An eight-metre swim spa is not a purchase you make from a photograph. Before you raise a purchase order for the Outdoor Swim Spa WS-130AⅢ, the questions below are the ones that decide whether the unit arrives ready to install or turns into a site problem.
1. Does the shell size fit the plot, not just the drawing?
The catalogue lists this model at 8000 × 3000 × 1400 mm. That is the shell dimension, and it is only the starting point for a site plan. Ask your supplier to confirm, in writing, the overall footprint including steps, plant access and any insulation package, then measure it against the terrace, setback and clearance you actually have.
- Can the base slab or deck carry the shell when it is full of water, plus the people using it? Water alone weighs roughly a tonne per cubic metre, so confirm the structural support with your engineer before delivery, not after.
- How will the unit reach its final position — crane, forklift or a manual carry route? Check the access width and any overhead obstruction on site.
- Where does drainage go, and is there a drain close enough to take a full drain-down?
2. Which equipment set am I actually buying?
Two variants sit side by side in the catalogue with the same external dimensions but different internals. Comparing them before you commit is worthwhile, because the specification drives both the electrical load and how you will use the water.
| Catalogue dimensions | 8000 × 3000 × 1400 mm on both variants |
| Swim training system | Listed for WS-130AⅢ; not listed for the WS-130AⅢ-U variant, so confirm which one your quotation covers |
| Water pumps | 1 pc on WS-130AⅢ; 4 pcs on WS-130AⅢ-U |
| Jet total | 20 pcs on WS-130AⅢ; 23 pcs on WS-130AⅢ-U |
| LED lights | 7 on WS-130AⅢ; 5 on WS-130AⅢ-U |
| Total power shown in the catalogue | 10.85 kW (WS-130AⅢ) and 11.85 kW (WS-130AⅢ-U) |
| Filter pump, control system | 1 each on both variants |
Ask for a line-by-line equipment list against the exact model code on the quotation. The suffix changes what is included, and a quotation that says only "WS-130A series" is not a specification.
3. What electrical supply does the site need?
The power figures printed in the catalogue describe the equipment set shown for that model; they are not a guarantee for your configuration. Request the connected load and recommended supply for the build you are ordering: single or three phase, breaker rating, cable size, earthing and protective-device requirements. Hand that sheet to your local electrician early — upgrading a supply after the spa arrives is expensive.
Also ask where the supplier's electrical scope ends. The unit is built and tested at the factory; the distribution board, dedicated circuit and any local inspection are site work.
4. Which options suit my climate and usage?
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each one should earn its place based on how the water will be used:
- A heat pump matters if the spa is used outside the warm months; it changes both capital cost and running load.
- Insulation reduces heat loss, which is where most of the energy goes on an outdoor unit — ask what else is needed to hold temperature overnight.
- Sand filtration versus the standard filter pump is a maintenance question: ask for the service interval and which parts are consumables.
- UV sterilisation reduces chemical load but does not replace filtration.
- Steps change both entry height and footprint, so settle them before the slab is poured.
Ask for the priced option list to sit on the quotation itself, not buried in an email thread.
5. Who handles freight, customs and site delivery?
A swim spa crossing an ocean is a small logistics project of its own. As a one-stop project furnishing supplier, SANTERSON arranges freight forwarding, export paperwork, packaging and container loading, and door-to-door delivery on the projects it takes on. Confirm in writing which Incoterm applies to your order, who clears customs at destination, who carries duty, and whether cargo insurance is included or optional.
Then settle the last leg: what vehicle delivers, whether lifting gear comes with it, and who is responsible if the delivery point cannot be reached by that vehicle.
6. What happens after the container arrives?
Ask about installation guidance, commissioning support, the warranty wording and its exclusions, and spare parts for pumps, jets, controls and lighting. For villa and resort projects where a swim spa sits alongside other items from the Outdoor Furniture for Villas and Resorts range, also ask whether delivery timing is coordinated across packages — a spa should not land before the deck meant to carry it exists.
Documents worth requesting before you sign: the equipment schedule for the exact model code; the electrical specification; a dimensioned drawing including steps and plant access; the priced option list; the packing list and container plan; and the warranty and spare-parts terms.
7. If the standard shell does not fit, what else is available?
Where an eight-metre rectangular shell is the wrong shape for the site, the same range offers other configurations: WS-130BⅢ at 9950 × 3000 × 1430 mm, and a Customizable Shape Outdoor Spa for square, round, oval and curved layouts. The wider Swimming Pools and Swim Spas catalogue covers further lengths and equipment combinations.
Send the site dimensions, how you intend to use the water — lap swimming, hydrotherapy or both — and your local supply details, and the SANTERSON team can confirm which configuration and option set suits the project: through Custom & OEM Service where a bespoke build is needed, or from the standard catalogue where it is not.