who supplies the handles. Assume nothing; put it in writing with a fixing drawing.
No elevation with scale. Proportion errors survive a numbers-only review and appear at handover.
How we work through submittals
SANTERSON has manufactured furniture and building materials since 2008 for villa, hospitality and office projects, and wardrobe joinery is one of the built-in lines we produce to project-specific sizes, layouts and finishes. For a paneled wardrobe package we prepare the profile drawings, the setting-out drawings and the finish samples as one set, so the reviewer signs one pack rather than chasing three.
If you are assembling a submittal for a wardrobe package and want the profile, build-up and hardware sections drafted against your specification, send us the schedule entry and the room dimensions. We will return the sheets with our construction stated line by line, so any difference between your assumption and ours is settled before production rather than at handover.
Contact our project team to start that review.Questions buyers ask about paneled wardrobe submittals
Is a raised panel front solid timber or engineered?
It depends on the collection and the front size. We state the construction for each profile in the submittal, including how the moulding is joined and how movement is accommodated, so the reviewer can compare it with the specification.
Do you supply handles?
Hardware can be matched to the project or supplied by others. Either way the fixing drawing has to be in the pack before the fronts are drilled.
When should site dimensions be taken?
After finished floor levels and the ceiling set-out are fixed, and before any front is ordered. We produce made-to-measure units against signed survey dimensions.
Can a wardrobe run coordinate with other joinery in the same project?
Yes. Where fronts, doors and wall panelling share a finish or profile, we draw them on one sheet so the reviewer approves a single standard. Projects that combine built-in wardrobes with full-house custom wall cabinet work are handled this way.